OSHA SearchOSHA records by employer

Samstubend Inc.: OSHA inspections and violations

Paterson, New Jersey · Fabricated Pipe and Pipe Fitting Manufacturing · NAICS 332996

2inspections
15citation items
$2,940current penalties
Mar 28, 2023last inspection

OSHA has inspected Samstubend Inc. 2 times in New Jersey since 2005.

The latest one began on Mar 28, 2023 as a planned inspection, in Paterson.

Those inspections ended with 15 citation items: 13 serious and 2 other-than-serious.

Penalties were first proposed at $4,200 and now stand at $2,940, 30% lower after settlements or reviews.

Lockout/tagout comes up most often in these citations: 3 items under 1910.147.

How that compares: the median penalty per cited inspection for manufacturing employers since 2015 is $3,600, and Samstubend Inc. averages $0 (1 cited inspection).

Samstubend Inc.: OSHA citation items per year, 2005 to 2023
Citation items per year, by inspection date.

New Jersey · latest 90 days of OSHA records

269employers cited

Get notified the morning OSHA posts each new citation in New Jersey: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in New Jersey

Checking a subcontractor, a client or your own company? Watch Samstubend Inc. and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 346593486 OPENED MAR 28, 2023Closed

Planned · Partial · Health · 6 employees at the site · Closed Apr 27, 2023

31 Maryland Avenue, Paterson, NJ 07503 · Fabricated Pipe and Pipe Fitting Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.132(e) · Personal protective equipment, general requirements
Other-than-serious$0$0Apr 10, 2023Final
Citation 1, item 2
29 CFR 1910.157(c)(1) · Portable fire extinguishers
Other-than-serious$0$0Apr 10, 2023Final

Inspection 308618636 OPENED DEC 22, 2005Closed

Planned · Complete · Health · 8 employees at the site · Closed May 6, 2008

31 Maryland Ave, Paterson, NJ 07503 · Fabricated Pipe and Pipe Fitting Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.110(e)(4)(iii) · Storage and handling of liquefied petroleum gases
Serious$450$315Feb 24, 2006Final
Citation 1, item 2a
29 CFR 1910.147(c)(1) · Lockout/tagout
Serious$600$420Feb 24, 2006Final
Citation 1, item 2b
29 CFR 1910.147(c)(5)(i) · Lockout/tagout
Serious$0$0Feb 24, 2006Final
Citation 1, item 2c
29 CFR 1910.147(c)(7)(i) · Lockout/tagout
Serious$0$0Feb 24, 2006Final
Citation 1, item 3
29 CFR 1910.178(l)(6) · Forklifts and other powered industrial trucks
Serious$450$315Feb 24, 2006Final
Citation 1, item 4
29 CFR 1910.178(q)(1) · Forklifts and other powered industrial trucks
Serious$450$315Feb 24, 2006Final
Citation 1, item 5a
29 CFR 1910.179(j)(2)(iii) · Overhead and gantry cranes
Serious$450$315Feb 24, 2006Final
Citation 1, item 5b
29 CFR 1910.179(j)(2)(iv) · Overhead and gantry cranes
Serious$0$0Feb 24, 2006Final
Citation 1, item 6
29 CFR 1910.212(a)(1) · Machine guarding
Serious$450$315Feb 24, 2006Final
Citation 1, item 7
29 CFR 1910.212(b) · Machine guarding
Serious$450$315Feb 24, 2006Final
Citation 1, item 8a
29 CFR 1910.215(a)(4) · Grinders and abrasive wheels
Serious$450$315Feb 24, 2006Final
Citation 1, item 8b
29 CFR 1910.215(b)(9) · Grinders and abrasive wheels
Serious$0$0Feb 24, 2006Final
Citation 1, item 9
29 CFR 1910.253(b)(4)(iii) · Gas welding and cutting
Serious$450$315Feb 24, 2006Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.110 · Storage and handling of liquefied petroleum gases

29 CFR 1910.110(e)(4)(iii)

(iii) Permanent and removable fuel containers shall be securely mounted to prevent jarring loose, slipping, or rotating, and the fastenings shall be designed and constructed to withstand static loading in any direction equal to twice the weight of the tank and attachments when filled with fuel using a safety factor of not less than four based on the ultimate strength of the material to be used. Field welding, when necessary, shall be made only on saddle plates, lugs or brackets, originally attached to the container by the tank manufacturer.

29 CFR 1910.132 · Personal protective equipment, general requirements

29 CFR 1910.132(e)

(e) Defective and damaged equipment. Defective or damaged personal protective equipment shall not be used.

29 CFR 1910.147 · Lockout/tagout

29 CFR 1910.147(c)(1)

(c) General—(1) Energy control program. The employer shall establish a program consisting of energy control procedures, employee training and periodic inspections to ensure that before any employee performs any servicing or maintenance on a machine or equipment where the unexpected energizing, start up or release of stored energy could occur and cause injury, the machine or equipment shall be isolated from the energy source, and rendered inoperative.

29 CFR 1910.157 · Portable fire extinguishers

29 CFR 1910.178 · Forklifts and other powered industrial trucks

29 CFR 1910.179 · Overhead and gantry cranes

29 CFR 1910.212 · Machine guarding

29 CFR 1910.215 · Grinders and abrasive wheels

29 CFR 1910.253 · Gas welding and cutting

Other fabricated pipe and pipe fitting manufacturing employers in New Jersey

Alert subscribers get notified of each newly cited employer in New Jersey the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.