OSHA SearchOSHA records by employer

White Line Construction, Inc: OSHA inspections and violations

Fredericksburg, Virginia · Structural Steel and Precast Concrete Contractors · NAICS 238120

3inspections
8citation items
$8,015current penalties
Apr 25, 2017last inspection

Since 2007, OSHA inspectors have visited White Line Construction, Inc in Virginia 3 times.

The most recent inspection opened on Apr 25, 2017 after a complaint, in Manassas Park.

In all, OSHA issued 8 citation items: 8 serious.

The proposed penalties came to $9,450; today they stand at $8,015, 15% less.

The rule cited most here is 1910.107 (spray painting and finishing), 3 times.

Among construction employers, the typical cited inspection since 2015 ends with a $3,080 penalty. White Line Construction, Inc averages $5,740 across 1 cited inspection.

White Line Construction, Inc also files yearly injury logs with OSHA, summarized below.

White Line Construction, Inc: OSHA citation items per year, 2007 to 2017
Citation items per year, by inspection date.

Virginia · latest 90 days of OSHA records

248employers cited

5 of them in the same industry

Get notified the morning OSHA posts each new citation in Virginia: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Virginia

Checking a subcontractor, a client or your own company? Watch White Line Construction, Inc and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 342323920 OPENED APR 25, 2017Closed

Complaint · Partial · Health · 18 employees at the site · Closed Dec 14, 2017

9199 Enterprise Court, Manassas Park, VA 20111 · Structural Steel and Precast Concrete Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.94(a)(7) · Ventilation
Serious$1,995$1,596Oct 20, 2017Final
Citation 1, item 2a
29 CFR 1910.107(b)(5)(i) · Spray painting and finishing
Serious$3,500$2,800Oct 20, 2017Final
Citation 1, item 2b
29 CFR 1910.107(i)(4) · Spray painting and finishing
Serious$0$0Oct 20, 2017Final
Citation 1, item 2d
29 CFR 1910.107(l)(4)(i) · Spray painting and finishing
Serious$0$0Oct 20, 2017Final
Citation 1, item 3
29 CFR 1910.134(d)(1)(iii) · Respiratory protection
Serious$1,680$1,344Oct 20, 2017Final

Inspection 316654730 OPENED SEP 5, 2012Closed

Planned · Partial · Safety · 6 employees at the site · Closed Oct 5, 2012

7801 Garner Drive, Manassas, VA 20109 · Structural Steel and Precast Concrete Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR FPSE07603003
Serious$1,225$1,225Sep 24, 2012Closed

Inspection 311164768 OPENED JUN 25, 2007Closed

Planned · Partial · Safety · 7 employees at the site · Closed Sep 10, 2007

3300 Beulah Salisbury Drive, Fredericksburg, VA 22408 · All Other Specialty Trade Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.50(c) · Medical services and first aid
Serious$525$525Jul 23, 2007Closed
Citation 1, item 2
29 CFR 1926.351(b)(2) · Arc welding and cutting
Serious$525$525Jul 23, 2007Closed

Injury and illness logs

From the Form 300A summaries employers file with OSHA each year. Rate = recordable cases per 100 full-time workers.

In 2016, the Manassas site logged 1 recordable injury or illness among about 30 workers: 3.2 per 100 full-time workers, against a median of 0.6 for its industry. Those cases cost 186 days away from work.

Site and yearWorkersCasesDays-away casesRateIndustry median
Godwin Drive
Manassas · 2016
30 113.20.6
Steel Shop
Manassas Park · 2016
19 000.00.6

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.107 · Spray painting and finishing

29 CFR 1910.107(b)(5)(i)

(i) The spraying operations except electrostatic spraying operations shall be so designed, installed and maintained that the average air velocity over the open face of the booth (or booth cross section during spraying operations) shall be not less than 100 linear feet per minute. Electrostatic spraying operations may be conducted with an air velocity over the open face of the booth of not less than 60 linear feet per minute, or more, depending on the volume of the finishing material being applied and its flammability and explosion characteristics. Visible gauges or audible alarm or pressure activated devices shall be installed to indicate or insure that the required air velocity is maintained. Filter rolls shall be inspected to insure proper replacement of filter media.

29 CFR 1910.107(i)(4)

(4) Electrical support equipment. Transformers, powerpacks, control apparatus, and all other electrical portions of the equipment, with the exception of the handgun itself and its connections to the power supply shall be located outside of the spraying area or shall otherwise conform to the requirements of paragraph (c) of this section.

29 CFR 1910.107(l)(4)(i)

(4) Operation and maintenance. (i) All areas shall be kept free of the accumulation of powder coating dusts, particularly such horizontal surfaces as ledges, beams, pipes, hoods, booths, and floors.

29 CFR 1910.134 · Respiratory protection

29 CFR 1910.94 · Ventilation

29 CFR 1926.351 · Arc welding and cutting

29 CFR 1926.50 · Medical services and first aid

Other structural steel and precast concrete contractors employers in Virginia

Alert subscribers get notified of each newly cited employer in Virginia the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.