Inspection 348147596 OPENED MAR 31, 2025Closed
Town Of Greenwich Wpca 99 Holly Hill Lane (accident Site), Greenwich, CT 06830 · Sewage Treatment Facilities · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
Greenwich, Connecticut · Landscaping Services · NAICS 561730
Since 2022, OSHA inspectors have visited Town of Greenwich in Connecticut 32 times.
The most recent inspection opened on Mar 31, 2025 on a referral, in Greenwich.
In all, OSHA issued 179 citation items: 152 serious and 27 other-than-serious.
The proposed penalties came to $26,430; today they stand at $13,310, 50% less.
The rule cited most here is 1910.305 (electrical wiring methods), 19 times.
Among staffing, cleaning and waste services employers, the typical cited inspection since 2015 ends with a $2,235 penalty. Town of Greenwich averages $475 across 28 cited inspections.
Town of Greenwich also files yearly injury logs with OSHA, summarized below.
Connecticut · latest 90 days of OSHA records
83employers cited
2 of them in the same industry
Get notified the morning OSHA posts each new citation in Connecticut: the employer, the site address, the rules broken and the penalty.
See who gets cited nextLatest cited in Connecticut
Checking a subcontractor, a client or your own company? Watch Town of Greenwich and get notified the morning OSHA posts a new citation for it.
Watch this companyTown Of Greenwich Wpca 99 Holly Hill Lane (accident Site), Greenwich, CT 06830 · Sewage Treatment Facilities · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
Greenwich Highway Department, 100 Indian Field Road Road Job At 471 Field Point Road, Greenwich, CT 06830 · Highway, Street, and Bridge Construction · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
Town Of Greenwich Dorothy Hamill Skating Rink 1 Sue Metz Way, Greenwich, CT 06830 · Fitness and Recreational Sports Centers · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1a 29 CFR 1910.305(e)(1) · Electrical wiring methods |
Serious | $350 | $350 | Mar 2, 2023 | Final |
| Citation 1, item 1b 29 CFR 1910.305(e)(2) · Electrical wiring methods |
Serious | $0 | $0 | Mar 2, 2023 | Final |
Police Department Firing Range 451 Steamboat Road, Greenwich, CT 06830 · Police Protection · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1910.1025(h)(2)(ii) · Lead in general industry |
Serious | $350 | $175 | Feb 21, 2023 | Final |
| Citation 1, item 2a 29 CFR 1910.1200(e)(1)(i) · Hazard communication |
Serious | $350 | $175 | Feb 21, 2023 | Final |
| Citation 1, item 2b 29 CFR 1910.1200(f)(6)(ii) · Hazard communication |
Serious | $0 | $0 | Feb 21, 2023 | Final |
| Citation 1, item 2c 29 CFR 1910.1200(g)(8) · Hazard communication |
Serious | $0 | $0 | Feb 21, 2023 | Final |
| Citation 1, item 2d 29 CFR 1910.1200(h)(1) · Hazard communication |
Serious | $0 | $0 | Feb 21, 2023 | Final |
Department Of Public Works (highway Department) Waterfall Lane At Valley Road, Cos Cob, CT 06807 · Highway, Street, and Bridge Construction · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 31-370(A) |
Serious | $640 | $320 | Jan 10, 2023 | Final |
Dpw Highway Department Leaf Collection Site Work Manor Road, Old Greenwich, CT 06870 · Landscaping Services · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1a 29 CFR 1910.95(b)(1) · Noise |
Serious | $490 | $245 | Feb 2, 2023 | Final |
| Citation 1, item 1b 29 CFR 1910.95(c)(1) · Noise |
Serious | $0 | $0 | Feb 2, 2023 | Final |
| Citation 1, item 1c 29 CFR 1910.95(g)(1) · Noise |
Serious | $0 | $0 | Feb 2, 2023 | Final |
| Citation 1, item 1d 29 CFR 1910.95(l)(1) · Noise |
Serious | $0 | $0 | Feb 2, 2023 | Final |
Fire Department Headquarters 15 Havemeyer Place, Greenwich, CT 06830 · Fire Protection · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1a 29 CFR 1910.157(c)(1) · Portable fire extinguishers |
Serious | $350 | $175 | Jan 10, 2023 | Final |
| Citation 1, item 1b 29 CFR 1910.157(e)(2) · Portable fire extinguishers |
Serious | $0 | $0 | Jan 10, 2023 | Final |
| Citation 1, item 2a 29 CFR 1910.165(d)(1) · Employee alarm systems |
Serious | $350 | $175 | Jan 10, 2023 | Final |
| Citation 1, item 2b 29 CFR 1910.165(e) · Employee alarm systems |
Serious | $0 | $0 | Jan 10, 2023 | Final |
| Citation 1, item 3a 29 CFR 1910.212(a)(1) · Machine guarding |
Serious | $350 | $175 | Jan 10, 2023 | Final |
| Citation 1, item 3b 29 CFR 1910.215(a)(4) · Grinders and abrasive wheels |
Serious | $0 | $0 | Jan 10, 2023 | Final |
| Citation 1, item 3c 29 CFR 1910.215(b)(9) · Grinders and abrasive wheels |
Serious | $0 | $0 | Jan 10, 2023 | Final |
| Citation 1, item 4 29 CFR 1910.242(b) · Hand and power tools |
Serious | $280 | $140 | Jan 10, 2023 | Final |
| Citation 1, item 5a 29 CFR 1910.303(b)(2) · Electrical equipment, general requirements |
Serious | $280 | $140 | Jan 10, 2023 | Final |
| Citation 1, item 5b 29 CFR 1910.303(g)(1)(ii) · Electrical equipment, general requirements |
Serious | $0 | $0 | Jan 10, 2023 | Final |
| Citation 1, item 5c 29 CFR 1910.334(a)(2)(i) · Using electrical equipment |
Serious | $0 | $0 | Jan 10, 2023 | Final |
| Citation 1, item 5d 29 CFR 1910.334(a)(2)(ii) · Using electrical equipment |
Serious | $0 | $0 | Jan 10, 2023 | Final |
Fire Department Station 8 669 North Street, Greenwich, CT 06831 · Fire Protection · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1a 29 CFR 1910.157(e)(2) · Portable fire extinguishers |
Serious | $350 | $175 | Jan 10, 2023 | Final |
| Citation 1, item 1b 29 CFR 1910.157(e)(3) · Portable fire extinguishers |
Serious | $0 | $0 | Jan 10, 2023 | Final |
| Citation 1, item 2a 29 CFR 1910.215(a)(4) · Grinders and abrasive wheels |
Serious | $350 | $175 | Jan 10, 2023 | Final |
| Citation 1, item 2b 29 CFR 1910.215(b)(9) · Grinders and abrasive wheels |
Serious | $0 | $0 | Jan 10, 2023 | Final |
| Citation 1, item 3a 29 CFR 1910.303(b)(2) · Electrical equipment, general requirements |
Serious | $350 | $175 | Jan 10, 2023 | Final |
| Citation 1, item 3b 29 CFR 1910.305(b)(2)(i) · Electrical wiring methods |
Serious | $0 | $0 | Jan 10, 2023 | Final |
| Citation 1, item 3c 29 CFR 1910.305(g)(1)(iv)(a) · Electrical wiring methods |
Serious | $0 | $0 | Jan 10, 2023 | Final |
| Citation 1, item 3d 29 CFR 1910.305(g)(1)(iv)(d) · Electrical wiring methods |
Serious | $0 | $0 | Jan 10, 2023 | Final |
| Citation 1, item 3e 29 CFR 1910.334(a)(2)(i) · Using electrical equipment |
Serious | $0 | $0 | Jan 10, 2023 | Final |
| Citation 1, item 3f 29 CFR 1910.334(a)(2)(ii) · Using electrical equipment |
Serious | $0 | $0 | Jan 10, 2023 | Final |
Fire Department Headquarters 15 Havemeyer Place, Greenwich, CT 06830 · Fire Protection · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1a 29 CFR 1910.132(d)(1) · Personal protective equipment, general requirements |
Serious | $490 | $245 | Jan 10, 2023 | Final |
| Citation 1, item 1b 29 CFR 1910.133(a)(1) · Eye and face protection |
Serious | $0 | $0 | Jan 10, 2023 | Final |
| Citation 1, item 1c 29 CFR 1910.138(a) · Gloves and hand protection |
Serious | $0 | $0 | Jan 10, 2023 | Final |
| Citation 1, item 2a 29 CFR 1910.134(c)(1) · Respiratory protection |
Serious | $490 | $245 | Jan 10, 2023 | Final |
| Citation 1, item 2b 29 CFR 1910.134(e)(6)(i) · Respiratory protection |
Serious | $0 | $0 | Jan 10, 2023 | Final |
| Citation 1, item 2c 29 CFR 1910.134(e)(7)(ii) · Respiratory protection |
Serious | $0 | $0 | Jan 10, 2023 | Final |
| Citation 1, item 2d 29 CFR 1910.134(f)(2) · Respiratory protection |
Serious | $0 | $0 | Jan 10, 2023 | Final |
| Citation 1, item 3 29 CFR 1910.151(c) · First aid and eyewash |
Serious | $490 | $245 | Jan 10, 2023 | Final |
| Citation 1, item 4a 29 CFR 1910.1030(c)(1)(ii)(b) · Bloodborne pathogens |
Serious | $490 | $245 | Jan 10, 2023 | Final |
| Citation 1, item 4b 29 CFR 1910.1030(c)(1)(iv) · Bloodborne pathogens |
Serious | $0 | $0 | Jan 10, 2023 | Final |
| Citation 1, item 4c 29 CFR 1910.1030(h)(1)(ii)(b) · Bloodborne pathogens |
Serious | $0 | $0 | Jan 10, 2023 | Final |
| Citation 2, item 1 29 CFR 1910.1200(h)(3)(iv) · Hazard communication |
Other-than-serious | $0 | $0 | Jan 10, 2023 | Final |
Fire Department Station 8 669 North Street, Greenwich, CT 06831 · Fire Protection · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1910.151(c) · First aid and eyewash |
Serious | $490 | $245 | Jan 10, 2023 | Final |
Parks And Rec. Tree Division 393 North Street, Greenwich, CT 06830 · Landscaping Services · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1a 29 CFR 1910.157(c)(1) · Portable fire extinguishers |
Serious | $280 | $140 | Dec 28, 2022 | Final |
| Citation 1, item 1b 29 CFR 1910.157(e)(2) · Portable fire extinguishers |
Serious | $0 | $0 | Dec 28, 2022 | Final |
| Citation 1, item 2 29 CFR 1910.242(b) · Hand and power tools |
Serious | $350 | $175 | Dec 28, 2022 | Final |
| Citation 1, item 3a 29 CFR 1910.303(b)(2) · Electrical equipment, general requirements |
Serious | $280 | $140 | Dec 28, 2022 | Final |
| Citation 1, item 3b 29 CFR 1910.303(f)(2) · Electrical equipment, general requirements |
Serious | $0 | $0 | Dec 28, 2022 | Final |
| Citation 2, item 1 29 CFR 1910.132(d)(2) · Personal protective equipment, general requirements |
Other-than-serious | $0 | $0 | Dec 28, 2022 | Final |
Parks And Rec. Tree Division Field Operation Skylark Road At Sheldrake Road, Greenwich, CT 06830 · Landscaping Services · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 31-370(A) |
Serious | $800 | $320 | Dec 28, 2022 | Final |
| Citation 1, item 2 29 CFR 1910.140(c)(18) · Personal fall protection systems |
Serious | $490 | $245 | Dec 28, 2022 | Final |
P&r Tree Division North Street Shed 393 North Street, Greenwich, CT 06830 · Landscaping Services · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1a 29 CFR 1910.1030(c)(1)(i) · Bloodborne pathogens |
Serious | $420 | $210 | Dec 28, 2022 | Final |
| Citation 1, item 1b 29 CFR 1910.1030(g)(2)(ii)(b) · Bloodborne pathogens |
Serious | $0 | $0 | Dec 28, 2022 | Final |
| Citation 1, item 1c 29 CFR 1910.1030(g)(2)(vii)(d) · Bloodborne pathogens |
Serious | $0 | $0 | Dec 28, 2022 | Final |
P&r Tree Division Field Operations Skylark Road & Sheldrake Road, Greenwich, CT 06830 · Landscaping Services · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1910.95(d)(1) · Noise |
Other-than-serious | $0 | $0 | Dec 28, 2022 | Final |
Parks And Rec. Binney Park Maintenance Shed Binney Park Drive, Old Greenwich, CT 06870 · Landscaping Services · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1910.22(a)(3) · Walking-working surfaces |
Serious | $350 | $175 | Dec 28, 2022 | Final |
| Citation 1, item 2 29 CFR 1910.106(d)(2)(i) · Flammable liquids |
Serious | $420 | $210 | Dec 28, 2022 | Final |
| Citation 1, item 3a 29 CFR 1910.303(b)(2) · Electrical equipment, general requirements |
Serious | $280 | $140 | Dec 28, 2022 | Final |
| Citation 1, item 3b 29 CFR 1910.305(b)(2)(i) · Electrical wiring methods |
Serious | $0 | $0 | Dec 28, 2022 | Final |
| Citation 1, item 3c 29 CFR 1910.305(g)(1)(iv)(b) · Electrical wiring methods |
Serious | $0 | $0 | Dec 28, 2022 | Final |
| Citation 1, item 3d 29 CFR 1910.305(g)(1)(iv)(d) · Electrical wiring methods |
Serious | $0 | $0 | Dec 28, 2022 | Final |
| Citation 2, item 1 29 CFR 1910.132(d)(2) · Personal protective equipment, general requirements |
Other-than-serious | $0 | $0 | Dec 28, 2022 | Final |
| Citation 2, item 2 29 CFR 1910.157(e)(2) · Portable fire extinguishers |
Other-than-serious | $0 | $0 | Dec 28, 2022 | Final |
Parks And Rec. Bruce Park Maintenance Shed 100 Arch Street South, Greenwich, CT 06830 · Landscaping Services · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1910.106(d)(2)(i) · Flammable liquids |
Serious | $420 | $210 | Dec 28, 2022 | Final |
| Citation 1, item 2a 29 CFR 1910.157(c)(1) · Portable fire extinguishers |
Serious | $280 | $140 | Dec 28, 2022 | Final |
| Citation 1, item 2b 29 CFR 1910.157(e)(2) · Portable fire extinguishers |
Serious | $0 | $0 | Dec 28, 2022 | Final |
| Citation 1, item 3a 29 CFR 1910.303(b)(2) · Electrical equipment, general requirements |
Serious | $350 | $175 | Dec 28, 2022 | Final |
| Citation 1, item 3b 29 CFR 1910.305(b)(1)(ii) · Electrical wiring methods |
Serious | $0 | $0 | Dec 28, 2022 | Final |
| Citation 2, item 1 29 CFR 1910.132(d)(2) · Personal protective equipment, general requirements |
Other-than-serious | $0 | $0 | Dec 28, 2022 | Final |
Parks And Rec. Equipment Maintenance Garage 100 Arch Street South, Greenwich, CT 06830 · Home and Garden Equipment Repair and Maintenance · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1910.37(b)(2) · Exit routes |
Serious | $350 | $175 | Dec 28, 2022 | Final |
| Citation 1, item 2a 29 CFR 1910.147(c)(1) · Lockout/tagout |
Serious | $420 | $210 | Dec 28, 2022 | Final |
| Citation 1, item 2b 29 CFR 1910.147(c)(4)(i) · Lockout/tagout |
Serious | $0 | $0 | Dec 28, 2022 | Final |
| Citation 1, item 2c 29 CFR 1910.147(c)(7)(i) · Lockout/tagout |
Serious | $0 | $0 | Dec 28, 2022 | Final |
| Citation 1, item 3 29 CFR 1910.212(b) · Machine guarding |
Serious | $280 | $140 | Dec 28, 2022 | Final |
| Citation 1, item 4 29 CFR 1910.244(a)(1)(ii) · Other portable tools and equipment |
Serious | $280 | $140 | Dec 28, 2022 | Final |
| Citation 1, item 5a 29 CFR 1910.303(b)(2) · Electrical equipment, general requirements |
Serious | $280 | $140 | Dec 28, 2022 | Final |
| Citation 1, item 5b 29 CFR 1910.305(g)(1)(iv)(a) · Electrical wiring methods |
Serious | $0 | $0 | Dec 28, 2022 | Final |
| Citation 1, item 5c 29 CFR 1910.334(a)(2)(i) · Using electrical equipment |
Serious | $0 | $0 | Dec 28, 2022 | Final |
| Citation 1, item 5d 29 CFR 1910.334(a)(2)(ii) · Using electrical equipment |
Serious | $0 | $0 | Dec 28, 2022 | Final |
| Citation 2, item 1 29 CFR 1910.132(d)(2) · Personal protective equipment, general requirements |
Other-than-serious | $0 | $0 | Dec 28, 2022 | Final |
| Citation 2, item 2 29 CFR 1910.157(e)(2) · Portable fire extinguishers |
Other-than-serious | $0 | $0 | Dec 28, 2022 | Final |
P&r Binney Park Shed Binney Park Drive, Old Greenwich, CT 06870 · Landscaping Services · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1910.106(d)(3)(ii) · Flammable liquids |
Serious | $350 | $175 | Dec 28, 2022 | Final |
| Citation 1, item 2a 29 CFR 1910.1030(c)(1)(i) · Bloodborne pathogens |
Serious | $420 | $210 | Dec 28, 2022 | Final |
| Citation 1, item 2b 29 CFR 1910.1030(f)(2)(i) · Bloodborne pathogens |
Serious | $0 | $0 | Dec 28, 2022 | Final |
| Citation 1, item 2c 29 CFR 1910.1030(g)(2)(ii)(b) · Bloodborne pathogens |
Serious | $0 | $0 | Dec 28, 2022 | Final |
| Citation 2, item 1 29 CFR 1910.95(d)(1) · Noise |
Other-than-serious | $0 | $0 | Dec 28, 2022 | Final |
P&r Bruce Park Shed 100 Arch Street South, Greenwich, CT 06830 · Landscaping Services · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1910.134(c)(2)(i) · Respiratory protection |
Other-than-serious | $0 | $0 | Dec 28, 2022 | Final |
| Citation 1, item 2 29 CFR 1910.1200(f)(6)(ii) · Hazard communication |
Other-than-serious | $0 | $0 | Dec 28, 2022 | Final |
P&r Bruce Park Equipment Maintenance Garage 100 Arch Street South, Greenwich, CT 06830 · Home and Garden Equipment Repair and Maintenance · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1910.151(c) · First aid and eyewash |
Serious | $420 | $210 | Dec 28, 2022 | Final |
| Citation 1, item 2a 29 CFR 1910.252(b)(2)(iii) · Welding fire safety |
Serious | $420 | $210 | Dec 28, 2022 | Final |
| Citation 1, item 2b 29 CFR 1910.254(d)(9)(iii) · Arc welding and cutting |
Serious | $0 | $0 | Dec 28, 2022 | Final |
| Citation 2, item 1 29 CFR 1910.1200(f)(6)(ii) · Hazard communication |
Other-than-serious | $0 | $0 | Dec 28, 2022 | Final |
Dpw Building Construction And Maintenance 1 Newman Street, Cos Cob, CT 06807 · Facilities Support Services · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1a 29 CFR 1910.23(b)(9) · Ladders in general industry |
Serious | $420 | $210 | Dec 28, 2022 | Final |
| Citation 1, item 1b 29 CFR 1910.23(b)(10) · Ladders in general industry |
Serious | $0 | $0 | Dec 28, 2022 | Final |
| Citation 1, item 2a 29 CFR 1910.37(a)(3) · Exit routes |
Serious | $350 | $175 | Dec 28, 2022 | Final |
| Citation 1, item 2b 29 CFR 1910.37(b)(5) · Exit routes |
Serious | $0 | $0 | Dec 28, 2022 | Final |
| Citation 1, item 3 29 CFR 1910.101(b) · Compressed gases (general requirements) |
Serious | $350 | $175 | Dec 28, 2022 | Final |
| Citation 1, item 4a 29 CFR 1910.147(c)(1) · Lockout/tagout |
Serious | $420 | $210 | Dec 28, 2022 | Final |
| Citation 1, item 4b 29 CFR 1910.147(c)(4)(i) · Lockout/tagout |
Serious | $0 | $0 | Dec 28, 2022 | Final |
| Citation 1, item 4c 29 CFR 1910.147(c)(7)(i) · Lockout/tagout |
Serious | $0 | $0 | Dec 28, 2022 | Final |
| Citation 1, item 5a 29 CFR 1910.157(c)(1) · Portable fire extinguishers |
Serious | $350 | $175 | Dec 28, 2022 | Final |
| Citation 1, item 5b 29 CFR 1910.157(e)(2) · Portable fire extinguishers |
Serious | $0 | $0 | Dec 28, 2022 | Final |
| Citation 1, item 6 29 CFR 1910.212(b) · Machine guarding |
Serious | $350 | $175 | Dec 28, 2022 | Final |
| Citation 1, item 7a 29 CFR 1910.303(b)(2) · Electrical equipment, general requirements |
Serious | $280 | $140 | Dec 28, 2022 | Final |
| Citation 1, item 7b 29 CFR 1910.305(b)(2)(i) · Electrical wiring methods |
Serious | $0 | $0 | Dec 28, 2022 | Final |
| Citation 2, item 1 29 CFR 1910.132(d)(2) · Personal protective equipment, general requirements |
Other-than-serious | $0 | $0 | Dec 28, 2022 | Final |
Dpw Holly Hill Resource Recovery Center 4 Holly Hill Lane, Greenwich, CT 06830 · Solid Waste Landfill · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1a 29 CFR 1910.157(c)(1) · Portable fire extinguishers |
Serious | $280 | $140 | Dec 28, 2022 | Final |
| Citation 1, item 1b 29 CFR 1910.157(e)(2) · Portable fire extinguishers |
Serious | $0 | $0 | Dec 28, 2022 | Final |
| Citation 1, item 1c 29 CFR 1910.157(g)(1) · Portable fire extinguishers |
Serious | $0 | $0 | Dec 28, 2022 | Final |
| Citation 1, item 2 29 CFR 1910.303(b)(2) · Electrical equipment, general requirements |
Serious | $280 | $140 | Dec 28, 2022 | Final |
| Citation 2, item 1 29 CFR 1910.132(d)(2) · Personal protective equipment, general requirements |
Other-than-serious | $0 | $0 | Dec 28, 2022 | Final |
Dpw Building Construction And Maintenance 1 Newman Street, Cos Cob, CT 06807 · Facilities Support Services · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1a 29 CFR 1910.22(a)(1) · Walking-working surfaces |
Serious | $350 | $175 | Dec 28, 2022 | Final |
| Citation 1, item 1b 29 CFR 1910.176(b) · Material storage and aisles |
Serious | $0 | $0 | Dec 28, 2022 | Final |
| Citation 1, item 2 29 CFR 1910.1030(c)(1)(i) · Bloodborne pathogens |
Serious | $490 | $245 | Dec 28, 2022 | Final |
| Citation 2, item 1 29 CFR 1910.134(c)(2)(i) · Respiratory protection |
Other-than-serious | $0 | $0 | Dec 28, 2022 | Final |
| Citation 2, item 2 29 CFR 1910.151(c) · First aid and eyewash |
Other-than-serious | $0 | $0 | Dec 28, 2022 | Final |
Dpw Holly Hill Resource Recovery Facility 4 Holly Hill Lane, Greenwich, CT 06830 · Solid Waste Landfill · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
Dpw Highway Department Indian Field Shed 100 Indian Field Road, Greenwich, CT 06830 · Highway, Street, and Bridge Construction · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1a 29 CFR 1910.37(a)(3) · Exit routes |
Serious | $420 | $210 | Dec 28, 2022 | Final |
| Citation 1, item 1b 29 CFR 1910.37(b)(2) · Exit routes |
Serious | $0 | $0 | Dec 28, 2022 | Final |
| Citation 1, item 2a 29 CFR 1910.147(c)(1) · Lockout/tagout |
Serious | $490 | $245 | Dec 28, 2022 | Final |
| Citation 1, item 2b 29 CFR 1910.147(c)(4)(i) · Lockout/tagout |
Serious | $0 | $0 | Dec 28, 2022 | Final |
| Citation 1, item 2c 29 CFR 1910.147(c)(7)(i) · Lockout/tagout |
Serious | $0 | $0 | Dec 28, 2022 | Final |
| Citation 1, item 3a 29 CFR 1910.157(c)(1) · Portable fire extinguishers |
Serious | $350 | $175 | Dec 28, 2022 | Final |
| Citation 1, item 3b 29 CFR 1910.157(e)(2) · Portable fire extinguishers |
Serious | $0 | $0 | Dec 28, 2022 | Final |
| Citation 1, item 4a 29 CFR 1910.303(b)(2) · Electrical equipment, general requirements |
Serious | $350 | $175 | Dec 28, 2022 | Final |
| Citation 1, item 4b 29 CFR 1910.303(f)(2) · Electrical equipment, general requirements |
Serious | $0 | $0 | Dec 28, 2022 | Final |
| Citation 1, item 4c 29 CFR 1910.305(b)(2)(i) · Electrical wiring methods |
Serious | $0 | $0 | Dec 28, 2022 | Final |
| Citation 1, item 4d 29 CFR 1910.305(e)(1) · Electrical wiring methods |
Serious | $0 | $0 | Dec 28, 2022 | Final |
| Citation 1, item 4e 29 CFR 1910.305(g)(1)(iv)(d) · Electrical wiring methods |
Serious | $0 | $0 | Dec 28, 2022 | Final |
| Citation 1, item 4f 29 CFR 1910.334(a)(2)(i) · Using electrical equipment |
Serious | $0 | $0 | Dec 28, 2022 | Final |
| Citation 1, item 4g 29 CFR 1910.334(a)(2)(ii) · Using electrical equipment |
Serious | $0 | $0 | Dec 28, 2022 | Final |
| Citation 2, item 1 29 CFR 1910.132(d)(2) · Personal protective equipment, general requirements |
Other-than-serious | $0 | $0 | Dec 28, 2022 | Final |
| Citation 2, item 2 29 CFR 1910.184(e)(3)(ii) · Slings |
Other-than-serious | $0 | $0 | Dec 28, 2022 | Final |
Dpw Highway Department Old Greenwich Shed 60 West End Avenue, Old Greenwich, CT 06870 · Highway, Street, and Bridge Construction · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1a 29 CFR 1910.303(b)(2) · Electrical equipment, general requirements |
Serious | $350 | $175 | Dec 28, 2022 | Final |
| Citation 1, item 1b 29 CFR 1910.305(g)(1)(iv)(a) · Electrical wiring methods |
Serious | $0 | $0 | Dec 28, 2022 | Final |
| Citation 1, item 1c 29 CFR 1910.305(a)(2)(i)(a) · Electrical wiring methods |
Serious | $0 | $0 | Dec 28, 2022 | Final |
| Citation 2, item 1 29 CFR 1910.132(d)(2) · Personal protective equipment, general requirements |
Other-than-serious | $0 | $0 | Dec 28, 2022 | Final |
Dpw Highway Department Signs & Lines Division 1 Newman Street, Cos Cob, CT 06807 · Highway, Street, and Bridge Construction · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1a 29 CFR 1910.147(c)(4)(i) · Lockout/tagout |
Serious | $420 | $210 | Dec 28, 2022 | Final |
| Citation 1, item 1b 29 CFR 1910.147(c)(4)(ii) · Lockout/tagout |
Serious | $0 | $0 | Dec 28, 2022 | Final |
| Citation 1, item 1c 29 CFR 1910.147(c)(7)(i) · Lockout/tagout |
Serious | $0 | $0 | Dec 28, 2022 | Final |
| Citation 1, item 2a 29 CFR 1910.303(g)(2)(i) · Electrical equipment, general requirements |
Serious | $350 | $175 | Dec 28, 2022 | Final |
| Citation 1, item 2b 29 CFR 1910.305(g)(1)(iv)(d) · Electrical wiring methods |
Serious | $0 | $0 | Dec 28, 2022 | Final |
| Citation 2, item 1 29 CFR 1910.22(a)(1) · Walking-working surfaces |
Other-than-serious | $0 | $0 | Dec 28, 2022 | Final |
| Citation 2, item 2 29 CFR 1910.132(d)(2) · Personal protective equipment, general requirements |
Other-than-serious | $0 | $0 | Dec 28, 2022 | Final |
| Citation 2, item 3 29 CFR 1910.157(c)(1) · Portable fire extinguishers |
Other-than-serious | $0 | $0 | Dec 28, 2022 | Final |
Fleet Maintenance Garage 100 Indian Field Road, Greenwich, CT 06830 · General Automotive Repair · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1a 29 CFR 1910.22(a)(1) · Walking-working surfaces |
Serious | $350 | $175 | Dec 28, 2022 | Final |
| Citation 1, item 1b 29 CFR 1910.176(b) · Material storage and aisles |
Serious | $0 | $0 | Dec 28, 2022 | Final |
| Citation 1, item 2 29 CFR 1910.37(a)(3) · Exit routes |
Serious | $350 | $175 | Dec 28, 2022 | Final |
| Citation 1, item 3a 29 CFR 1910.147(c)(1) · Lockout/tagout |
Serious | $490 | $245 | Dec 28, 2022 | Final |
| Citation 1, item 3b 29 CFR 1910.147(c)(4)(i) · Lockout/tagout |
Serious | $0 | $0 | Dec 28, 2022 | Final |
| Citation 1, item 3c 29 CFR 1910.147(c)(7)(i) · Lockout/tagout |
Serious | $0 | $0 | Dec 28, 2022 | Final |
| Citation 1, item 4a 29 CFR 1910.184(d) · Slings |
Serious | $350 | $175 | Dec 28, 2022 | Final |
| Citation 1, item 4b 29 CFR 1910.184(e)(3)(i) · Slings |
Serious | $0 | $0 | Dec 28, 2022 | Final |
| Citation 1, item 4c 29 CFR 1910.184(e)(3)(ii) · Slings |
Serious | $0 | $0 | Dec 28, 2022 | Final |
| Citation 1, item 5 29 CFR 1910.215(b)(9) · Grinders and abrasive wheels |
Serious | $350 | $175 | Dec 28, 2022 | Final |
| Citation 1, item 6a 29 CFR 1910.244(a)(1)(ii) · Other portable tools and equipment |
Serious | $350 | $175 | Dec 28, 2022 | Final |
| Citation 1, item 6b 29 CFR 1910.244(a)(2)(vi)(a) · Other portable tools and equipment |
Serious | $0 | $0 | Dec 28, 2022 | Final |
| Citation 1, item 7a 29 CFR 1910.303(b)(2) · Electrical equipment, general requirements |
Serious | $350 | $175 | Dec 28, 2022 | Final |
| Citation 1, item 7b 29 CFR 1910.303(g)(1)(ii) · Electrical equipment, general requirements |
Serious | $0 | $0 | Dec 28, 2022 | Final |
| Citation 1, item 7c 29 CFR 1910.305(g)(1)(iv)(a) · Electrical wiring methods |
Serious | $0 | $0 | Dec 28, 2022 | Final |
| Citation 1, item 7d 29 CFR 1910.305(g)(1)(iv)(d) · Electrical wiring methods |
Serious | $0 | $0 | Dec 28, 2022 | Final |
| Citation 2, item 1 29 CFR 1910.132(d)(2) · Personal protective equipment, general requirements |
Other-than-serious | $0 | $0 | Dec 28, 2022 | Final |
| Citation 2, item 2 29 CFR 1910.157(c)(1) · Portable fire extinguishers |
Other-than-serious | $0 | $0 | Dec 28, 2022 | Final |
Dpw Highway Department Indian Field Shed 100 Indian Field Road, Greenwich, CT 06830 · Highway, Street, and Bridge Construction · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1910.151(c) · First aid and eyewash |
Serious | $420 | $210 | Dec 28, 2022 | Final |
| Citation 1, item 2a 29 CFR 1910.1053(d)(1) · Silica dust in general industry |
Serious | $490 | $245 | Dec 28, 2022 | Final |
| Citation 1, item 2b 29 CFR 1926.1153(g)(1) · Silica dust in construction |
Serious | $0 | $0 | Dec 28, 2022 | Final |
| Citation 1, item 2c 29 CFR 1926.1153(i)(2)(i) · Silica dust in construction |
Serious | $0 | $0 | Dec 28, 2022 | Final |
| Citation 1, item 3a 29 CFR 1910.1200(f)(6)(ii) · Hazard communication |
Serious | $350 | $175 | Dec 28, 2022 | Final |
| Citation 1, item 3b 29 CFR 1910.1200(h)(1) · Hazard communication |
Serious | $0 | $0 | Dec 28, 2022 | Final |
| Citation 2, item 1 29 CFR 1910.134(c)(2)(i) · Respiratory protection |
Other-than-serious | $0 | $0 | Dec 28, 2022 | Final |
Dpw Highway Department Old Greenwich Shed 60 West End Avenue, Old Greenwich, CT 06870 · Highway, Street, and Bridge Construction · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1910.1200(f)(6)(ii) · Hazard communication |
Other-than-serious | $0 | $0 | Dec 28, 2022 | Final |
Fleet Maintenance Garage 100 Indian Field Road, Greenwich, CT 06830 · General Automotive Repair · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1a 29 CFR 1910.253(b)(4)(iii) · Gas welding and cutting |
Serious | $420 | $210 | Dec 28, 2022 | Final |
| Citation 1, item 1b 29 CFR 1910.254(d)(9)(iii) · Arc welding and cutting |
Serious | $0 | $0 | Dec 28, 2022 | Final |
| Citation 1, item 2a 29 CFR 1910.1200(f)(6)(ii) · Hazard communication |
Serious | $280 | $140 | Dec 28, 2022 | Final |
| Citation 1, item 2b 29 CFR 1910.1200(h)(1) · Hazard communication |
Serious | $0 | $0 | Dec 28, 2022 | Final |
| Citation 2, item 1 29 CFR 1910.134(c)(2)(i) · Respiratory protection |
Other-than-serious | $0 | $0 | Dec 28, 2022 | Final |
Dpw Highway Department Signs & Lines 1 Newman Street, Cos Cob, CT 06807 · Highway, Street, and Bridge Construction · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
From the Form 300A summaries employers file with OSHA each year. Rate = recordable cases per 100 full-time workers.
In 2025, the Greenwich site logged 19 recordable injuries or illnesses among about 1,471 workers: 1.4 per 100 full-time workers, against a median of 3.0 for its industry. Those cases cost 185 days away from work.
| Site and year | Workers | Cases | Days-away cases | Rate | Industry median |
|---|---|---|---|---|---|
| Town of Greenwich Board of Education Greenwich · 2025 | 1,471 | 19 | 12 | 1.4 | 3.0 |
| Town of Greenwich-General Government Greenwich · 2025 | 311 | 1 | 0 | 0.3 | 3.1 |
| Greenwich Police Department Greenwich · 2025 | 199 | 15 | 4 | 7.2 | 5.5 |
| The Nathaniel Witherell Nursing Home Greenwich · 2025 | 203 | 8 | 6 | 4.3 | 5.5 |
| Town of Greenwich Fire Department Greenwich · 2025 | 197 | 7 | 3 | 3.9 | 5.5 |
| Town of Greenwich Parks and Recreation Department Greenwich · 2025 | 179 | 12 | 3 | 7.4 | 3.3 |
| Town of Greenwich Department of Public Works Greenwich · 2025 | 169 | 9 | 5 | 5.9 | 2.2 |
| Greenwich Library Greenwich · 2025 | 89 | 1 | 0 | 1.2 | 0.0 |
Included with any plan: 77 more yearly logs from these sites, back to 2016, with each site's average rate over its latest three years. Already a subscriber? Sign in.
See plansCurrent text from the Code of Federal Regulations. Some citations were issued under older wording.
29 CFR 1910.101(b)
(b) Compressed gases. The in-plant handling, storage, and utilization of all compressed gases in cylinders, portable tanks, rail tankcars, or motor vehicle cargo tanks shall be in accordance with Compressed Gas Association Pamphlet P-1-1965, which is incorporated by reference as specified in § 1910.6.
29 CFR 1910.1030(c)(1)(i)
(c) Exposure control—(1) Exposure Control Plan. (i) Each employer having an employee(s) with occupational exposure as defined by paragraph (b) of this section shall establish a written Exposure Control Plan designed to eliminate or minimize employee exposure.
29 CFR 1910.1030(c)(1)(ii)(b)
(B) The schedule and method of implementation for paragraphs (d) Methods of Compliance, (e) HIV and HBV Research Laboratories and Production Facilities, (f) Hepatitis B Vaccination and Post-Exposure Evaluation and Follow-up, (g) Communication of Hazards to Employees, and (h) Recordkeeping, of this standard, and
Alert subscribers get notified of each newly cited employer in Connecticut the morning it is posted. See the alert plans.
Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.