OSHA SearchOSHA records by employer

Regeneration, LLC: OSHA inspections and violations

Lanett, Alabama · Site Preparation Contractors · NAICS 238910

2inspections
6citation items
$15,996current penalties
Oct 25, 2017last inspection

Since 2017, OSHA inspectors have visited Regeneration, LLC in Alabama 2 times.

The most recent inspection opened on Oct 25, 2017 to follow up on an earlier case, in Lanett.

In all, OSHA issued 6 citation items: 6 serious.

The proposed penalties came to $24,626; today they stand at $15,996, 35% less.

The rule cited most here is 1926.850 (preparatory operations), 4 times.

Among construction employers, the typical cited inspection since 2015 ends with a $3,080 penalty. Regeneration, LLC averages $15,996 across 1 cited inspection.

1 inspection on this page followed a fatal incident.

Regeneration, LLC: OSHA citation items per year, 2017 to 2017
Citation items per year, by inspection date.

Alabama · latest 90 days of OSHA records

100employers cited

Get notified the morning OSHA posts each new citation in Alabama: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Alabama

Checking a subcontractor, a client or your own company? Watch Regeneration, LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 342733979 OPENED OCT 25, 2017Closed

Follow-up · Partial · Safety · 1 employee at the site · Closed Nov 3, 2017

S Gilmer Avenue, Lanett, AL 36863 · Site Preparation Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 342116860 OPENED FEB 14, 2017Closed

Fatality or catastrophe · Partial · Safety · 8 employees at the site · Closed Nov 2, 2018

S Gilmer Avenue, Lanett, AL 36863 · Site Preparation Contractors · OSHA's record · Phone and website on Google Maps

Incident on Feb 14, 2017 (fatal): Employee falls through unsupported subflooring and is killed

At 11:45 a.m. on February 14, 2017, an employee was engaged in deconstruction related activities on the fourth level of a five story building. Several coworkers removed some maple flooring from the wooden subflooring and the employee fell through the subflooring when it collapsed. The employee fell approximately 40 feet to the ground and was killed.

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.850(a) · Preparatory operations
Serious$2,716$1,996Jul 19, 2017Final
Citation 1, item 2
29 CFR 1926.850(g) · Preparatory operations
Serious$2,716$2,500Jul 19, 2017Final
Citation 1, item 3a
29 CFR 1926.850(j) · Preparatory operations
Serious$3,803$3,000Jul 19, 2017Final
Citation 1, item 3b
29 CFR 1926.854(d) · Removal of walls, masonry sections, and chimneys
Serious$0$0Jul 19, 2017Final
Citation 1, item 4
29 CFR 1926.850(k) · Preparatory operations
Serious$2,716$2,500Jul 19, 2017Final
Citation 1, item 5
29 CFR 1926.859(g) · Mechanical demolition
Serious$12,675$6,000Jul 19, 2017Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.850 · Preparatory operations

29 CFR 1926.850(a)

(a) Prior to permitting employees to start demolition operations, an engineering survey shall be made, by a competent person, of the structure to determine the condition of the framing, floors, and walls, and possibility of unplanned collapse of any portion of the structure. Any adjacent structure where employees may be exposed shall also be similarly checked. The employer shall have in writing evidence that such a survey has been performed.

29 CFR 1926.850(g)

(g) Where a hazard exists to employees falling through wall openings, the opening shall be protected to a height of approximately 42 inches.

29 CFR 1926.850(j)

(j) Except for the cutting of holes in floors for chutes, holes through which to drop materials, preparation of storage space, and similar necessary preparatory work, the demolition of exterior walls and floor construction shall begin at the top of the structure and proceed downward. Each story of exterior wall and floor construction shall be removed and dropped into the storage space before commencing the removal of exterior walls and floors in the story next below.

29 CFR 1926.854 · Removal of walls, masonry sections, and chimneys

29 CFR 1926.859 · Mechanical demolition

Other site preparation contractors employers in Alabama

Alert subscribers get notified of each newly cited employer in Alabama the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.