Inspection 343106621 OPENED APR 24, 2018Closed
212 Cemetery Avenue, Columbia, TN 38401 · Construction Machinery Manufacturing · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
Pugmill Systems, Inc. has 2 OSHA inspections on record in Tennessee, the first in 2018.
OSHA's last visit started on Apr 24, 2018 to monitor an earlier case, in Columbia.
Across those inspections OSHA issued 19 citation items: 11 serious and 8 other-than-serious.
OSHA proposed $2,100 in penalties. After settlements and reviews the total is $1,600, down 24%.
Most often, OSHA cited 1910.107, spray painting and finishing (5 items).
For context, across all manufacturing employers the median penalty per cited inspection since 2015 is $3,600. Pugmill Systems, Inc. averages $1,600 over 1 cited inspection in that time.
Tennessee · latest 90 days of OSHA records
349employers cited
Get notified the morning OSHA posts each new citation in Tennessee: the employer, the site address, the rules broken and the penalty.
See who gets cited nextLatest cited in Tennessee
Checking a subcontractor, a client or your own company? Watch Pugmill Systems, Inc. and get notified the morning OSHA posts a new citation for it.
Watch this company212 Cemetery Avenue, Columbia, TN 38401 · Construction Machinery Manufacturing · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
212 Cemetery Avenue, Columbia, TN 38401 · Construction Machinery Manufacturing · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1a 29 CFR 1910.107(c)(5) · Spray painting and finishing |
Serious | $700 | $560 | Apr 9, 2018 | Final |
| Citation 1, item 1b 29 CFR 1910.107(d)(4) · Spray painting and finishing |
Serious | $0 | $0 | Apr 9, 2018 | Final |
| Citation 1, item 1c 29 CFR 1910.107(e)(2) · Spray painting and finishing |
Serious | $0 | $0 | Apr 9, 2018 | Final |
| Citation 1, item 1d 29 CFR 1910.107(e)(5) · Spray painting and finishing |
Serious | $0 | $0 | Apr 9, 2018 | Final |
| Citation 1, item 1e 29 CFR 1910.107(g)(2) · Spray painting and finishing |
Serious | $0 | $0 | Apr 9, 2018 | Final |
| Citation 1, item 2a 29 CFR 1910.134(c)(2)(i) · Respiratory protection |
Serious | $600 | $480 | Apr 9, 2018 | Final |
| Citation 1, item 2b 29 CFR 1910.134(c)(2)(ii) · Respiratory protection |
Serious | $0 | $0 | Apr 9, 2018 | Final |
| Citation 1, item 3a 29 CFR 1910.134(a)(2) · Respiratory protection |
Serious | $700 | $560 | Apr 9, 2018 | Final |
| Citation 1, item 3b 29 CFR 1910.134(d)(1)(iii) · Respiratory protection |
Serious | $0 | $0 | Apr 9, 2018 | Final |
| Citation 1, item 3c 29 CFR TDLWD RULE 800-01-01-.07(2)(B)1 |
Serious | $0 | $0 | Apr 9, 2018 | Final |
| Citation 1, item 3d 29 CFR TDLWD RULE 800-01-01-.07(2)(D) |
Serious | $0 | $0 | Apr 9, 2018 | Final |
| Citation 2, item 1a 29 CFR 1910.303(b)(2) · Electrical equipment, general requirements |
Other-than-serious | $0 | $0 | Apr 9, 2018 | Final |
| Citation 2, item 1b 29 CFR 1910.303(f)(1) · Electrical equipment, general requirements |
Other-than-serious | $0 | $0 | Apr 9, 2018 | Final |
| Citation 2, item 1c 29 CFR 1910.303(f)(2) · Electrical equipment, general requirements |
Other-than-serious | $0 | $0 | Apr 9, 2018 | Final |
| Citation 2, item 2a 29 CFR 1910.1200(e)(1) · Hazard communication |
Other-than-serious | $100 | $0 | Apr 9, 2018 | Final |
| Citation 2, item 2b 29 CFR 1910.1200(f)(6)(ii) · Hazard communication |
Other-than-serious | $0 | $0 | Apr 9, 2018 | Final |
| Citation 2, item 2c 29 CFR 1910.1200(h)(1) · Hazard communication |
Other-than-serious | $0 | $0 | Apr 9, 2018 | Final |
| Citation 2, item 2d 29 CFR TDLWD RULE 800-01-09-.06(2) |
Other-than-serious | $0 | $0 | Apr 9, 2018 | Final |
| Citation 2, item 2e 29 CFR TDLWD RULE 800-01-09-.07(4) |
Other-than-serious | $0 | $0 | Apr 9, 2018 | Final |
Current text from the Code of Federal Regulations. Some citations were issued under older wording.
29 CFR 1910.107(c)(5)
(5) Combustible residues, areas. Unless specifically approved for locations containing both deposits of readily ignitable residue and explosive vapors, there shall be no electrical equipment in any spraying area, whereon deposits of combustible residues may readily accumulate, except wiring in rigid conduit or in boxes or fittings containing no taps, splices, or terminal connections.
29 CFR 1910.107(d)(4)
(4) Fan-rotating element. The fan-rotating element shall be nonferrous or nonsparking or the casing shall consist of or be lined with such material. There shall be ample clearance between the fan-rotating element and the fan casing to avoid a fire by friction, necessary allowance being made for ordinary expansion and loading to prevent contact between moving parts and the duct or fan housing. Fan blades shall be mounted on a shaft sufficiently heavy to maintain perfect alignment even when the blades of the fan are heavily loaded, the shaft preferably to have bearings outside the duct and booth. All bearings shall be of the self-lubricating type, or lubricated from the outside duct.
29 CFR 1910.107(e)(2)
(2) Quantity. The quantity of flammable liquids or liquids with a flashpoint greater than 199.4 °F (93 °C) kept in the vicinity of spraying operations shall be the minimum required for operations and should ordinarily not exceed a supply for 1 day or one shift. Bulk storage of portable containers of flammable liquids or liquids with a flashpoint greater than 199.4 °F (93 °C) shall be in a separate, constructed building detached from other important buildings or cut off in a standard manner.
Alert subscribers get notified of each newly cited employer in Tennessee the morning it is posted. See the alert plans.
Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.