OSHA SearchOSHA records by employer

Scarborough Boatworks: OSHA inspections and violations

Wanchese, North Carolina · Boat Building · NAICS 336612

4inspections
26citation items
$12,275current penalties
Mar 21, 2018last inspection

OSHA has inspected Scarborough Boatworks 4 times in North Carolina since 2009.

The latest one began on Mar 21, 2018 on a referral, in Wanchese.

Those inspections ended with 26 citation items: 23 serious and 3 other-than-serious.

Penalties were first proposed at $27,078 and now stand at $12,275, 55% lower after settlements or reviews.

Electrical wiring methods comes up most often in these citations: 4 items under 1910.305.

How that compares: the median penalty per cited inspection for manufacturing employers since 2015 is $3,600, and Scarborough Boatworks averages $7,825 (1 cited inspection).

Scarborough Boatworks also files yearly injury logs with OSHA, summarized below.

Scarborough Boatworks: OSHA citation items per year, 2009 to 2018
Citation items per year, by inspection date.

North Carolina · latest 90 days of OSHA records

234employers cited

Get notified the morning OSHA posts each new citation in North Carolina: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in North Carolina

Checking a subcontractor, a client or your own company? Watch Scarborough Boatworks and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 343039806 OPENED MAR 21, 2018Closed

Referral · Partial · Safety · 37 employees at the site · Closed May 14, 2018

273 Thicket Lump Rd P.o. Box 367, Wanchese, NC 27981 · Boat Dealers · OSHA's record · Phone and website on Google Maps

Incident on Mar 14, 2018: Employee falls 6 feet and suffers head injuries

At 2:30 a.m. on March 14, 2018, Employee #1 was working from a modified unguarded deck platform. The employee was not trained on fall protection and had not been provided with personal fall protection equipment. The employee fell six feet, landed on the concrete floor, and sustained head injuries. He was hospitalized for treatment.

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1915.71(b)(7) · Scaffolds or staging
Serious$9,054$4,980Apr 20, 2018Final
Citation 1, item 1b
29 CFR 1915.71(j)(1) · Scaffolds or staging
Serious$0$0Apr 20, 2018Final
Citation 1, item 2a
29 CFR 1926.452(w)(6)(v) · Rules for each type of scaffold
Serious$5,174$2,845Apr 20, 2018Final
Citation 1, item 2b
29 CFR 1926.452(w)(7) · Rules for each type of scaffold
Serious$0$0Apr 20, 2018Final

Inspection 339856940 OPENED JUL 17, 2014Closed

Planned · Complete · Safety · 26 employees at the site · Closed Sep 18, 2014

273 Thicket Lump Rd P.o. Box 367, Wanchese, NC 27981 · Boat Dealers · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.151(c) · First aid and eyewash
Serious$2,800$1,400Aug 14, 2014Final
Citation 1, item 2
29 CFR 1910.305(b)(1)(ii) · Electrical wiring methods
Serious$2,100$1,050Aug 14, 2014Final

Inspection 311093835 OPENED JUN 11, 2009Closed

Planned · Complete · Health · 12 employees at the site · Closed Jan 12, 2010

473 The Lane, Wanchese, NC 27981 · Boat Building · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a Serious$450$100Jul 15, 2009Final
Citation 1, item 1b Serious$0$0Jul 15, 2009Final
Citation 1, item 2
29 CFR 1910.107(e)(9) · Spray painting and finishing
Serious$750$300Jul 15, 2009Final
Citation 1, item 3a
29 CFR 1910.134(e)(1) · Respiratory protection
Serious$600$200Jul 15, 2009Final
Citation 1, item 3b
29 CFR 1910.134(f)(1) · Respiratory protection
Serious$0$0Jul 15, 2009Final
Citation 1, item 3c
29 CFR 1910.134(k)(1) · Respiratory protection
Serious$0$0Jul 15, 2009Final
Citation 1, item 4
29 CFR 1910.151(c) · First aid and eyewash
Serious$600$200Jul 15, 2009Final
Citation 1, item 5
29 CFR 1910.1200(h) · Hazard communication
Serious$450$200Jul 15, 2009Final
Citation 2, item 1
29 CFR 1910.134(k)(6) · Respiratory protection
Other-than-serious$0$0Jul 15, 2009Final
Citation 2, item 2
29 CFR 1915.152(b) · Personal Protective Equipment (PPE): general requirements
Other-than-serious$0$0Jul 15, 2009Final

Inspection 311093876 OPENED JUN 11, 2009Closed

Planned · Complete · Safety · 12 employees at the site · Closed Jan 19, 2010

473 The Lane, Wanchese, NC 27981 · Boat Building · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.212(b) · Machine guarding
Serious$600$125Jul 15, 2009Final
Citation 1, item 2
29 CFR 1910.213(d)(1) · Woodworking machinery
Serious$750$125Jul 15, 2009Final
Citation 1, item 3
29 CFR 1910.213(h)(4) · Woodworking machinery
Serious$750$125Jul 15, 2009Final
Citation 1, item 4a
29 CFR 1910.215(a)(4) · Grinders and abrasive wheels
Serious$600$125Jul 15, 2009Final
Citation 1, item 4b
29 CFR 1910.215(b)(9) · Grinders and abrasive wheels
Serious$0$0Jul 15, 2009Final
Citation 1, item 5
29 CFR 1910.304(g)(5) · Grounding and circuit protection
Serious$600$125Jul 15, 2009Final
Citation 1, item 6
29 CFR 1910.305(g)(2)(ii) · Electrical wiring methods
Serious$600$125Jul 15, 2009Final
Citation 1, item 7
29 CFR 1910.305(g)(2)(iii) · Electrical wiring methods
Serious$600$125Jul 15, 2009Final
Citation 1, item 8
29 CFR 1910.305(a)(2)(x) · Electrical wiring methods
Serious$600$125Jul 15, 2009Final
Citation 2, item 1
29 CFR 1910.303(f) · Electrical equipment, general requirements
Other-than-serious$0$0Jul 15, 2009Final

Injury and illness logs

From the Form 300A summaries employers file with OSHA each year. Rate = recordable cases per 100 full-time workers.

In 2022, the Wanchese site logged 0 recordable injuries or illnesses among about 35 workers: 0.0 per 100 full-time workers, against a median of 3.8 for its industry.

Site and yearWorkersCasesDays-away casesRateIndustry median
Scarborough Boatworks
Wanchese · 2022
35 000.03.8

Included with any plan: 4 more yearly logs from these sites, back to 2017, with each site's average rate over its latest three years. Already a subscriber? Sign in.

See plans

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.107 · Spray painting and finishing

29 CFR 1910.107(e)(9)

(9) Grounding. Whenever flammable liquids or liquids with a flashpoint greater than 199.4 °F (93 °C) are transferred from one container to another, both containers shall be effectively bonded and grounded to prevent discharge sparks of static electricity.

29 CFR 1910.1200 · Hazard communication

29 CFR 1910.1200(h)

(h) Post-mortem data: Increased incidence and/or severity of post-mortem findings may be indicative of maternal toxicity. This can include gross or microscopic pathological findings or organ weight data, including absolute organ weight, organ-to-body weight ratio, or organ-to-brain weight ratio. When supported by findings of adverse histopathological effects in the affected organ(s), the observation of a significant change in the average weight of suspected target organ(s) of treated dams (mothers), compared to those in the control group, may be considered evidence of maternal toxicity.

29 CFR 1910.134 · Respiratory protection

29 CFR 1910.134(e)(1)

(1) General. The employer shall provide a medical evaluation to determine the employee's ability to use a respirator, before the employee is fit tested or required to use the respirator in the workplace. The employer may discontinue an employee's medical evaluations when the employee is no longer required to use a respirator.

29 CFR 1910.151 · First aid and eyewash

29 CFR 1910.212 · Machine guarding

29 CFR 1910.213 · Woodworking machinery

29 CFR 1910.215 · Grinders and abrasive wheels

29 CFR 1910.303 · Electrical equipment, general requirements

29 CFR 1910.304 · Grounding and circuit protection

29 CFR 1910.305 · Electrical wiring methods

29 CFR 1910.94 · Ventilation

29 CFR 1915.152 · Personal Protective Equipment (PPE): general requirements

29 CFR 1915.71 · Scaffolds or staging

29 CFR 1926.452 · Rules for each type of scaffold

Other boat building employers in North Carolina

Alert subscribers get notified of each newly cited employer in North Carolina the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.