Wallis Corporation: OSHA inspections and violations
Kalispell, Montana · Other Concrete Product Manufacturing · NAICS 327390
3inspections
9citation items
$29,105current penalties
May 6, 2025last inspection
OSHA has inspected Wallis Corporation 3 times in Montana since 2022.
The latest one began on May 6, 2025 on a referral, in Kalispell.
Those inspections ended with 9 citation items: 3 serious and 6 other-than-serious.
Penalties were first proposed at $29,793 and now stand at $29,105, 2% lower after settlements or reviews.
Overhead and gantry cranes comes up most often in these citations: 6 items under 1910.179.
How that compares: the median penalty per cited inspection for manufacturing employers since 2015 is $4,500, and Wallis Corporation averages $14,552 (2 cited inspections).
Wallis Corporation also files yearly injury logs with OSHA, summarized below.
It reported 2 severe injuries to OSHA since 2015.
Citation items per year, by inspection date.
Montana · latest 90 days of OSHA records
26employers cited
Get notified the morning OSHA posts each new citation in Montana: the employer, the site address, the rules broken and the penalty.
From the Form 300A summaries employers file with OSHA each year. Rate = recordable cases per 100 full-time workers.
In 2024, the Kalispell site logged 4 recordable injuries or illnesses among about 45 workers: 11.0 per 100 full-time workers, against a median of 3.4 for its industry.
Site and year
Workers
Cases
Days-away cases
Rate
Industry median
Wallis Corp
Kalispell · 2024
45
4
0
11.0
3.4
Severe injury reports
Employers must report any work-related amputation, in-patient hospitalization or loss of an eye to OSHA within 24 hours. 2 reports on file.
May 1, 2025, Kalispell: Hospitalization · fractures · pelvis
An employee was forming a light pole foundation when a cable anchor failed, causing the concrete form to fall and pin the employee between the form and the wall. The employee was hospitalized with a fractured pelvis.
Aug 2, 2023, Kalispell: Hospitalization · fractures and other injuries, n.e.c. · multiple body parts, n.e.c.
An employee was assisting a co-worker to remove an inner form. The injured employee got on his hands and knees and started to chip away at the concrete. When the pressure was removed, the 1,100-pound concrete product fell out of the form and landed on the employee. He sustained fractures to the spine and shoulder blade as well as a collapsed lung and a spleen injury.
The rules behind these citations
Current text from the Code of Federal Regulations. Some citations were issued under older wording.
(5) Rated load marking. The rated load of the crane shall be plainly marked on each side of the crane, and if the crane has more than one hoisting unit, each hoist shall have its rated load marked on it or its load block and this marking shall be clearly legible from the ground or floor.
29 CFR 1910.179(g)(1)(v)
(v) Pendant control boxes shall be constructed to prevent electrical shock and shall be clearly marked for identification of functions.
29 CFR 1910.179(i)
(h) Hoisting equipment—(1) Sheaves. (i) Sheave grooves shall be smooth and free from surface defects which could cause rope damage.
Alert subscribers get notified of each newly cited employer in Montana the morning it is posted. See the alert plans.
Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.