OSHA SearchOSHA records by employer

Tube Methods, Inc.: OSHA inspections and violations

Bridgeport, Pennsylvania · Iron and Steel Pipe and Tube Manufacturing from Purchased Steel · NAICS 331210

12inspections
38citation items
$18,078current penalties
Dec 20, 2017last inspection

OSHA has inspected Tube Methods, Inc. 12 times in Pennsylvania since 1973.

The latest one began on Dec 20, 2017 as a planned inspection, in Bridgeport.

Those inspections ended with 38 citation items: 23 serious and 15 other-than-serious.

Penalties were first proposed at $28,625 and now stand at $18,078, 37% lower after settlements or reviews.

Noise comes up most often in these citations: 7 items under 1910.95.

How that compares: the median penalty per cited inspection for manufacturing employers since 2015 is $3,600, and Tube Methods, Inc. averages $3,982 (2 cited inspections).

Tube Methods, Inc. also files yearly injury logs with OSHA, summarized below.

It reported 2 severe injuries to OSHA since 2015.

Tube Methods, Inc.: OSHA citation items per year, 1973 to 2017
Citation items per year, by inspection date.

Pennsylvania · latest 90 days of OSHA records

297employers cited

Get notified the morning OSHA posts each new citation in Pennsylvania: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Pennsylvania

Checking a subcontractor, a client or your own company? Watch Tube Methods, Inc. and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 342843919 OPENED DEC 20, 2017Closed

Planned · Complete · Health · 150 employees at the site · Closed Dec 26, 2018

416 Depot Street, Bridgeport, PA 19405 · Iron and Steel Pipe and Tube Manufacturing from Purchased Steel · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.134(f)(2) · Respiratory protection
Serious$3,604$1,982Apr 3, 2018Final
Citation 1, item 2
29 CFR 1910.305(b)(1)(ii) · Electrical wiring methods
Serious$3,604$1,982Apr 3, 2018Final
Citation 2, item 1
29 CFR 1904.41(a)(2) · Electronic submission of Employer Identification Number (EIN) and injury and illness records to OSHA
Other-than-serious$0$0Apr 3, 2018Final

Inspection 342025186 OPENED JAN 12, 2017Closed

Referral · Partial · Safety · 150 employees at the site · Closed Apr 21, 2017

416 Depot Street, Bridgeport, PA 19405 · Iron and Steel Pipe and Tube Manufacturing from Purchased Steel · OSHA's record · Phone and website on Google Maps

Incident on Jan 3, 2017: Employee's finger is smashed in machine, is later amputated.

On January 3, 2017, Employee #1 was operating a draw bench machine drawing tubing. While the machine was in retracting motion, the carriage of the draw bench made contact with Employee #1's finger, smashing it. Employee #1 was hospitalized and his finger was surgically amputated.

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1910.215(b)(9) · Grinders and abrasive wheels
Serious$5,541$4,000Mar 28, 2017Final
Citation 1, item 1b
29 CFR 1910.215(d)(3) · Grinders and abrasive wheels
Serious$0$0Mar 28, 2017Final

Inspection 339112880 OPENED JUN 11, 2013Closed

Planned · Complete · Health · 130 employees at the site · Closed Jan 30, 2014

416 Depot Street, Bridgeport, PA 19405 · Iron and Steel Pipe and Tube Manufacturing from Purchased Steel · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1 Serious$4,500$2,678Aug 6, 2013Final

Inspection 337516017 OPENED NOV 15, 2012Closed

Planned · Partial · Safety · 145 employees at the site · Closed Jan 2, 2013

416 Depot Street, Bridgeport, PA 19405 · Iron and Steel Pipe and Tube Manufacturing from Purchased Steel · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.212(a)(1) · Machine guarding
Serious$3,060$2,295Dec 11, 2012Final
Citation 2, item 1
29 CFR 1910.147(c)(6)(i) · Lockout/tagout
Other-than-serious$0$0Dec 11, 2012Final

Inspection 312979131 OPENED MAR 4, 2010Closed

Planned · Partial · Safety · 150 employees at the site · Closed Apr 21, 2010

416 Depot Street, Bridgeport, PA 19405 · Iron and Steel Pipe and Tube Manufacturing from Purchased Steel · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.212(a)(1) · Machine guarding
Serious$825$825Mar 30, 2010Closed
Citation 1, item 2
29 CFR 1910.219(c)(2)(i) · Belts, pulleys and power-transmission parts
Serious$825$825Mar 30, 2010Closed
Citation 1, item 3
29 CFR 1910.242(b) · Hand and power tools
Serious$621$421Mar 30, 2010Closed

Inspection 303721047 OPENED AUG 23, 2001Closed

Complaint · Partial · Health · 112 employees at the site · Closed Oct 29, 2001

416 Depot Street, Bridgeport, PA 19405 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1910.134(c)(2)(i) · Respiratory protection
Serious$975$325Sep 25, 2001Closed
Citation 1, item 1b
29 CFR 1910.134(c)(2)(ii) · Respiratory protection
Serious$0$0Sep 25, 2001Closed

Inspection 303721740 OPENED AUG 23, 2001Closed

Complaint · Partial · Safety · 113 employees at the site · Closed Oct 29, 2001

416 Depot Street, Bridgeport, PA 19405 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1910.303(b)(2) · Electrical equipment, general requirements
Serious$1,100$550Sep 25, 2001Closed
Citation 1, item 1b
29 CFR 1910.305(g)(1)(iii) · Electrical wiring methods
Serious$0$0Sep 25, 2001Closed
Citation 1, item 2
29 CFR 1910.305(b)(2) · Electrical wiring methods
Serious$1,100$550Sep 25, 2001Closed
Citation 1, item 3
29 CFR 1910.305(d) · Electrical wiring methods
Serious$1,100$550Sep 25, 2001Closed

Inspection 122021140 OPENED FEB 8, 1995Closed

Planned · Complete · Safety · 101 employees at the site · Closed Mar 10, 1995

416 Depot Street, Bridgeport, PA 19405 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1910.217(c)(2)(ia) · Mechanical power presses
Serious$675$338Feb 14, 1995Closed
Citation 1, item 1b
29 CFR 1910.217(c)(2)(ib) · Mechanical power presses
Serious$0$0Feb 14, 1995Closed
Citation 1, item 2
29 CFR 1910.213(d)(1) · Woodworking machinery
Serious$675$338Feb 14, 1995Closed
Citation 2, item 1 Other-than-serious$0$0Feb 14, 1995Closed
Citation 2, item 2
29 CFR 1910.106(e)(6)(i) · Flammable liquids
Other-than-serious$0$0Feb 14, 1995Closed
Citation 2, item 3
29 CFR 1910.305(b)(2) · Electrical wiring methods
Other-than-serious$0$0Feb 14, 1995Closed
Citation 2, item 4
29 CFR 1910.147(c)(6)(ii) · Lockout/tagout
Other-than-serious$0$0Feb 14, 1995Closed
Citation 2, item 5
29 CFR 1910.147(c)(7)(iv) · Lockout/tagout
Other-than-serious$0$0Feb 14, 1995Closed
Citation 2, item 6
29 CFR 1910.1200(e)(2) · Hazard communication
Other-than-serious$0$0Feb 14, 1995Closed
4 older inspections

Inspection 861161 OPENED APR 26, 1985Closed

Follow-up · Partial · Health · 16 employees at the site · Closed Oct 21, 1985

Depot & Rambo Streets, Bridgeport, PA 19405 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1 Other-than-serious$0$0Aug 13, 1985Closed

Inspection 12635587 OPENED MAY 18, 1983Closed

Planned · Records only · Safety · 44 employees at the site · Closed May 31, 1983

Rambo & Depot Sts Po Box A, Bridgeport, PA 19405 · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 12719571 OPENED MAY 6, 1982Closed

Planned · Complete · Health · 69 employees at the site · Closed Dec 18, 1985

Depot & Rambo Sts, Bridgeport, PA 19405 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a Serious$350$350Jan 14, 1983Closed
Citation 1, item 1b Serious$0$0Jan 14, 1983Closed
Citation 1, item 1c Serious$0$0Jan 14, 1983Closed
Citation 1, item 1d Serious$0$0Jan 14, 1983Closed
Citation 1, item 1e Serious$0$0Jan 14, 1983Closed
Citation 2, item 1
29 CFR 1910.157(g)(2) · Portable fire extinguishers
Other-than-serious$0$0Jan 14, 1983Closed

Inspection 12699344 OPENED JUN 15, 1973Closed

Planned · Complete · Safety · 74 employees at the site · Closed Mar 10, 1984

Rambo & Depot Streets, Bridgeport, PA 19405 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1 Other-than-serious$0$0Jun 26, 1973Closed
Citation 1, item 2
29 CFR 1910.252(a)(2)(ivc)(0) · Welding fire safety
Other-than-serious$30$30Jun 26, 1973Closed
Citation 1, item 3
29 CFR 1910.145(c)(1) · Specifications for accident prevention signs and tags
Other-than-serious$0$0Jun 26, 1973Closed
Citation 1, item 4
29 CFR 1910.106(e)(6)(ii) · Flammable liquids
Other-than-serious$40$40Jun 26, 1973Closed
Citation 1, item 5
29 CFR 1910.107(f)(4) · Spray painting and finishing
Other-than-serious$0$0Jun 26, 1973Closed

Injury and illness logs

From the Form 300A summaries employers file with OSHA each year. Rate = recordable cases per 100 full-time workers.

In 2025, the Bridgeport site logged 9 recordable injuries or illnesses among about 154 workers: 5.8 per 100 full-time workers, against a median of 3.6 for its industry.

Site and yearWorkersCasesDays-away casesRateIndustry median
Tube Methods, Inc.
Bridgeport · 2025
154 905.83.6

Included with any plan: 8 more yearly logs from these sites, back to 2017, with each site's average rate over its latest three years. Already a subscriber? Sign in.

See plans

Severe injury reports

Employers must report any work-related amputation, in-patient hospitalization or loss of an eye to OSHA within 24 hours. 2 reports on file.

Mar 9, 2018, Bridgeport: Hospitalization · avulsions, enucleations · hand(s) and finger(s)

An employee was performing a plug draw operation on a tube when his finger became stuck between the tube and a wood fixture, removing skin from his hand and finger.

Jan 3, 2017, Bridgeport: Hospitalization, amputation · amputations · finger(s), fingernail(s), unspecified

An employee's left index finger was pinched by a plow on a draw bench, requiring medical amputation.

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1904.41 · Electronic submission of Employer Identification Number (EIN) and injury and illness records to OSHA

29 CFR 1904.41(a)(2)

(2) Annual electronic submission of information from OSHA Form 300 Log of Work-Related Injuries and Illnesses and OSHA Form 301 Injury and Illness Incident Report by establishments with 100 or more employees in designated industries. If your establishment had 100 or more employees at any time during the previous calendar year, and your establishment is classified in an industry listed in appendix B to subpart E of this part, then you must electronically submit information from OSHA Forms 300 and 301 to OSHA or OSHA's designee. You must submit the information once a year, no later than the date listed in paragraph (c) of this section of the year after the calendar year covered by the forms.

29 CFR 1910.106 · Flammable liquids

29 CFR 1910.106(e)(6)(i)

(6) Sources of ignition—(i) General. Adequate precautions shall be taken to prevent the ignition of flammable vapors. Sources of ignition include but are not limited to open flames; lightning; smoking; cutting and welding; hot surfaces; frictional heat; static, electrical, and mechanical sparks; spontaneous ignition, including heat-producing chemical reactions; and radiant heat.

29 CFR 1910.106(e)(6)(ii)

(ii) Grounding. Category 1 or 2 flammable liquids, or Category 3 flammable liquids with a flashpoint below 100 °F (37.8 °C), shall not be dispensed into containers unless the nozzle and container are electrically interconnected. Where the metallic floorplate on which the container stands while filling is electrically connected to the fill stem or where the fill stem is bonded to the container during filling operations by means of a bond wire, the provisions of this section shall be deemed to have been complied with.

29 CFR 1910.107 · Spray painting and finishing

29 CFR 1910.1200 · Hazard communication

29 CFR 1910.134 · Respiratory protection

29 CFR 1910.145 · Specifications for accident prevention signs and tags

29 CFR 1910.147 · Lockout/tagout

29 CFR 1910.157 · Portable fire extinguishers

29 CFR 1910.184 · Slings

29 CFR 1910.212 · Machine guarding

29 CFR 1910.213 · Woodworking machinery

29 CFR 1910.215 · Grinders and abrasive wheels

29 CFR 1910.217 · Mechanical power presses

29 CFR 1910.219 · Belts, pulleys and power-transmission parts

29 CFR 1910.242 · Hand and power tools

29 CFR 1910.252 · Welding fire safety

29 CFR 1910.303 · Electrical equipment, general requirements

29 CFR 1910.305 · Electrical wiring methods

29 CFR 1910.309

29 CFR 1910.95 · Noise

Other iron and steel pipe and tube manufacturing from purchased steel employers in Pennsylvania

Alert subscribers get notified of each newly cited employer in Pennsylvania the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.