OSHA SearchOSHA records by employer

PSL Construction LLC: OSHA inspections and violations

Manheim, Pennsylvania · Framing Contractors · NAICS 238130

4inspections
15citation items
$17,001current penalties
Jul 14, 2025last inspection

OSHA has inspected PSL Construction LLC 4 times in Pennsylvania since 2010.

The latest one began on Jul 14, 2025 after a complaint, in Manheim.

Those inspections ended with 15 citation items: 13 serious and 2 other-than-serious.

Penalties were first proposed at $28,369 and now stand at $17,001, 40% lower after settlements or reviews.

Scaffolds, general requirements comes up most often in these citations: 4 items under 1926.451.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and PSL Construction LLC averages $2,837 (2 cited inspections).

PSL Construction LLC: OSHA citation items per year, 2010 to 2025
Citation items per year, by inspection date.

Pennsylvania · latest 90 days of OSHA records

300employers cited

7 of them in the same industry

Get notified the morning OSHA posts each new citation in Pennsylvania: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Pennsylvania

Checking a subcontractor, a client or your own company? Watch PSL Construction LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 348371451 OPENED JUL 14, 2025Closed

Complaint · Partial · Safety · 4 employees at the site · Closed Jul 22, 2026

430 South Oak Street, Manheim, PA 17545 · Framing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.602(c)(1)(vi) · Earthmovers and forklifts in construction
Serious$2,837$2,837Sep 24, 2025Final

Inspection 348248410 OPENED MAY 15, 2025Closed

Planned · Partial · Safety · 2 employees at the site · Closed Sep 8, 2025

141-153 Penn Station Lane Penn Station Townhomes, Manheim, PA 17545 · Framing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.602(d) · Earthmovers and forklifts in construction
Serious$2,837$2,837Jun 17, 2025Final

Inspection 314244336 OPENED MAR 8, 2011Closed

Planned · Partial · Safety · 6 employees at the site · Closed Sep 29, 2011

Macarthur Drive, Carlisle, PA 17013 · Framing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.20(b)(2) · Construction safety programs
Serious$4,200$2,520Apr 15, 2011Closed
Citation 1, item 2
29 CFR 1926.405(g)(2)(iv) · Job-site wiring
Serious$1,800$1,080Apr 15, 2011Closed
Citation 1, item 3a
29 CFR 1926.451(a)(6) · Scaffolds, general requirements
Serious$4,200$2,520Apr 15, 2011Closed
Citation 1, item 3b
29 CFR 1926.451(c)(2)(iv) · Scaffolds, general requirements
Serious$0$0Apr 15, 2011Closed
Citation 1, item 3c
29 CFR 1926.451(c)(2)(v) · Scaffolds, general requirements
Serious$0$0Apr 15, 2011Closed
Citation 1, item 3d
29 CFR 1926.451(g)(1)(vii) · Scaffolds, general requirements
Serious$0$0Apr 15, 2011Closed
Citation 1, item 4
29 CFR 1926.1052(c)(1)(ii) · Stairways in construction
Serious$1,800$1,080Apr 15, 2011Closed
Citation 2, item 1
29 CFR 1926.501(b)(13) · Fall protection in construction
Serious$8,400$2,520Apr 15, 2011Closed
Citation 3, item 1
29 CFR 1926.602(c)(1)(vi) · Earthmovers and forklifts in construction
Other-than-serious$0$0Apr 15, 2011Closed
Citation 3, item 2
29 CFR 1926.605(d)(1) · Marine operations and equipment
Other-than-serious$0$0Apr 15, 2011Closed

Inspection 312486640 OPENED NOV 9, 2010Closed

Referral · Complete · Safety · 4 employees at the site · Closed Feb 7, 2011

165 Gay St., Philadelphia, PA 19127 · Roofing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.501(b)(13) · Fall protection in construction
Serious$2,295$1,607Dec 3, 2010Closed
Citation 1, item 1b
29 CFR 1926.501(b)(14) · Fall protection in construction
Serious$0$0Dec 3, 2010Closed
Citation 1, item 1c
29 CFR 1926.503(a)(1) · Fall protection training in construction
Serious$0$0Dec 3, 2010Closed

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.1052 · Stairways in construction

29 CFR 1926.1052(c)(1)(ii)

(ii) One stairrail system along each unprotected side or edge.

29 CFR 1926.20 · Construction safety programs

29 CFR 1926.20(b)(2)

(2) Such programs shall provide for frequent and regular inspections of the job sites, materials, and equipment to be made by competent persons designated by the employers.

29 CFR 1926.405 · Job-site wiring

29 CFR 1926.405(g)(2)(iv)

(iv) Strain relief. Flexible cords shall be connected to devices and fittings so that strain relief is provided which will prevent pull from being directly transmitted to joints or terminal screws.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.501 · Fall protection in construction

29 CFR 1926.503 · Fall protection training in construction

29 CFR 1926.602 · Earthmovers and forklifts in construction

29 CFR 1926.605 · Marine operations and equipment

Other framing contractors employers in Pennsylvania

Alert subscribers get notified of each newly cited employer in Pennsylvania the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.