3inspections
11citation items
$16,487current penalties
Oct 24, 2024last inspection

Roberto Trujillo has 3 OSHA inspections on record in Illinois, the first in 2016.

OSHA's last visit started on Oct 24, 2024 as a planned inspection, in Joliet, and the case has not closed yet.

Across those inspections OSHA issued 11 citation items: 8 serious and 3 other-than-serious.

OSHA proposed $16,487 in penalties and the amount has not been reduced.

Most often, OSHA cited 1926.501, fall protection in construction (3 items).

For context, across all construction employers the median penalty per cited inspection since 2015 is $3,080. Roberto Trujillo averages $5,496 over 3 cited inspections in that time.

Roberto Trujillo: OSHA citation items per year, 2016 to 2024
Citation items per year, by inspection date.

Want to know if OSHA cites Roberto Trujillo again? Add it to a watchlist and we will email you the morning the citation shows up.

Watch this company

Inspection history

Inspection 347843179 OPENED OCT 24, 2024Open

Planned · Partial · Safety · 3 employees at the site · Open

1814 Pebble Beach Drive, Joliet, IL 60403 · New Single-Family Housing Construction (except For-Sale Builders) · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.501(b)(13) · Fall protection in construction
Serious$4,839$4,839Jan 16, 2025Final

Inspection 344963657 OPENED OCT 7, 2020Closed

Planned · Partial · Safety · 5 employees at the site · Closed Jun 29, 2023

620 N. Main St., Naperville, IL 60563 · Roofing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.501(b)(13) · Fall protection in construction
Serious$4,048$4,048Oct 26, 2020Final
Citation 1, item 2
29 CFR 1926.503(b)(1) · Fall protection training in construction
Other-than-serious$0$0Oct 26, 2020Final

Inspection 341625085 OPENED MAY 31, 2016Closed

Unprogrammed related · Partial · Safety · 2 employees at the site · Closed Nov 19, 2019

1214, 1216, 1218, 1220 Garden Drive, Danville, IL 61832 · Roofing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.20(b)(1) · Construction safety programs
Serious$2,000$2,000Jul 27, 2016Final
Citation 1, item 1b
29 CFR 1926.20(b)(2) · Construction safety programs
Serious$0$0Jul 27, 2016Final
Citation 1, item 2a
29 CFR 1926.501(b)(13) · Fall protection in construction
Serious$2,800$2,800Jul 27, 2016Final
Citation 1, item 2b
29 CFR 1926.503(a)(1) · Fall protection training in construction
Serious$0$0Jul 27, 2016Final
Citation 1, item 3a
29 CFR 1926.1053(b)(1) · Ladders in construction
Serious$2,000$2,000Jul 27, 2016Final
Citation 1, item 3b
29 CFR 1926.1060(a) · Ladder and stairway training
Serious$0$0Jul 27, 2016Final
Citation 2, item 1
29 CFR 1903.19(c)(1) · Proving cited hazards were fixed
Other-than-serious$400$400Oct 3, 2016Final
Citation 2, item 2
29 CFR 1903.19(d)(1) · Proving cited hazards were fixed
Other-than-serious$400$400Oct 3, 2016Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1903.19 · Proving cited hazards were fixed

29 CFR 1903.19(c)(1)

(c) Abatement certification. (1) Within 10 calendar days after the abatement date, the employer must certify to OSHA (the Agency) that each cited violation has been abated, except as provided in paragraph (c)(2) of this section.

29 CFR 1903.19(d)(1)

(d) Abatement documentation. (1) The employer must submit to the Agency, along with the information on abatement certification required by paragraph (c)(3) of this section, documents demonstrating that abatement is complete for each willful or repeat violation and for any serious violation for which the Agency indicates in the citation that such abatement documentation is required.

29 CFR 1926.1053 · Ladders in construction

29 CFR 1926.1053(b)(1)

(1) When portable ladders are used for access to an upper landing surface, the ladder side rails shall extend at least 3 feet (.9 m) above the upper landing surface to which the ladder is used to gain access; or, when such an extension is not possible because of the ladder's length, then the ladder shall be secured at its top to a rigid support that will not deflect, and a grasping device, such as a grabrail, shall be provided to assist employees in mounting and dismounting the ladder. In no case shall the extension be such that ladder deflection under a load would, by itself, cause the ladder to slip off its support.

29 CFR 1926.1060 · Ladder and stairway training

29 CFR 1926.20 · Construction safety programs

29 CFR 1926.501 · Fall protection in construction

29 CFR 1926.503 · Fall protection training in construction

Other roofing contractors employers in Illinois

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.