Inspection 342935186 OPENED FEB 6, 2018Closed
255 Cr 3222, Jacksonville, TX 75766 · Wood Container and Pallet Manufacturing · OSHA's record · Phone and website on Google Maps
Incident on Nov 16, 2017: Employee is injured when foot is run over by forklift
At 11:00 a.m. on November 16, 2017, an employee was offered a ride on a Toyota forklift by a coworker. As the coworker turned the forklift around, he ran over the employee's foot. The employee sustained multiple fractures in his foot, including his femur and tibia on the same side. The employee was hospitalized and received treatment.
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1910.37(b)(2) · Exit routes |
Serious | $3,696 | $0 | May 10, 2018 | Final |
| Citation 1, item 2 29 CFR 1910.133(a)(3) · Eye and face protection |
Serious | $2,956 | $2,000 | May 10, 2018 | Final |
| Citation 1, item 3 29 CFR 1910.147(c)(1) · Lockout/tagout |
Serious | $5,174 | $4,000 | May 10, 2018 | Final |
| Citation 1, item 4 29 CFR 1910.176(b) · Material storage and aisles |
Serious | $5,174 | $3,000 | May 10, 2018 | Final |
| Citation 1, item 5 29 CFR 1910.178(l)(1)(ii) · Forklifts and other powered industrial trucks |
Serious | $2,956 | $3,000 | May 10, 2018 | Final |
| Citation 1, item 6 29 CFR 1910.178(m)(3) · Forklifts and other powered industrial trucks |
Serious | $4,434 | $0 | May 10, 2018 | Final |
| Citation 1, item 7 29 CFR 1910.212(a)(3)(ii) · Machine guarding |
Serious | $3,696 | $2,500 | May 10, 2018 | Final |
| Citation 1, item 8a 29 CFR 1910.219(d)(1) · Belts, pulleys and power-transmission parts |
Serious | $2,956 | $2,000 | May 10, 2018 | Final |
| Citation 1, item 8b 29 CFR 1910.219(e)(1)(i) · Belts, pulleys and power-transmission parts |
Serious | $0 | $0 | May 10, 2018 | Final |
| Citation 1, item 8c 29 CFR 1910.219(e)(3)(i) · Belts, pulleys and power-transmission parts |
Serious | $0 | $0 | May 10, 2018 | Final |
| Citation 1, item 9 29 CFR 1910.242(b) · Hand and power tools |
Serious | $2,956 | $1,500 | May 10, 2018 | Final |
| Citation 1, item 10a 29 CFR 1910.303(c)(3)(i) · Electrical equipment, general requirements |
Serious | $3,696 | $6,000 | May 10, 2018 | Final |
| Citation 1, item 10b 29 CFR 1910.305(b)(2)(i) · Electrical wiring methods |
Serious | $0 | $0 | May 10, 2018 | Final |
| Citation 1, item 11 29 CFR 1910.303(f)(2) · Electrical equipment, general requirements |
Serious | $2,956 | $0 | May 10, 2018 | Final |
| Citation 1, item 12 29 CFR 1910.305(b)(1)(i) · Electrical wiring methods |
Serious | $9,239 | $0 | May 10, 2018 | Final |
| Citation 1, item 13 29 CFR 1910.305(g)(1)(iv)(a) · Electrical wiring methods |
Serious | $2,956 | $0 | May 10, 2018 | Final |
| Citation 2, item 1 29 CFR 1910.134(k)(6) · Respiratory protection |
Other-than-serious | $415 | $0 | May 10, 2018 | Final |
| Citation 2, item 2 29 CFR 1910.157(e)(3) · Portable fire extinguishers |
Other-than-serious | $415 | $0 | May 10, 2018 | Final |