OSHA SearchOSHA records by employer

Voyager Industries Inc: OSHA inspections and violations

Pine River, Minnesota · Travel Trailer and Camper Manufacturing · NAICS 336214

1inspections
11citation items
$10,200current penalties
Sep 18, 2024last inspection

OSHA inspectors have visited Voyager Industries Inc in Minnesota one time.

It opened on Sep 18, 2024 as a planned inspection, in Pine River.

In all, OSHA issued 11 citation items: 8 serious and 3 other-than-serious.

The penalties, $10,200 in total, stand where OSHA first set them.

The rule cited most here is 1910.107 (spray painting and finishing), 6 times.

Among manufacturing employers, the typical cited inspection since 2015 ends with a $3,600 penalty. Voyager Industries Inc averages $10,200 across 1 cited inspection.

Voyager Industries Inc also files yearly injury logs with OSHA, summarized below.

Voyager Industries Inc: OSHA citation items per year, 2024 to 2024
Citation items per year, by inspection date.

Minnesota · latest 90 days of OSHA records

375employers cited

Get notified the morning OSHA posts each new citation in Minnesota: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Minnesota

Checking a subcontractor, a client or your own company? Watch Voyager Industries Inc and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 347766198 OPENED SEP 18, 2024Closed

Planned · Complete · Safety · 14 employees at the site · Closed Dec 20, 2024

708 Front St, Pine River, MN 56474 · Travel Trailer and Camper Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.107(b)(1) · Spray painting and finishing
Serious$900$900Oct 16, 2024Final
Citation 1, item 2
29 CFR 1910.107(b)(2) · Spray painting and finishing
Serious$900$900Oct 16, 2024Final
Citation 1, item 3
29 CFR 1910.107(b)(5)(iv) · Spray painting and finishing
Serious$900$900Oct 16, 2024Final
Citation 1, item 4
29 CFR 1910.107(e)(2) · Spray painting and finishing
Serious$900$900Oct 16, 2024Final
Citation 1, item 5
29 CFR 1910.134(a)(2) · Respiratory protection
Serious$900$900Oct 16, 2024Final
Citation 1, item 6
29 CFR 1910.213(c)(1) · Woodworking machinery
Serious$1,200$1,200Oct 16, 2024Final
Citation 1, item 7
29 CFR 1910.213(c)(3) · Woodworking machinery
Serious$1,800$1,800Oct 16, 2024Final
Citation 1, item 8
29 CFR 1910.307(c) · Hazardous (classified) locations
Serious$1,500$1,500Oct 16, 2024Final
Citation 2, item 1
29 CFR 1910.107(b)(5)(i) · Spray painting and finishing
Other-than-serious$300$300Oct 16, 2024Final
Citation 2, item 2
29 CFR 1910.107(b)(9) · Spray painting and finishing
Other-than-serious$300$300Oct 16, 2024Final
Citation 2, item 3 Other-than-serious$600$600Oct 16, 2024Final

Injury and illness logs

From the Form 300A summaries employers file with OSHA each year. Rate = recordable cases per 100 full-time workers.

In 2025, the Pine River site logged 0 recordable injuries or illnesses among about 15 workers: 0.0 per 100 full-time workers, against a median of 5.2 for its industry.

Site and yearWorkersCasesDays-away casesRateIndustry median
Voyager Industries, Inc.- Pine River
Pine River · 2025
15 000.05.2

Included with any plan: 3 more yearly logs from these sites, back to 2022, with each site's average rate over its latest three years. Already a subscriber? Sign in.

See plans

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.107 · Spray painting and finishing

29 CFR 1910.107(b)(1)

(b) Spray booths—(1) Construction. Spray booths shall be substantially constructed of steel, securely and rigidly supported, or of concrete or masonry except that aluminum or other substantial noncombustible material may be used for intermittent or low volume spraying. Spray booths shall be designed to sweep air currents toward the exhaust outlet.

29 CFR 1910.107(b)(2)

(2) Interiors. The interior surfaces of spray booths shall be smooth and continuous without edges and otherwise designed to prevent pocketing of residues and facilitate cleaning and washing without injury.

29 CFR 1910.107(b)(5)(i)

(i) The spraying operations except electrostatic spraying operations shall be so designed, installed and maintained that the average air velocity over the open face of the booth (or booth cross section during spraying operations) shall be not less than 100 linear feet per minute. Electrostatic spraying operations may be conducted with an air velocity over the open face of the booth of not less than 60 linear feet per minute, or more, depending on the volume of the finishing material being applied and its flammability and explosion characteristics. Visible gauges or audible alarm or pressure activated devices shall be installed to indicate or insure that the required air velocity is maintained. Filter rolls shall be inspected to insure proper replacement of filter media.

29 CFR 1910.134 · Respiratory protection

29 CFR 1910.213 · Woodworking machinery

29 CFR 1910.307 · Hazardous (classified) locations

29 CFR 5206.700

Other travel trailer and camper manufacturing employers in Minnesota

Alert subscribers get notified of each newly cited employer in Minnesota the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.