OSHA SearchOSHA records by employer

S3 Inc.: OSHA inspections and violations

Oklahoma City, Oklahoma · Ornamental and Architectural Metal Work Manufacturing · NAICS 332323

2inspections
16citation items
$8,000current penalties
May 18, 2022last inspection

Since 2020, OSHA inspectors have visited S3 Inc. in Oklahoma 2 times.

The most recent inspection opened on May 18, 2022 as a planned inspection, in Oklahoma City.

In all, OSHA issued 16 citation items: 11 serious and 5 other-than-serious.

The proposed penalties came to $18,506; today they stand at $8,000, 57% less.

The rule cited most here is 1910.134 (respiratory protection), 4 times.

Among manufacturing employers, the typical cited inspection since 2015 ends with a $3,600 penalty. S3 Inc. averages $8,000 across 1 cited inspection.

S3 Inc.: OSHA citation items per year, 2020 to 2022
Citation items per year, by inspection date.

Oklahoma · latest 90 days of OSHA records

52employers cited

Get notified the morning OSHA posts each new citation in Oklahoma: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Oklahoma

Checking a subcontractor, a client or your own company? Watch S3 Inc. and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 345967970 OPENED MAY 18, 2022Closed

Planned · Complete · Safety · 15 employees at the site · Closed Nov 21, 2022

8236 West Interstate 40 Service Road, Oklahoma City, OK 73128 · Ornamental and Architectural Metal Work Manufacturing · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 344678479 OPENED MAR 5, 2020Closed

Complaint · Partial · Health · 6 employees at the site · Closed May 17, 2022

8405 Mantle Avenue, Oklahoma City, OK 73132 · Ornamental and Architectural Metal Work Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1910.106(e)(2)(iv) · Flammable liquids
Other-than-serious$2,892$1,200Aug 24, 2020Final
Citation 1, item 1b
29 CFR 1910.106(e)(9)(iii) · Flammable liquids
Other-than-serious$0$0Aug 24, 2020Final
Citation 1, item 2a
29 CFR 1910.107(c)(2) · Spray painting and finishing
Serious$4,048$1,600Aug 24, 2020Final
Citation 1, item 2b
29 CFR 1910.107(e)(2) · Spray painting and finishing
Serious$0$0Aug 24, 2020Final
Citation 1, item 3a
29 CFR 1910.107(c)(5) · Spray painting and finishing
Serious$4,048$1,600Aug 24, 2020Final
Citation 1, item 3b
29 CFR 1910.303(b)(2) · Electrical equipment, general requirements
Serious$0$0Aug 24, 2020Final
Citation 1, item 3c
29 CFR 1910.305(b)(2)(i) · Electrical wiring methods
Serious$0$0Aug 24, 2020Final
Citation 1, item 4a
29 CFR 1910.132(a) · Personal protective equipment, general requirements
Other-than-serious$2,313$1,200Aug 24, 2020Final
Citation 1, item 4b
29 CFR 1910.132(d)(2) · Personal protective equipment, general requirements
Other-than-serious$0$0Aug 24, 2020Final
Citation 1, item 4c
29 CFR 1910.132(h)(6) · Personal protective equipment, general requirements
Other-than-serious$0$0Aug 24, 2020Final
Citation 1, item 5a
29 CFR 1910.134(c)(1) · Respiratory protection
Serious$2,313$1,200Aug 24, 2020Final
Citation 1, item 5b
29 CFR 1910.134(h)(2)(i) · Respiratory protection
Serious$0$0Aug 24, 2020Final
Citation 1, item 5c
29 CFR 1910.134(h)(4) · Respiratory protection
Serious$0$0Aug 24, 2020Final
Citation 1, item 5d
29 CFR 1910.134(k) · Respiratory protection
Serious$0$0Aug 24, 2020Final
Citation 1, item 6a
29 CFR 1910.253(b)(2)(iv) · Gas welding and cutting
Serious$2,892$1,200Aug 24, 2020Final
Citation 1, item 6b
29 CFR 1910.253(b)(4)(iii) · Gas welding and cutting
Serious$0$0Aug 24, 2020Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.106 · Flammable liquids

29 CFR 1910.106(e)(2)(iv)

(iv) Handling liquids at point of final use. (a) Category 1 or 2 flammable liquids, or Category 3 flammable liquids with a flashpoint below 100 °F (37.8 °C), shall be kept in covered containers when not actually in use.

29 CFR 1910.106(e)(9)(iii)

(iii) Waste and residue. Combustible waste material and residues in a building or unit operating area shall be kept to a minimum, stored in covered metal receptacles and disposed of daily.

29 CFR 1910.107 · Spray painting and finishing

29 CFR 1910.107(c)(2)

(2) Minimum separation. There shall be no open flame or spark producing equipment in any spraying area nor within 20 feet thereof, unless separated by a partition.

29 CFR 1910.132 · Personal protective equipment, general requirements

29 CFR 1910.134 · Respiratory protection

29 CFR 1910.253 · Gas welding and cutting

29 CFR 1910.303 · Electrical equipment, general requirements

29 CFR 1910.305 · Electrical wiring methods

Other ornamental and architectural metal work manufacturing employers in Oklahoma

Alert subscribers get notified of each newly cited employer in Oklahoma the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.