OSHA SearchOSHA records by employer

Beehive Pipe Products LLC: OSHA inspections and violations

Sandy, Utah · Plumbing and Heating Equipment and Supplies (Hydronics) Merchant Wholesalers · NAICS 423720

1inspections
21citation items
$6,250current penalties
Aug 30, 2017last inspection

OSHA inspectors have visited Beehive Pipe Products LLC in Utah one time.

It opened on Aug 30, 2017 after a complaint, in Sandy.

In all, OSHA issued 21 citation items: 21 serious.

The proposed penalties came to $12,500; today they stand at $6,250, 50% less.

The rule cited most here is 1910.147 (lockout/tagout), 4 times.

Among wholesale employers, the typical cited inspection since 2015 ends with a $3,425 penalty. Beehive Pipe Products LLC averages $6,250 across 1 cited inspection.

Beehive Pipe Products LLC: OSHA citation items per year, 2017 to 2017
Citation items per year, by inspection date.

Utah · latest 90 days of OSHA records

67employers cited

Get notified the morning OSHA posts each new citation in Utah: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Utah

Checking a subcontractor, a client or your own company? Watch Beehive Pipe Products LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 342598869 OPENED AUG 30, 2017Closed

Complaint · Partial · Safety · 35 employees at the site · Closed Nov 17, 2017

9220 South 300 West, Sandy, UT 84070 · Plumbing and Heating Equipment and Supplies (Hydronics) Merchant Wholesalers · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR UAC R614-5-2.C.1
Serious$2,500$1,250Oct 3, 2017Final
Citation 1, item 2a
29 CFR UCA 34A-6-201(1)(A)
Serious$2,500$1,250Oct 3, 2017Final
Citation 1, item 2b
29 CFR 1910.178(a)(4) · Forklifts and other powered industrial trucks
Serious$0$0Oct 3, 2017Final
Citation 1, item 2c
29 CFR 1910.178(l)(4)(iii) · Forklifts and other powered industrial trucks
Serious$0$0Oct 3, 2017Final
Citation 1, item 2d
29 CFR 1910.178(p)(1) · Forklifts and other powered industrial trucks
Serious$0$0Oct 3, 2017Final
Citation 1, item 3a
29 CFR 1910.147(c)(2)(ii) · Lockout/tagout
Serious$2,500$1,250Oct 3, 2017Final
Citation 1, item 3b
29 CFR 1910.147(c)(5)(i) · Lockout/tagout
Serious$0$0Oct 3, 2017Final
Citation 1, item 3c
29 CFR 1910.147(c)(6)(i) · Lockout/tagout
Serious$0$0Oct 3, 2017Final
Citation 1, item 3d
29 CFR 1910.147(c)(7)(i) · Lockout/tagout
Serious$0$0Oct 3, 2017Final
Citation 1, item 4a
29 CFR 1910.212(a)(1) · Machine guarding
Serious$2,500$1,250Oct 3, 2017Final
Citation 1, item 4b
29 CFR 1910.212(b) · Machine guarding
Serious$0$0Oct 3, 2017Final
Citation 1, item 4c
29 CFR 1910.215(a)(1) · Grinders and abrasive wheels
Serious$0$0Oct 3, 2017Final
Citation 1, item 4d
29 CFR 1910.215(a)(2) · Grinders and abrasive wheels
Serious$0$0Oct 3, 2017Final
Citation 1, item 4e
29 CFR 1910.215(a)(4) · Grinders and abrasive wheels
Serious$0$0Oct 3, 2017Final
Citation 1, item 4f
29 CFR 1910.219(d)(1) · Belts, pulleys and power-transmission parts
Serious$0$0Oct 3, 2017Final
Citation 1, item 4g
29 CFR 1910.219(e)(3)(i) · Belts, pulleys and power-transmission parts
Serious$0$0Oct 3, 2017Final
Citation 1, item 5a
29 CFR 1910.303(f)(2) · Electrical equipment, general requirements
Serious$2,500$1,250Oct 3, 2017Final
Citation 1, item 5b
29 CFR 1910.303(g)(1) · Electrical equipment, general requirements
Serious$0$0Oct 3, 2017Final
Citation 1, item 5c
29 CFR 1910.305(b)(1)(ii) · Electrical wiring methods
Serious$0$0Oct 3, 2017Final
Citation 1, item 5d
29 CFR 1910.305(b)(2)(i) · Electrical wiring methods
Serious$0$0Oct 3, 2017Final
Citation 1, item 5e
29 CFR 1910.305(j)(1)(i) · Electrical wiring methods
Serious$0$0Oct 3, 2017Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.147 · Lockout/tagout

29 CFR 1910.147(c)(2)(ii)

(ii) If an energy isolating device is capable of being locked out, the employer's energy control program under paragraph (c)(1) of this section shall utilize lockout, unless the employer can demonstrate that the utilization of a tagout system will provide full employee protection as set forth in paragraph (c)(3) of this section.

29 CFR 1910.147(c)(5)(i)

(5) Protective materials and hardware. (i) Locks, tags, chains, wedges, key blocks, adapter pins, self-locking fasteners, or other hardware shall be provided by the employer for isolating, securing or blocking of machines or equipment from energy sources.

29 CFR 1910.147(c)(6)(i)

(6) Periodic inspection. (i) The employer shall conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirements of this standard are being followed.

29 CFR 1910.178 · Forklifts and other powered industrial trucks

29 CFR 1910.212 · Machine guarding

29 CFR 1910.215 · Grinders and abrasive wheels

29 CFR 1910.219 · Belts, pulleys and power-transmission parts

29 CFR 1910.303 · Electrical equipment, general requirements

29 CFR 1910.305 · Electrical wiring methods

Other plumbing and heating equipment and supplies (hydronics) merchant wholesalers employers in Utah

Alert subscribers get notified of each newly cited employer in Utah the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.