Indianapolis, Indiana · All Other Specialty Trade Contractors · NAICS 238990

1inspections
15citation items
$5,700current penalties
Jul 29, 2015last inspection

OSHA has inspected Rodriguez Framing LLC once in Indiana.

The inspection began on Jul 29, 2015, in Indianapolis; the case is still open.

That inspection ended with 15 citation items: 14 serious and 1 other-than-serious.

Penalties were first proposed at $10,350 and now stand at $5,700, 45% lower after settlements or reviews.

Construction safety programs comes up most often in these citations: 3 items under 1926.20.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and Rodriguez Framing LLC averages $5,700 (1 cited inspection).

Rodriguez Framing LLC: OSHA citation items per year, 2015 to 2015
Citation items per year, by inspection date.

Indiana · latest 90 days of OSHA records

78employers cited

Get notified the morning OSHA posts each new citation in Indiana: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Indiana

Checking a subcontractor, a client or your own company? Watch Rodriguez Framing LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 317869147 OPENED JUL 29, 2015Open

Unprogrammed other · Complete · Safety · 8 employees at the site · Open

5223 Mendenhall Dr, Indianapolis, IN 46241 · All Other Specialty Trade Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1910.1200(e)(1) · Hazard communication
Serious$450$249Oct 26, 2015Open
Citation 1, item 1b
29 CFR 1926.20(b)(1) · Construction safety programs
Serious$0$0Oct 26, 2015Open
Citation 1, item 2
29 CFR 1926.20(b)(2) · Construction safety programs
Serious$1,050$578Oct 26, 2015Open
Citation 1, item 3
29 CFR 1926.20(b)(3) · Construction safety programs
Serious$1,500$825Oct 26, 2015Open
Citation 1, item 4a
29 CFR 1926.21(b)(2) · Construction safety training
Serious$450$249Oct 26, 2015Open
Citation 1, item 4b
29 CFR 1926.454(a) · Scaffold training
Serious$0$0Oct 26, 2015Open
Citation 1, item 4c Serious$0$0Oct 26, 2015Open
Citation 1, item 5
29 CFR 1926.404(f)(6) · Ground-fault protection on job sites
Serious$1,500$825Oct 26, 2015Open
Citation 1, item 6
29 CFR 1926.416(e)(1) · Electrical safety in construction
Serious$1,500$825Oct 26, 2015Open
Citation 1, item 7
29 CFR 1926.501(b)(15) · Fall protection in construction
Serious$1,050$578Oct 26, 2015Open
Citation 1, item 8
29 CFR 1926.1402(b) · Ground conditions
Serious$1,500$825Oct 26, 2015Open
Citation 1, item 9
29 CFR 1926.1412(d)(1) · Inspections
Serious$450$249Oct 26, 2015Open
Citation 1, item 10 Serious$450$249Oct 26, 2015Open
Citation 1, item 11
29 CFR 1926.1425(c)(3) · Keeping clear of the load
Serious$450$248Oct 26, 2015Open
Citation 2, item 1
29 CFR 1926.503(b)(1) · Fall protection training in construction
Other-than-serious$0$0Oct 26, 2015Open

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.1200 · Hazard communication

29 CFR 1910.1200(e)(1)

(e) Written hazard communication program. (1) Employers shall develop, implement, and maintain at each workplace, a written hazard communication program which at least describes how the criteria specified in paragraphs (f), (g), and (h) of this section for labels and other forms of warning, safety data sheets, and employee information and training will be met, and which also includes the following:

29 CFR 1926.1402 · Ground conditions

29 CFR 1926.1402(b)

(b) The equipment must not be assembled or used unless ground conditions are firm, drained, and graded to a sufficient extent so that, in conjunction (if necessary) with the use of supporting materials, the equipment manufacturer's specifications for adequate support and degree of level of the equipment are met. The requirement for the ground to be drained does not apply to marshes/wetlands.

29 CFR 1926.1412 · Inspections

29 CFR 1926.1412(d)(1)

(d) Each shift. (1) A competent person must begin a visual inspection prior to each shift the equipment will be used, which must be completed before or during that shift. The inspection must consist of observation for apparent deficiencies. Taking apart equipment components and booming down is not required as part of this inspection unless the results of the visual inspection or trial operation indicate that further investigation necessitating taking apart equipment components or booming down is needed. Determinations made in conducting the inspection must be reassessed in light of observations made during operation. At a minimum the inspection must include all of the following:

29 CFR 1926.1425 · Keeping clear of the load

29 CFR 1926.1430 · Training

29 CFR 1926.20 · Construction safety programs

29 CFR 1926.21 · Construction safety training

29 CFR 1926.404 · Ground-fault protection on job sites

29 CFR 1926.416 · Electrical safety in construction

29 CFR 1926.454 · Scaffold training

29 CFR 1926.501 · Fall protection in construction

29 CFR 1926.503 · Fall protection training in construction

Other all other specialty trade contractors employers in Indiana

Alert subscribers get notified of each newly cited employer in Indiana the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.