OSHA SearchOSHA records by employer

Smith Masonry, LLC: OSHA inspections and violations

Pascagoula, Mississippi · Masonry Contractors · NAICS 238140

11inspections
37citation items
$42,198current penalties
Oct 17, 2019last inspection

OSHA has inspected Smith Masonry, LLC 11 times in Mississippi since 1991.

The latest one began on Oct 17, 2019 as a planned inspection, in Poplarville.

Those inspections ended with 37 citation items: 23 serious, 4 repeat and 10 other-than-serious.

Penalties were first proposed at $54,138 and now stand at $42,198, 22% lower after settlements or reviews.

Scaffolds, general requirements comes up most often in these citations: 22 items under 1926.451.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and Smith Masonry, LLC averages $3,480 (2 cited inspections).

Smith Masonry, LLC: OSHA citation items per year, 1991 to 2019
Citation items per year, by inspection date.

Want to know if OSHA cites Smith Masonry, LLC again? Add it to a watchlist and we will email you the morning the citation shows up.

Watch this company

Inspection history

Inspection 344385117 OPENED OCT 17, 2019Closed

Planned · Partial · Safety · 42 employees at the site · Closed Jan 7, 2020

101 Highway 11, Poplarville, MS 39470 · Masonry Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.602(d) · Earthmovers and forklifts in construction
Other-than-serious$0$0Nov 5, 2019Final

Inspection 341359750 OPENED MAR 28, 2016Closed

Planned · Partial · Safety · 10 employees at the site · Closed May 10, 2017

West Of I55 On Hwy 28, Hazlehurst, MS 39083 · Masonry Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.451(a)(1) · Scaffolds, general requirements
Serious$2,200$1,630May 24, 2016Final
Citation 1, item 2
29 CFR 1926.451(c)(2) · Scaffolds, general requirements
Serious$2,200$1,630May 24, 2016Final
Citation 1, item 3
29 CFR 1926.454(b) · Scaffold training
Serious$2,200$1,630May 24, 2016Final
Citation 2, item 1
29 CFR 1926.452(c)(2) · Rules for each type of scaffold
Serious$4,400$1,630May 24, 2016Final
Citation 3, item 1
29 CFR 1926.451(f)(3) · Scaffolds, general requirements
Other-than-serious$440$440May 24, 2016Final

Inspection 335983987 OPENED AUG 20, 2012Closed

Planned · Complete · Safety · 35 employees at the site · Closed Aug 15, 2013

Pearl River Community College Brown Stone Center For The Performing Arts, Poplarville, MS 39470 · Masonry Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.451(b)(1) · Scaffolds, general requirements
Repeat$5,600$5,600Sep 24, 2012Final
Citation 1, item 2
29 CFR 1926.451(g)(1) · Scaffolds, general requirements
Repeat$7,000$7,000Sep 24, 2012Final
Citation 1, item 3
29 CFR 1926.451(e)(1) · Scaffolds, general requirements
Repeat$7,000$7,000Sep 24, 2012Final
Citation 2, item 1
29 CFR 1926.28(a) · Personal protective equipment
Other-than-serious$0$0Sep 24, 2012Final

Inspection 315307405 OPENED FEB 17, 2012Closed

Planned · Partial · Safety · 5 employees at the site · Closed Mar 16, 2012

Us Hwy 49, Collins, MS 39428 · Masonry Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.451(b)(1) · Scaffolds, general requirements
Serious$2,040$1,224Mar 7, 2012Closed
Citation 1, item 2
29 CFR 1926.451(e)(1) · Scaffolds, general requirements
Serious$1,530$918Mar 7, 2012Closed
Citation 1, item 3
29 CFR 1926.451(g)(1) · Scaffolds, general requirements
Serious$2,040$1,224Mar 7, 2012Closed
Citation 1, item 4
29 CFR 1926.452(c)(2) · Rules for each type of scaffold
Serious$2,040$1,224Mar 7, 2012Closed

Inspection 313627549 OPENED OCT 29, 2009Closed

Planned · Partial · Safety · 9 employees at the site · Closed Nov 20, 2009

55 Arena Drive, Hattiesburg, MS 39401 · Masonry Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.451(c)(2) · Scaffolds, general requirements
Serious$1,000$1,000Nov 10, 2009Closed
Citation 2, item 1
29 CFR 1926.501(b)(4)(ii) · Fall protection in construction
Other-than-serious$0$0Nov 10, 2009Closed

Inspection 306653916 OPENED MAR 12, 2004Closed

Planned · Complete · Safety · 10 employees at the site · Closed May 6, 2004

100 Methodist Hospital Blvd., Hattiesburg, MS 39402 · Masonry Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
OSH Act Section 5(a)(1) · General Duty Clause
Serious$675$675Mar 23, 2004Closed

Inspection 306650011 OPENED MAY 30, 2003Closed

Planned · Partial · Safety · 10 employees at the site · Closed Jul 16, 2003

Regional Schools Complex, Camp Shelby, MS 39401 · Masonry Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.403(b)(1) · Electrical equipment on job sites
Serious$573$573Jul 8, 2003Closed

Inspection 304316268 OPENED NOV 13, 2002Closed

Planned · Complete · Safety · 10 employees at the site · Closed Mar 28, 2003

Regional Schools Complex, Camp Shelby, MS 39401 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.451(b)(1) · Scaffolds, general requirements
Serious$1,400$900Dec 3, 2002Closed
Citation 1, item 1b
29 CFR 1926.451(b)(2) · Scaffolds, general requirements
Serious$0$0Dec 3, 2002Closed
Citation 1, item 2a
29 CFR 1926.451(c)(2) · Scaffolds, general requirements
Serious$1,400$900Dec 3, 2002Closed
Citation 1, item 2b
29 CFR 1926.451(c)(2)(i) · Scaffolds, general requirements
Serious$0$0Dec 3, 2002Closed
Citation 1, item 3a
29 CFR 1926.451(c)(3) · Scaffolds, general requirements
Serious$1,400$900Dec 3, 2002Closed
Citation 1, item 3b
29 CFR 1926.452(c)(2) · Rules for each type of scaffold
Serious$0$0Dec 3, 2002Closed
Citation 1, item 4
29 CFR 1926.451(g)(1)(vi) · Scaffolds, general requirements
Serious$2,000$1,300Dec 3, 2002Closed
Citation 2, item 1
29 CFR 1926.451(f)(4) · Scaffolds, general requirements
Repeat$2,800$2,000Dec 3, 2002Closed
3 older inspections

Inspection 304313489 OPENED MAR 22, 2002Closed

Planned · Partial · Safety · 12 employees at the site · Closed Apr 15, 2002

1021 Popps Ferry Road, Biloxi, MS 39530 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.451(b)(7) · Scaffolds, general requirements
Serious$450$300Apr 1, 2002Closed
Citation 1, item 2
29 CFR 1926.451(c)(2) · Scaffolds, general requirements
Serious$600$400Apr 1, 2002Closed
Citation 1, item 3
29 CFR 1926.451(c)(2)(i) · Scaffolds, general requirements
Serious$1,050$700Apr 1, 2002Closed
Citation 1, item 4
29 CFR 1926.451(c)(2)(ii) · Scaffolds, general requirements
Serious$1,050$700Apr 1, 2002Closed
Citation 1, item 5
29 CFR 1926.451(f)(4) · Scaffolds, general requirements
Serious$1,050$700Apr 1, 2002Closed

Inspection 18303677 OPENED MAY 16, 1991Closed

Follow-up · No inspection · Safety · Closed May 21, 1991

Wal-mart, Denny Ave., (u.s. 90 E.), Pascagoula, MS 39567 · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 18303297 OPENED APR 3, 1991Closed

Planned · Complete · Safety · 12 employees at the site · Closed May 21, 1991

Wal-mart, Denny Ave., (u.s. 90 E.), Pascagoula, MS 39567 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.59(e)(1) · Hazard communication
Other-than-serious$0$0Apr 15, 1991Closed
Citation 1, item 2
29 CFR 1926.59(f)(5)(i) · Hazard communication
Other-than-serious$0$0Apr 15, 1991Closed
Citation 1, item 3
29 CFR 1926.59(f)(5)(ii) · Hazard communication
Other-than-serious$0$0Apr 15, 1991Closed
Citation 1, item 4
29 CFR 1926.59(g)(1) · Hazard communication
Other-than-serious$0$0Apr 15, 1991Closed
Citation 1, item 5
29 CFR 1926.59(h) · Hazard communication
Other-than-serious$0$0Apr 15, 1991Closed
Citation 1, item 6
29 CFR 1926.405(g)(2)(iv) · Job-site wiring
Other-than-serious$0$0Apr 15, 1991Closed

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.28 · Personal protective equipment

29 CFR 1926.28(a)

(a) The employer is responsible for requiring the wearing of appropriate personal protective equipment in all operations where there is an exposure to hazardous conditions or where this part indicates the need for using such equipment to reduce the hazards to the employees.

29 CFR 1926.403 · Electrical equipment on job sites

29 CFR 1926.403(b)(1)

(b) Examination, installation, and use of equipment—(1) Examination. The employer shall ensure that electrical equipment is free from recognized hazards that are likely to cause death or serious physical harm to employees. Safety of equipment shall be determined on the basis of the following considerations:

29 CFR 1926.405 · Job-site wiring

29 CFR 1926.405(g)(2)(iv)

(iv) Strain relief. Flexible cords shall be connected to devices and fittings so that strain relief is provided which will prevent pull from being directly transmitted to joints or terminal screws.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.452 · Rules for each type of scaffold

29 CFR 1926.454 · Scaffold training

29 CFR 1926.501 · Fall protection in construction

29 CFR 1926.59 · Hazard communication

29 CFR 1926.602 · Earthmovers and forklifts in construction

OSH Act Section 5 · General Duty Clause

Other masonry contractors employers in Mississippi

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.