OSHA SearchOSHA records by employer

Trident Building Systems, Inc.: OSHA inspections and violations

Sarasota, Florida · Prefabricated Metal Building and Component Manufacturing · NAICS 332311

17inspections
29citation items
$28,426current penalties
Jun 23, 2020last inspection

OSHA has inspected Trident Building Systems, Inc. 17 times in Florida since 1992.

The latest one began on Jun 23, 2020 as a planned inspection, in Nokomis.

Those inspections ended with 29 citation items: 16 serious and 13 other-than-serious.

Penalties were first proposed at $90,743 and now stand at $28,426, 69% lower after settlements or reviews.

Lockout/tagout comes up most often in these citations: 3 items under 1910.147.

How that compares: the median penalty per cited inspection for manufacturing employers since 2015 is $3,600, and Trident Building Systems, Inc. averages $2,675 (3 cited inspections).

Trident Building Systems, Inc. also files yearly injury logs with OSHA, summarized below.

It reported 5 severe injuries to OSHA since 2015.

Trident Building Systems, Inc.: OSHA citation items per year, 1992 to 2020
Citation items per year, by inspection date.

Florida · latest 90 days of OSHA records

338employers cited

Get notified the morning OSHA posts each new citation in Florida: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Florida

Checking a subcontractor, a client or your own company? Watch Trident Building Systems, Inc. and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 344807177 OPENED JUN 23, 2020Closed

Planned · Complete · Safety · 12 employees at the site · Closed Oct 5, 2020

16501 Honore Ave, Nokomis, FL 34275 · Prefabricated Metal Building and Component Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.404(f)(6) · Ground-fault protection on job sites
Other-than-serious$0$0Sep 8, 2020Final

Inspection 344583398 OPENED JAN 24, 2020Closed

Referral · Partial · Safety · 4 employees at the site · Closed May 6, 2020

2812 Tallevast Rd, Sarasota, FL 34243 · Prefabricated Metal Building and Component Manufacturing · OSHA's record · Phone and website on Google Maps

Incident on Dec 20, 2019: Employee suffers skull fracture in fall from scissor lift

At 10:00 a.m. on December 20, 2019, an employee was working for a firm that manufactured prefabricated metal buildings and components. He was working as a laborer. He was on a construction project that involved roofing. He was working from a scissor lift. He was taking out a fan. The fan fell and, with its momentum, took the employee with it over a guardrail. The employee fell 8 to 10 feet (2.4 to 3.0 meters). He suffered a skull fracture when he hit the ground. He was hospitalized.

No citations from this inspection.

Inspection 343589412 OPENED NOV 8, 2018Closed

Monitoring · Partial · Safety · 175 employees at the site · Closed Nov 20, 2018

2812 Tallevast Rd., Sarasota, FL 34243 · Prefabricated Metal Building and Component Manufacturing · OSHA's record · Phone and website on Google Maps

Incident on Apr 17, 2018: Employee falls when caught by crane as load shifts and fract

At 2:15 p.m. on April 17, 2018, an employee was working the crane remote and fell when the load shifted, fracturing his elbow. The employee was hospitalized.

No citations from this inspection.

Inspection 343131850 OPENED MAY 1, 2018Closed

Referral · Partial · Safety · 6 employees at the site · Closed Aug 28, 2018

10560 Reynolds Street, Bonita Springs, FL 34135 · Prefabricated Metal Building and Component Manufacturing · OSHA's record · Phone and website on Google Maps

Incident on Apr 26, 2018: Employee is struck by steel beam when it slips from clamp an

At 11:00 a.m. on April 26, 2018, an employee was adjusting the straps on an 800 lb steel beam that was to be lifted. When it was lifted, the employee was struck by it when it slipped and fell to the ground. The employee was hospitalized with several fractured ribs, multiple lacerations, and contusions. contusions.

No citations from this inspection.

Inspection 341728830 OPENED AUG 26, 2016Closed

Referral · Partial · Safety · 60 employees at the site · Closed Mar 31, 2017

2812 Tallevast Rd, Sarasota, FL 34243 · Prefabricated Metal Building and Component Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.212(a)(3)(ii) · Machine guarding
Serious$8,873$5,324Jan 18, 2017Final

Inspection 340667518 OPENED APR 27, 2015Closed

Complaint · Partial · Safety · 157 employees at the site · Closed Dec 18, 2015

2812 Tallevast Rd, Sarasota, FL 34243 · Fabricated Structural Metal Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 2a Serious$2,700$2,700Oct 26, 2015Final
Citation 1, item 2b
29 CFR 1910.303(f)(1) · Electrical equipment, general requirements
Serious$0$0Oct 26, 2015Final
Citation 1, item 2c
29 CFR 1910.303(f)(2) · Electrical equipment, general requirements
Serious$0$0Oct 26, 2015Final
Citation 2, item 1
29 CFR 1910.101(b) · Compressed gases (general requirements)
Other-than-serious$0$0Oct 26, 2015Final
Citation 2, item 2
29 CFR 1910.178(q)(1) · Forklifts and other powered industrial trucks
Other-than-serious$0$0Oct 26, 2015Final

Inspection 339443061 OPENED SEP 25, 2013Closed

Complaint · Partial · Health · 60 employees at the site · Closed Jan 15, 2014

2812 Tallevast Rd, Sarasota, FL 34243 · Prefabricated Metal Building and Component Manufacturing · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 339245763 OPENED JUL 31, 2013Closed

Referral · Partial · Health · 92 employees at the site · Closed Jun 4, 2014

2812 Tallevast Road, Sarasota, FL 34243 · Prefabricated Metal Building and Component Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1 Other-than-serious$4,200$2,580Sep 16, 2013Final
9 older inspections

Inspection 339175069 OPENED JUL 11, 2013Closed

Planned · Complete · Safety · 92 employees at the site · Closed Jun 4, 2014

2812 Tallevast Rd, Sarasota, FL 34243 · Prefabricated Metal Building and Component Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 2
29 CFR 1910.157(g)(2) · Portable fire extinguishers
Other-than-serious$1,890$1,417Nov 4, 2013Final
Citation 1, item 3a
29 CFR 1910.215(a)(4) · Grinders and abrasive wheels
Serious$3,150$3,150Nov 4, 2013Final
Citation 1, item 3b
29 CFR 1910.215(b)(9) · Grinders and abrasive wheels
Serious$3,150$0Nov 4, 2013Final
Citation 1, item 5
29 CFR 1910.253(b)(4)(iii) · Gas welding and cutting
Serious$3,150$3,150Nov 4, 2013Final
Citation 2, item 1
29 CFR 1910.23(d)(1)(iv) · Guarding floor and wall openings and holes
Other-than-serious$0$0Nov 4, 2013Final
Citation 2, item 3
29 CFR 1910.39(c) · Fire prevention plans
Other-than-serious$0$0Nov 4, 2013Final
Citation 2, item 4
29 CFR 1910.147(c)(6)(i) · Lockout/tagout
Other-than-serious$630$630Nov 4, 2013Final

Inspection 339064081 OPENED MAY 7, 2013Closed

Planned · Complete · Safety · 8 employees at the site · Closed Jul 16, 2013

389 Stadium Drive Fsu Indoor Practice Field, Tallahassee, FL 32301 · Prefabricated Metal Building and Component Manufacturing · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 315081885 OPENED OCT 29, 2010Closed

Complaint · Partial · Safety · 2 employees at the site · Closed Nov 10, 2010

8320 Lockwood Ridge Road, Sarasota, FL 34243 · Site Preparation Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 310664487 OPENED DEC 7, 2006Closed

Planned · Partial · Safety · 6 employees at the site · Closed Dec 31, 2007

5965 31st St. S., St. Petersburg, FL 33712 · Structural Steel and Precast Concrete Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.760(a)(1) · Fall protection
Serious$56,000$5,600Mar 26, 2007Final

Inspection 307001735 OPENED OCT 10, 2003Closed

Unprogrammed other · Partial · Safety · 14 employees at the site · Closed Dec 30, 2003

Carrollwood Commons/ 15020 N. Dale Mabry Hwy., Tampa, FL 33624 · Structural Steel and Precast Concrete Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.453(b)(2)(v) · Aerial lifts
Serious$1,500$1,125Dec 3, 2003Closed
Citation 1, item 1b Serious$0$0Dec 3, 2003Closed

Inspection 303791321 OPENED AUG 10, 2001Closed

Planned · Complete · Health · 150 employees at the site · Closed Jul 17, 2002

7080 28th Ct E, Sarasota, FL 34243 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.147(c)(4)(i) · Lockout/tagout
Serious$1,100$550Dec 14, 2001Closed
Citation 1, item 2
29 CFR 1910.151(c) · First aid and eyewash
Serious$1,100$550Dec 14, 2001Closed
Citation 1, item 3
29 CFR 1910.212(a)(3)(ii) · Machine guarding
Serious$1,100$550Dec 14, 2001Closed
Citation 1, item 4a
29 CFR 1910.254(d)(2) · Arc welding and cutting
Serious$1,100$550Dec 14, 2001Closed
Citation 1, item 4b
29 CFR 1910.254(d)(9)(iii) · Arc welding and cutting
Serious$0$0Dec 14, 2001Closed
Citation 1, item 5
29 CFR 1910.334(a)(2)(i) · Using electrical equipment
Serious$1,100$550Dec 14, 2001Closed
Citation 2, item 1 Other-than-serious$0$0Dec 14, 2001Closed
Citation 2, item 2
29 CFR 1910.134(c)(2)(i) · Respiratory protection
Other-than-serious$0$0Dec 14, 2001Closed
Citation 2, item 3 Other-than-serious$0$0Dec 14, 2001Closed
Citation 2, item 4 Other-than-serious$0$0Dec 14, 2001Closed
Citation 2, item 5
29 CFR 1910.141(d)(1) · Sanitation
Other-than-serious$0$0Dec 14, 2001Closed

Inspection 109016709 OPENED JUN 7, 1996Closed

Referral · Partial · Safety · 3 employees at the site · Closed Aug 21, 1996

3000 Harbourside Drive, Longboat Key, FL 34228 · OSHA's record · Phone and website on Google Maps

Incident on Jun 6, 1996: Employee injured in fall from steel beam

Employee #1 suffered fractures after falling from a 12-ft-high steel beam.

No citations from this inspection.

Inspection 109607812 OPENED MAR 10, 1994Closed

Planned · Complete · Safety · 1 employee at the site · Closed Apr 13, 1994

6025 Bayshore Road, Palmetto, FL 34243 · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 106498546 OPENED JUN 30, 1992Closed

Planned · Complete · Safety · 2 employees at the site · Closed Jul 7, 1992

7285 Proctor Road, Sarasota, FL 34241 · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Injury and illness logs

From the Form 300A summaries employers file with OSHA each year. Rate = recordable cases per 100 full-time workers.

In 2024, the Sarasota site logged 11 recordable injuries or illnesses among about 82 workers: 14.6 per 100 full-time workers, against a median of 3.6 for its industry. Those cases cost 4 days away from work.

Site and yearWorkersCasesDays-away casesRateIndustry median
Trident Building Systems, LLC
Sarasota · 2024
82 11314.63.6
Trident Building Systems
Sarasota · 2021
140 1349.03.6
Trident Building Systems, Inc.
Sarasota · 2020
150 623.93.6

Included with any plan: 6 more yearly logs from these sites, back to 2016, with each site's average rate over its latest three years. Already a subscriber? Sign in.

See plans

Severe injury reports

Employers must report any work-related amputation, in-patient hospitalization or loss of an eye to OSHA within 24 hours. 5 reports on file.

Apr 26, 2018, Bonita Springs: Hospitalization · fractures · chest, except internal location of diseases or disorders

A rigging crew was adjusting the straps of an 800 lb. steel beam member being lifted as part of a steel building construction when the beam clamp slipped and the beam fell, striking an employee who was checking rigging nearby on his back. He suffered broken ribs and lacerations.

Apr 17, 2018, Sarasota: Hospitalization · fractures and dislocations · elbow(s)

An employee was standing on the ground using an overhead crane to move small light beams from a conveyor to a staging area when the stack of beams became unstable and started to fall over. As he attempted to get out of the way of the falling beams, he fell to the ground, dislocating/fracturing his left elbow. He was hospitalized and had surgery.

May 4, 2017, Sarasota: Hospitalization · fractures · hand(s) and wrist(s)

An employee was putting a strap around a steel beam when another beam shifted and fell on his right hand, fracturing his right wrist and breaking fingers.

Aug 19, 2016, Sarasota: Hospitalization, amputation · amputations · hand(s), unspecified

An employee's hand was caught in a machine's pinch point.

Apr 16, 2015, Sarasota: Hospitalization, amputation · fractures · ankle(s)

An employee was cleaning steel beams. The beams rolled and fell on his ankle causing fractures.

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.101 · Compressed gases (general requirements)

29 CFR 1910.101(b)

(b) Compressed gases. The in-plant handling, storage, and utilization of all compressed gases in cylinders, portable tanks, rail tankcars, or motor vehicle cargo tanks shall be in accordance with Compressed Gas Association Pamphlet P-1-1965, which is incorporated by reference as specified in § 1910.6.

29 CFR 1910.134 · Respiratory protection

29 CFR 1910.134(c)(2)(i)

(i) An employer may provide respirators at the request of employees or permit employees to use their own respirators, if the employer determines that such respirator use will not in itself create a hazard. If the employer determines that any voluntary respirator use is permissible, the employer shall provide the respirator users with the information contained in appendix D to this section (“Information for Employees Using Respirators When Not Required Under the Standard”); and

29 CFR 1910.141 · Sanitation

29 CFR 1910.141(c)(1)(i)

(c) Toilet facilities—(1) General. (i) Except as otherwise indicated in this paragraph (c)(1)(i), toilet facilities, in toilet rooms separate for each sex, shall be provided in all places of employment in accordance with table J-1 of this section. The number of facilities to be provided for each sex shall be based on the number of employees of that sex for whom the facilities are furnished. Where toilet rooms will be occupied by no more than one person at a time, can be locked from the inside, and contain at least one water closet, separate toilet rooms for each sex need not be provided. Where such single-occupancy rooms have more than one toilet facility, only one such facility in each toilet room shall be counted for the purpose of table J-1.

29 CFR 1910.147 · Lockout/tagout

29 CFR 1910.151 · First aid and eyewash

29 CFR 1910.157 · Portable fire extinguishers

29 CFR 1910.178 · Forklifts and other powered industrial trucks

29 CFR 1910.212 · Machine guarding

29 CFR 1910.215 · Grinders and abrasive wheels

29 CFR 1910.23 · Guarding floor and wall openings and holes

29 CFR 1910.253 · Gas welding and cutting

29 CFR 1910.254 · Arc welding and cutting

29 CFR 1910.303 · Electrical equipment, general requirements

29 CFR 1910.334 · Using electrical equipment

29 CFR 1910.39 · Fire prevention plans

29 CFR 1910.95 · Noise

29 CFR 1926.404 · Ground-fault protection on job sites

29 CFR 1926.453 · Aerial lifts

29 CFR 1926.760 · Fall protection

Other prefabricated metal building and component manufacturing employers in Florida

Alert subscribers get notified of each newly cited employer in Florida the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.