Inspection 346706146 OPENED MAY 16, 2023Closed
12131 Western Avenue, Garden Grove, CA 92841 · Engineering Services · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
San Lorenzo, California · Plumbing, Heating, and Air-Conditioning Contractors · NAICS 238220
Since 1988, OSHA inspectors have visited Southland Industries in California 32 times.
The most recent inspection opened on May 16, 2023 after an accident, in Garden Grove.
In all, OSHA issued 17 citation items: 6 serious and 11 other-than-serious.
The proposed penalties came to $134,785; today they stand at $63,420, 53% less.
Among construction employers, the typical cited inspection since 2015 ends with a $3,080 penalty. Southland Industries averages $18,617 across 3 cited inspections.
Southland Industries also files yearly injury logs with OSHA, summarized below.
California · latest 90 days of OSHA records
1,139employers cited
18 of them in the same industry
Get notified the morning OSHA posts each new citation in California: the employer, the site address, the rules broken and the penalty.
See who gets cited nextLatest cited in California
Checking a subcontractor, a client or your own company? Watch Southland Industries and get notified the morning OSHA posts a new citation for it.
Watch this company12131 Western Avenue, Garden Grove, CA 92841 · Engineering Services · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
33225 Western Avenue, Union City, CA 94587 · Plumbing, Heating, and Air-Conditioning Contractors · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
777 San Manuel Blvd., Highland, CA 92346 · Plumbing, Heating, and Air-Conditioning Contractors · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
5 Great Oaks Blvd., San Jose, CA 95123 · Plumbing, Heating, and Air-Conditioning Contractors · OSHA's record · Phone and website on Google Maps
Incident on Nov 3, 2020: Employee injures head and body when struck and pinned by fal
At 7:00 a.m. on November 3, 2020, Employee #1, a fitter employed by a plumbing and mechanical contractor, was working at a new two-story steel and precast data center. The employee was in a scissor lift, assisting with the installation of a 12-inch chilled water carbon steel pipe in the ceiling area. The pipe was being hoisted using two chain falls attached to rigging secured on steel tubing placed on an I-beam flange. During the operation, the rigging slipped off one side of the I-beam flange, causing the pipe to fall onto the concrete floor. The rigging on the opposite side then failed, and the pipe fell onto the scissor lift, striking and pinning the employee. Emergency services transported the employee to a local hospital, where he was admitted and treated for multiple injuries to his head and body.
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1509(A) |
Other-than-serious | $18,000 | $5,000 | Jun 14, 2021 | Final |
| Citation 2, item 1 29 CFR 3328(A) |
Other-than-serious | $9,000 | $1,500 | Jun 14, 2021 | Final |
| Citation 3, item 1 29 CFR 4999(A) |
Other-than-serious | $9,000 | $1,500 | Jun 14, 2021 | Final |
| Citation 4, item 1 29 CFR 5042(A)(9) |
Serious | $18,000 | $18,000 | Jun 14, 2021 | Final |
13155 Burbank Blvd, Sherman Oaks, CA 91401 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
2820 Northwestern Parkway, Santa Clara, CA 95051 · Plumbing, Heating, and Air-Conditioning Contractors · OSHA's record · Phone and website on Google Maps
Incident on May 24, 2018: Employee is injured while avoiding falling duct
At 11:30 a.m. on May 24, 2018, Employee #1 and two apprentice coworkers, employed by a construction company, were installing ductwork at a four-story commercial building. They were using two manual lifting devices to raise a 350-pound HVAC duct. They were unable to effectively secure the duct to the lifting forks. The duct began to fall from the forks, and Employee #1 fell at grade while trying to avoid being struck by the duct. He avoided the duct but fell on a tool he was carrying in his coveralls. Employee #1 was transported to the hospital, admitted, and treated for a fractured femur at the hip joint.
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 3328(A)(2) |
Other-than-serious | $18,000 | $600 | Nov 21, 2018 | Final |
33225 Western Avenue, Union City, CA 94587 · Plumbing, Heating, and Air-Conditioning Contractors · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
33225 Western Avenue, Union City, CA 94587 · Plumbing, Heating, and Air-Conditioning Contractors · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 3203(A) |
Serious | $11,250 | $11,250 | Jun 8, 2016 | Final |
| Citation 2, item 1 29 CFR 4050(A) |
Serious | $25,000 | $18,000 | Jun 8, 2016 | Final |
505 Parnasus Avenue, Hsir-hse-8, San Francisco, CA 94143 · Engineering Services · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
1475 Grandview Dr., South San Francisco, CA 94080 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
555 Reed Street, Santa Clara, CA 95050 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps
Incident on Jan 29, 2014: Foreman falls, fractures hip while installing pipe
On January 29, 2014, Employee #1, a crew foreman, and Coworkers #1, #2, and #3, all pipefitters employed by Southland Industries, were installing two 6-inch dia meter pipes inside a commercial building. These were black iron steel L pipes me asuring 16 feet long by 3 to 4 feet from the elbow and weighing approximately 45 0 pounds each. The pipes were being installed with the long end vertical against the East wall of the building's interior, located on the East-line Corridor 2, and the short end passing through an opening in the wall and onto the other side . This task proved to be difficult and time consuming, because the holes in the wall were the exact dimension of the pipe diameter. Coworker #1 operated a Grada ll, using its jib and sling to lift the pipe. Coworker #2, working from the bask et of a knuckle boom (articulated boom) lift, was aligning the top of the pipe. Employee #1, who was in charge of this operation, was at the bottom of the pipe and guiding/aligning it to the flange. It took approximately 2 hours to install the first pipe on the right side. After 1.5 hours attempting to install the seco nd pipe on the left side, Employee #1 asked Coworker #3, who was passing by, to help with the installation. Now there were four workers trying to install this 4 50-pound pipe: Coworker #1 operated the Gradall to lift the pipe. Coworker #1, w orking from the basket of the lift, positioned/aligned the top part of the pipe. Coworker #3, who had come over to help, was at the bottom of the pipe, guiding and aligning it to the connection. Employee #1, the foreman, stood next to Cowor ker #3 and directed the operation. Coworker #3 and Employee #1 were standing on a concrete slab that measured 31 inches wide by approximately 20 feet long and r ose 3 feet 6 inches above the ground. The two pipes were in the middle of this s lab platform. Both Employee #1 and Coworker #3 were on the left side of the slab . Twenty minutes after Coworker #3 had begun to help with the installation, Empl oyee #1 missed his step and fell from the concrete slab down to a wooden plank m easuring 22 inches wide by 10 feet long, a fall height of approximately 3 feet 6 inches. This wooden plank acted as a bridge to connect the flooring over a tren ch measuring 6 feet wide. Employee #1 landed on his right foot, but the momentum of the fall caused him to lose balance and fall from the plank down to the tren ch below, an additional fall height of approximately 1 foot. There were pipes la id down horizontally on the trench floor. Employee #1 landed left hip first and struck these pipes. Emergency services were called, and Employee #1 was transpor ted to the hospital, where he was admitted and treated for a fractured hip. The employer reported this event to Cal/OSHA within the required timeframe. The subs equent investigation found no employer violation related to Employee #1's fall.
No citations from this inspection.
301 Industrial Road, San Carlos, CA 94070 · Plumbing, Heating, and Air-Conditioning Contractors · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
331 Oyster Point Blvd., South San Francisco, CA 94080 · Plumbing, Heating, and Air-Conditioning Contractors · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
13003 Ritz Carlton Highland Dr, Truckee, CA 96161 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps
Incident on Dec 27, 2007: Employee's hand crushed by falling chiller unit
On December 27, 2007, Employee #1 and two coworkers were lowering a 15,000 lb ch iller that was supported by 6 by 6 wooden blocks onto a concrete pad. Their inte nded process was to (1) lower one corner approximately 1-1/2 in. before moving t o the next corner; (2) repeat the process for all four of the corners; (3) retur n to the first corner and lower it an additional 1-1/2 in.; (4) continue with ea ch corner in succession until all four corners were resting on the concrete pad. To accomplish the task, they used a 10-ton hydraulic jack to raise one corner h igh enough to manually replace the 6 by 6 block with a 4 by 4 block, whihc was a ctually closer to 1-1/2 in. smaller. When all four blocks were replaced, smaller blocks were to be used as replacements in successive cycles around the four cor ners until the chiller was resting on the pad. On the second corner of the first cycle of block replacements, Employee #1 was operating the hydraulic jack alone , while the two coworkers were nearby cleaning up around the chiller. Employee # 1 raised the chiller sufficiently to allow removal of the wooden block when he n oticed there was small debris on the concrete in the area where the chiller woul d eventually rest. He decided to scrape it away, but instead of leaving the wood en block in place, he used it to remove the debris. He was holding the block by its sides and top with his right hand while he swept away the debris. His finger s were on top of the block when the jack suddenly collapsed and the chiller drop ped on his right index and middle fingers, crushing them. The two coworkers came to his rescue and jacked up the chiller to allow Employee #1 to remove his hand . Neither of the coworkers witnessed the actual accident. Both later stated that they thought Employee #1 had inadvertently released the relief valve on the jac k, causing it to drop the load. The coworker who jacked up the chiller to free E mployee #1's hand later stated that he had to tighten the relief valve before th e pump would raise the jack.
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 3562 E |
Other-than-serious | $18,000 | $1,000 | Feb 21, 2008 | Final |
2000 Manhattan Ave., East Palo Alto, CA 94303 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
17941 Fitch, Irvine, CA 92614 · Roofing Contractors · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1926.501(b)(10) · Fall protection in construction |
Serious | $825 | $825 | Jul 23, 2004 | Closed |
501 Chesapeake Drive, Redwood City, CA 94061 · Other Heavy and Civil Engineering Construction · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
650 E. Tahquitz Canyon Way, Palm Springs, CA 92262 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
300 Enzo Drive, San Jose, CA 95111 · Water and Sewer Line and Related Structures Construction · OSHA's record · Phone and website on Google Maps
Incident on Dec 20, 2002: Employee fractures elbow after falling off ladder
On December 20, 2002, Employee #1, a sheet metal worker, fractured his elbow whe n he fell from laddar.
No citations from this inspection.
Chumash Casoino Project, Santa Ynez, CA 93400 · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
4550 Towne Center Ct, San Diego, CA 92121 · OSHA's record · Phone and website on Google Maps
Incident on Jun 16, 1999: Employee's finger amputated while unloading pipe
Employee #1 was unloading pipe when her finger was amputated. (Note: No abstract data was provided.)
No citations from this inspection.
300 Enzo Drive, San Jose, CA 95111 · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
Hwy 101 And Lindaro Cyn Rd, Westlake Village, CA 91362 · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
2411 Baumann Ave, San Lorenzo, CA 94580 · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
2411 Baumann Ave, San Lorenzo, CA 94580 · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
2411 Baumann Ave, San Lorenzo, CA 94580 · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
2411 Baumann Ave, San Lorenzo, CA 94580 · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
1661 E 32nd St, Long Beach, CA 90807 · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 3220 B |
Other-than-serious | $280 | $0 | Nov 22, 1996 | Final |
| Citation 1, item 2 29 CFR 3328 A |
Other-than-serious | $465 | $0 | Nov 22, 1996 | Final |
| Citation 2, item 1 | Serious | $1,405 | $185 | Nov 22, 1996 | Final |
| Citation 3, item 1 29 CFR 4002 A |
Serious | $5,000 | $5,000 | Nov 22, 1996 | Final |
1017 N. Las Palmas, Los Angeles, CA 90038 · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 14301 B |
Other-than-serious | $375 | $375 | Apr 27, 1994 | Closed |
| Citation 1, item 2 29 CFR 1509 A |
Other-than-serious | $185 | $185 | Apr 27, 1994 | Closed |
251 E Olive St, Los Angeles, CA 90013 · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 | Other-than-serious | $0 | $0 | Jun 14, 1991 | Closed |
9301 Tampa Avenue, Northridge, CA 91324 · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
14635 Baldwin Park Town Center, Baldwin Park, CA 91706 · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1903.2(a)(1) · Posting of notice; availability of the Act, regulations and applicable standards |
Other-than-serious | $0 | $0 | Nov 15, 1988 | Closed |
From the Form 300A summaries employers file with OSHA each year. Rate = recordable cases per 100 full-time workers.
In 2024, the Garden Grove site logged 51 recordable injuries or illnesses among about 6,761 workers: 0.7 per 100 full-time workers, against a median of 1.8 for its industry. Those cases cost 594 days away from work.
| Site and year | Workers | Cases | Days-away cases | Rate | Industry median |
|---|---|---|---|---|---|
| Southland Industries Garden Grove · 2024 | 6,761 | 51 | 8 | 0.7 | 1.8 |
| Southland NorCal Office Union City · 2023 | 265 | 1 | 1 | 0.4 | 1.8 |
| Southland Energy San Diego · 2023 | 76 | 0 | 0 | 0.0 | 1.8 |
| Southland Industries Garden Grove Garden Grove · 2022 | 130 | 1 | 1 | 0.7 | 1.8 |
| Southland NorCal Vantage CA23 Santa Clara · 2022 | 23 | 0 | 0 | 0.0 | 1.8 |
| Pamf San Jose · 2022 | 16 | 0 | 0 | 0.0 | 1.8 |
| Gateway San Francisco · 2022 | 15 | 0 | 0 | 0.0 | 1.8 |
| Westside Pavillion Los Angeles · 2022 | 9 | 0 | 0 | 0.0 | 1.8 |
Included with any plan: 22 more yearly logs from these sites, back to 2019, with each site's average rate over its latest three years. Already a subscriber? Sign in.
See plansCurrent text from the Code of Federal Regulations. Some citations were issued under older wording.
29 CFR 1903.2(a)(1)
(a)(1) Each employer shall post and keep posted a notice or notices, to be furnished by the Occupational Safety and Health Administration, U.S. Department of Labor, informing employees of the protections and obligations provided for in the Act, and that for assistance and information, including copies of the Act and of specific safety and health standards, employees should contact the employer or the nearest office of the Department of Labor. Such notice or notices shall be posted by the employer in each establishment in a conspicuous place or places where notices to employees are customarily posted. Each employer shall take steps to insure that such notices are not altered, defaced, or covered by other material.
29 CFR 1926.501(b)(10)
(10) Roofing work on Low-slope roofs. Except as otherwise provided in paragraph (b) of this section, each employee engaged in roofing activities on low-slope roofs, with unprotected sides and edges 6 feet (1.8 m) or more above lower levels shall be protected from falling by guardrail systems, safety net systems, personal fall arrest systems, or a combination of warning line system and guardrail system, warning line system and safety net system, or warning line system and personal fall arrest system, or warning line system and safety monitoring system. Or, on roofs 50-feet (15.25 m) or less in width (see appendix A to subpart M of this part), the use of a safety monitoring system alone [i.e. without the warning line system] is permitted.
Alert subscribers get notified of each newly cited employer in California the morning it is posted. See the alert plans.
Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.