OSHA SearchOSHA records by employer

Santana Torres: OSHA inspections and violations

Mission, Texas · Painting and Wall Covering Contractors · NAICS 238320

1inspections
3citation items
$5,116current penalties
Mar 6, 2019last inspection

OSHA inspectors have visited Santana Torres in Texas one time.

It opened on Mar 6, 2019 as a planned inspection, in Mission.

In all, OSHA issued 3 citation items: 3 serious.

The proposed penalties came to $8,526; today they stand at $5,116, 40% less.

The rule cited most here is 1926.451 (scaffolds, general requirements), 3 times.

Among construction employers, the typical cited inspection since 2015 ends with a $3,080 penalty. Santana Torres averages $5,116 across 1 cited inspection.

Santana Torres: OSHA citation items per year, 2019 to 2019
Citation items per year, by inspection date.

Texas · latest 90 days of OSHA records

394employers cited

Get notified the morning OSHA posts each new citation in Texas: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Texas

Checking a subcontractor, a client or your own company? Watch Santana Torres and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 343831541 OPENED MAR 6, 2019Closed

Planned · Partial · Safety · 4 employees at the site · Closed Apr 7, 2023

2203 Inspiration Rd, Mission, TX 78572 · Painting and Wall Covering Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.451(b)(1) · Scaffolds, general requirements
Serious$2,842$1,705Jun 12, 2019Final
Citation 1, item 2
29 CFR 1926.451(e)(1) · Scaffolds, general requirements
Serious$2,842$1,705Jun 12, 2019Final
Citation 1, item 3
29 CFR 1926.451(g)(1)(vii) · Scaffolds, general requirements
Serious$2,842$1,705Jun 12, 2019Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.451(b)(1)

(b) Scaffold platform construction. (1) Each platform on all working levels of scaffolds shall be fully planked or decked between the front uprights and the guardrail supports as follows:

29 CFR 1926.451(e)(1)

(1) When scaffold platforms are more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from another scaffold, structure, personnel hoist, or similar surface shall be used. Crossbraces shall not be used as a means of access.

29 CFR 1926.451(g)(1)(vii)

(vii) For all scaffolds not otherwise specified in paragraphs (g)(1)(i) through (g)(1)(vi) of this section, each employee shall be protected by the use of personal fall arrest systems or guardrail systems meeting the requirements of paragraph (g)(4) of this section.

Other painting and wall covering contractors employers in Texas

Alert subscribers get notified of each newly cited employer in Texas the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.