OSHA SearchOSHA records by employer

R.C. Retaining Walls, Inc.: OSHA inspections and violations

Emory, Texas · Other Heavy and Civil Engineering Construction · NAICS 237990

1inspections
7citation items
$18,570current penalties
Mar 11, 2024last inspection

R.C. Retaining Walls, Inc. has one OSHA inspection on record in Texas.

OSHA opened it on Mar 11, 2024 after a fatality or catastrophe, in Emory.

From that inspection OSHA issued 7 citation items: 6 serious and 1 other-than-serious.

OSHA proposed $34,108 in penalties. After settlements and reviews the total is $18,570, down 46%.

Most often, OSHA cited 1926.605, marine operations and equipment (3 items).

For context, across all construction employers the median penalty per cited inspection since 2015 is $3,080. R.C. Retaining Walls, Inc. averages $18,570 over 1 cited inspection in that time.

1 inspection on this page followed a fatal incident.

R.C. Retaining Walls, Inc.: OSHA citation items per year, 2024 to 2024
Citation items per year, by inspection date.

Texas · latest 90 days of OSHA records

399employers cited

Get notified the morning OSHA posts each new citation in Texas: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Texas

Checking a subcontractor, a client or your own company? Watch R.C. Retaining Walls, Inc. and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 347340952 OPENED MAR 11, 2024Closed

Fatality or catastrophe · Complete · Safety · 20 employees at the site · Closed Sep 27, 2024

Anglers Point Dr, Lot #19, New Development - Lake Fork Lake Lot Off Of Raines Cr 3220,, Emory, TX 75440 · Other Heavy and Civil Engineering Construction · OSHA's record · Phone and website on Google Maps

Incident on Mar 8, 2024 (fatal): Employee dies from drowning while building boat dock

At 2:15 p.m. on March 8, 2024, an employee working as a construction laborer for a retaining walls contractor was working on a crew that had just prepared a site. The crew was getting ready to drive their first 6-inch by 6-inch by 30-foot-long beam into the lakebed approximately 104 feet into the water. The crew had a barge with an excavator in place that they would use to drive the wooden beams into the lake bottom. The beams were being floated out to the crew working on the barge. The employee and a coworker were on the bank placing the beam into the water. The employee worked in waist deep water catching the beam and ensuring it was guided towards the crew on the barge who were to retrieve the beam. The crew had already stood up the beam on its end, positioned it, and were trying to ensure that it was level before the excavator drove it down into the muddy lake bottom. It was windy, and the beam got away from the crew on the barge as they were attempting to ensure it was level. The beam fell towards the center of the lake and started floating away. Allegedly, the employee immediately reacted since he was already in the water and swam after the beam. He swam approximately 15 feet from the barge when he turned around to return to his original position. The employee slipped under the water. He did come resurface once but appeared to be taking in water and was in obvious need of help. A coworker (the foreman) took off his heavy clothing and jumped in to assist the employee, using a 2-inch by 6-inch board as a flotation device. The employee could not find the employee, so he returned to the shore. The employee never resurfaced, and his body was later recovered by a search crew using sonar in boats and with the assistance of the game warden. The employee had died due to drowning.

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.106(a) · Working over or near water
Serious$4,610$4,610Aug 27, 2024Final
Citation 1, item 1b
29 CFR 1926.605(d)(3) · Marine operations and equipment
Serious$6,452$0Aug 27, 2024Final
Citation 1, item 2a
29 CFR 1926.106(c) · Working over or near water
Serious$4,610$4,610Aug 27, 2024Final
Citation 1, item 2b
29 CFR 1926.605(d)(2) · Marine operations and equipment
Serious$6,452$0Aug 27, 2024Final
Citation 1, item 3
29 CFR 1926.106(d) · Working over or near water
Serious$6,452$5,162Aug 27, 2024Final
Citation 1, item 4
29 CFR 1926.605(b)(2) · Marine operations and equipment
Serious$4,610$3,688Aug 27, 2024Final
Citation 2, item 1
29 CFR 1904.40(a) · Giving injury records to OSHA
Other-than-serious$922$500Aug 27, 2024Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1904.40 · Giving injury records to OSHA

29 CFR 1904.40(a)

(a) Basic requirement. When an authorized government representative asks for the records you keep under part 1904, you must provide copies of the records within four (4) business hours.

29 CFR 1926.106 · Working over or near water

29 CFR 1926.106(a)

(a) Employees working over or near water, where the danger of drowning exists, shall be provided with U.S. Coast Guard-approved life jacket or buoyant work vests.

29 CFR 1926.106(c)

(c) Ring buoys with at least 90 feet of line shall be provided and readily available for emergency rescue operations. Distance between ring buoys shall not exceed 200 feet.

29 CFR 1926.605 · Marine operations and equipment

Other other heavy and civil engineering construction employers in Texas

Alert subscribers get notified of each newly cited employer in Texas the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.