OSHA SearchOSHA records by employer

Biewer-Wisconsin Sawmill, Inc.: OSHA inspections and violations

Prentice, Wisconsin · Sawmills · NAICS 321113

16inspections
78citation items
$133,695current penalties
Jun 24, 2025last inspection

Since 1990, OSHA inspectors have visited Biewer-Wisconsin Sawmill, Inc. in Wisconsin 16 times.

The most recent inspection opened on Jun 24, 2025 on a referral, in Prentice.

In all, OSHA issued 78 citation items: 55 serious, 10 repeat and 13 other-than-serious.

The proposed penalties came to $175,268; today they stand at $133,695, 24% less.

The rule cited most here is 1910.147 (lockout/tagout), 26 times.

Among manufacturing employers, the typical cited inspection since 2015 ends with a $4,500 penalty. Biewer-Wisconsin Sawmill, Inc. averages $20,685 across 5 cited inspections.

Biewer-Wisconsin Sawmill, Inc. also files yearly injury logs with OSHA, summarized below.

It reported 6 severe injuries to OSHA since 2015.

Biewer-Wisconsin Sawmill, Inc.: OSHA citation items per year, 1990 to 2025
Citation items per year, by inspection date.

Wisconsin · latest 90 days of OSHA records

214employers cited

2 of them in the same industry

Get notified the morning OSHA posts each new citation in Wisconsin: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Wisconsin

Checking a subcontractor, a client or your own company? Watch Biewer-Wisconsin Sawmill, Inc. and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 348334343 OPENED JUN 24, 2025Closed

Referral · Partial · Safety · 125 employees at the site · Closed Sep 8, 2025

400 Red Pine Court, Prentice, WI 54556 · Sawmills · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.22(a)(3) · Walking-working surfaces
Serious$5,426$3,798Aug 1, 2025Final
Citation 1, item 2
29 CFR 1910.28(b)(1)(i) · Fall protection in general industry
Serious$14,895$10,426Aug 1, 2025Final

Inspection 343465969 OPENED SEP 14, 2018Closed

Referral · Partial · Safety · 100 employees at the site · Closed Mar 13, 2019

400 Red Pine Court, Prentice, WI 54556 · Sawmills · OSHA's record · Phone and website on Google Maps

Incident on Sep 5, 2018: Employee catches hand between motor belt and pulley, fractur

At 9:15 a.m. on September 5, 2018, an employee was reinstalling a drive motor belt for the number 2 pressure roller on an edger that had fallen off of its drive sprockets. The employee was rolling the drive motor belt onto the drive sprocket when the pulley unexpectedly moved and pulled his hand in between the belt and sprocket. The employee sustained a fractured thumb, lacerated his palm and the back of his hand, and abrasions on his index, middle finger, and ring finger. The employee was hospitalized.

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1 Serious$10,210$8,680Feb 12, 2019Final
Citation 2, item 1
29 CFR 1910.147(d)(4)(i) · Lockout/tagout
Repeat$14,587$12,400Feb 12, 2019Final

Inspection 343466322 OPENED SEP 14, 2018Closed

Referral · Partial · Safety · 100 employees at the site · Closed Apr 2, 2019

400 Red Pine Court, Prentice, WI 54556 · Sawmills · OSHA's record · Phone and website on Google Maps

Incident on Sep 13, 2018: Employee amputates hand when struck by spline remover head

At 11:00 p.m. on September 13, 2018, an employee was clearing a blocked photo eye on the spline remover and entered the guardrail while the remover was running and other equipment was not isolated or locked out. The employee's right hand came into contact with the remover head and was amputated at the wrist. The employee was hospitalized.

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.147(c)(5)(i) · Lockout/tagout
Serious$10,210$8,680Feb 15, 2019Final
Citation 1, item 2 Serious$7,293$6,200Feb 15, 2019Final
Citation 1, item 3 Serious$5,834$4,956Feb 15, 2019Final
Citation 2, item 1
29 CFR 1910.147(d)(3) · Lockout/tagout
Repeat$20,420$17,357Feb 15, 2019Final
Citation 2, item 2
29 CFR 1910.147(d)(4)(i) · Lockout/tagout
Repeat$20,420$17,357Feb 15, 2019Final
Citation 3, item 1
29 CFR 1910.1030(c)(2)(i)(b) · Bloodborne pathogens
Other-than-serious$0$0Feb 15, 2019Final

Inspection 342381266 OPENED JUN 6, 2017Closed

Referral · Partial · Safety · 95 employees at the site · Closed Dec 5, 2017

400 Red Pine Court, Prentice, WI 54556 · Sawmills · OSHA's record · Phone and website on Google Maps

Incident on May 25, 2017: Employee sustains fractures and partial amputation of finger

At 6:30 a.m. on May 25, 2017, an edger operator in-training was adjusting the position of a board on in-feed side of an edger's conveyor chain. The employee's fingertip was caught between the feed stock material and a pressure in-feed roller. The employee reached into the clamping/in-feed roller area of the edger without using the companies alternative safety procedure for adjusting the position of a skewed boards on the in-feed side of the edger and did not lockout the edger and related in-feed conveyor equipment. The employee sustained fractures and partial amputation of right ring finger to the first knuckle. the first knuckle.

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1910.147(c)(4)(i) · Lockout/tagout
Serious$12,675$10,140Nov 7, 2017Final
Citation 1, item 1b
29 CFR 1910.147(d)(3) · Lockout/tagout
Serious$0$0Nov 7, 2017Final
Citation 1, item 1c
29 CFR 1910.147(d)(4)(i) · Lockout/tagout
Serious$0$0Nov 7, 2017Final
Citation 1, item 1d
29 CFR 1910.212(a)(1) · Machine guarding
Serious$0$0Nov 7, 2017Final

Inspection 342097524 OPENED FEB 10, 2017Closed

Complaint · Partial · Health · 90 employees at the site · Closed Mar 17, 2017

400 Red Pine Court, Prentice, WI 54556 · Sawmills · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 340506724 OPENED APR 1, 2015Closed

Referral · Partial · Safety · 98 employees at the site · Closed Aug 26, 2015

400 Red Pine Court, Prentice, WI 54556 · Sawmills · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.212(a)(1) · Machine guarding
Serious$4,900$3,430Aug 10, 2015Final
Citation 2, item 1
29 CFR 1910.137(b)(2)(viii) · Electrical protective equipment
Other-than-serious$0$0Aug 10, 2015Final

Inspection 313180093 OPENED MAR 14, 2011Closed

Planned · Partial · Safety · 85 employees at the site · Closed Jul 12, 2011

400 Red Pine Court, Prentice, WI 54556 · Sawmills · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.22(a)(1) · General requirements
Serious$3,750$2,625Jun 21, 2011Closed
Citation 1, item 2
29 CFR 1910.147(c)(4)(iib) · Lockout/tagout
Serious$3,750$2,625Jun 21, 2011Closed
Citation 1, item 3 Serious$3,750$2,625Jun 21, 2011Closed

Inspection 300253887 OPENED JUL 1, 2003Closed

Planned · Complete · Safety · 98 employees at the site · Closed Jul 31, 2003

400 Red Pine Court, Prentice, WI 54556 · Sawmills · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1910.215(a)(1) · Grinders and abrasive wheels
Serious$1,275$893Jul 22, 2003Closed
Citation 1, item 1b
29 CFR 1910.215(b)(9) · Grinders and abrasive wheels
Serious$0$0Jul 22, 2003Closed
Citation 1, item 2a
29 CFR 1910.303(b)(1) · Electrical equipment, general requirements
Serious$1,275$892Jul 22, 2003Closed
Citation 1, item 2b
29 CFR 1910.305(b)(1) · Electrical wiring methods
Serious$0$0Jul 22, 2003Closed
Citation 2, item 1
29 CFR 1910.1030(g)(2)(iic) · Bloodborne pathogens
Other-than-serious$0$0Jul 22, 2003Closed
8 older inspections

Inspection 300249745 OPENED JUL 12, 2000Closed

Complaint · Partial · Safety · 94 employees at the site · Closed Oct 5, 2000

400 Red Pine Court, Prentice, WI 54556 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.23(c)(1) · Guarding floor and wall openings and holes
Serious$900$540Sep 21, 2000Closed
Citation 1, item 2a
29 CFR 1910.147(c)(7)(i) · Lockout/tagout
Serious$3,000$1,800Sep 21, 2000Closed
Citation 1, item 2b
29 CFR 1910.147(d)(6) · Lockout/tagout
Serious$0$0Sep 21, 2000Closed
Citation 1, item 2c
29 CFR 1910.147(f)(3)(i) · Lockout/tagout
Serious$0$0Sep 21, 2000Closed
Citation 1, item 2d Serious$0$0Sep 21, 2000Closed

Inspection 106053606 OPENED JUN 29, 1999Closed

Planned · Complete · Safety · 98 employees at the site · Closed Jan 3, 2000

400 Red Pine Court, Prentice, WI 54556 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.179(d)(3) · Overhead and gantry cranes
Serious$1,125$675Jul 2, 1999Closed
Citation 1, item 2a
29 CFR 1910.304(f)(4) · Grounding and circuit protection
Serious$573$345Jul 2, 1999Closed
Citation 1, item 2b
29 CFR 1910.305(a)(2)(iiig) · Electrical wiring methods
Serious$0$0Jul 2, 1999Closed
Citation 2, item 1
29 CFR 1910.1200(f)(5)(i) · Hazard communication
Repeat$120$75Jul 2, 1999Closed
Citation 3, item 1
29 CFR 1910.177(c)(1) · Servicing multi-piece and single piece rim wheels
Other-than-serious$0$0Jul 2, 1999Closed
Citation 3, item 2
29 CFR 1910.178(p)(1) · Forklifts and other powered industrial trucks
Other-than-serious$0$0Jul 2, 1999Closed
Citation 3, item 3 Other-than-serious$0$0Jul 2, 1999Closed

Inspection 106052327 OPENED JUN 24, 1997Closed

Complaint · Partial · Safety · 79 employees at the site · Closed Oct 6, 1997

400 Red Pine Court, Prentice, WI 54556 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.23(a)(5) · Guarding floor and wall openings and holes
Serious$750$375Jul 3, 1997Closed
Citation 1, item 2
29 CFR 1910.147(c)(1) · Lockout/tagout
Serious$1,250$625Jul 3, 1997Closed
Citation 1, item 3a
29 CFR 1910.147(c)(5)(i) · Lockout/tagout
Serious$1,250$625Jul 3, 1997Closed
Citation 1, item 3b
29 CFR 1910.147(f)(3)(i) · Lockout/tagout
Serious$0$0Jul 3, 1997Closed
Citation 1, item 4
29 CFR 1910.147(c)(6)(i) · Lockout/tagout
Serious$1,250$625Jul 3, 1997Closed
Citation 1, item 5 Serious$1,000$500Jul 3, 1997Closed
Citation 1, item 6
29 CFR 1910.333(a) · Working near live electrical parts
Serious$1,000$500Jul 3, 1997Closed
Citation 2, item 1
29 CFR 1910.179(j)(1)(ii) · Overhead and gantry cranes
Other-than-serious$0$0Jul 3, 1997Closed
Citation 2, item 2 Other-than-serious$0$0Jul 3, 1997Closed
Citation 2, item 3
29 CFR 1910.1200(f)(5)(i) · Hazard communication
Other-than-serious$0$0Jul 3, 1997Closed

Inspection 106045917 OPENED OCT 19, 1993Closed

Planned · Complete · Safety · 60 employees at the site · Closed Nov 26, 1993

400 Red Pine Court, Prentice, WI 54556 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.146(c)(1) · Permit-required confined spaces
Serious$2,500$1,500Oct 22, 1993Closed
Citation 1, item 2 Serious$5,000$3,000Oct 22, 1993Closed
Citation 1, item 3
29 CFR 1910.304(f)(4) · Grounding and circuit protection
Other-than-serious$2,000$0Oct 22, 1993Closed
Citation 2, item 1
29 CFR 1904.5(c) · Determination of work-relatedness
Other-than-serious$0$0Oct 22, 1993Closed

Inspection 102511896 OPENED AUG 27, 1991Closed

Complaint · Partial · Safety · 50 employees at the site · Closed Nov 19, 1991

400 Red Pine Court, Prentice, WI 54556 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.178(p)(1) · Forklifts and other powered industrial trucks
Other-than-serious$0$0Oct 16, 1991Closed

Inspection 102474020 OPENED JAN 23, 1991Closed

Follow-up · Partial · Safety · 52 employees at the site · Closed Mar 14, 1991

400 Red Pine Court, Prentice, WI 54556 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.147(c)(1) · Lockout/tagout
Repeat$2,240$1,910Jan 30, 1991Closed
Citation 1, item 2
29 CFR 1910.147(c)(7)(i) · Lockout/tagout
Repeat$1,120$850Jan 30, 1991Closed

Inspection 102466786 OPENED OCT 25, 1990Closed

Follow-up · Partial · Safety · 45 employees at the site · Closed Mar 19, 1991

400 Red Pine Court, Prentice, WI 54556 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.23(c)(1) · Guarding floor and wall openings and holes
Serious$400$300Nov 15, 1990Closed
Citation 1, item 2 Serious$320$250Nov 15, 1990Closed
Citation 1, item 3 Serious$480$350Nov 15, 1990Closed
Citation 2, item 1
29 CFR 1910.147(c)(1) · Lockout/tagout
Repeat$1,280$650Nov 15, 1990Closed
Citation 2, item 2
29 CFR 1910.147(c)(6) · Lockout/tagout
Repeat$800$500Nov 15, 1990Closed
Citation 2, item 3 Repeat$800$500Nov 15, 1990Closed
Citation 2, item 4
29 CFR 1910.147(c)(4) · Lockout/tagout
Repeat$1,000$1,000Nov 15, 1990Closed

Inspection 102616836 OPENED JUN 26, 1990Closed

Complaint · Partial · Safety · 20 employees at the site · Closed Feb 27, 1991

400 Red Pine Court, Prentice, WI 54556 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.147(c)(1) · Lockout/tagout
Serious$640$450Jul 16, 1990Closed
Citation 1, item 2a
29 CFR 1910.147(c)(4) · Lockout/tagout
Serious$640$450Jul 16, 1990Closed
Citation 1, item 2b
29 CFR 1910.147(c)(6) · Lockout/tagout
Serious$0$0Jul 16, 1990Closed
Citation 1, item 2d
29 CFR 1910.303(f) · Electrical equipment, general requirements
Serious$0$0Jul 16, 1990Closed
Citation 1, item 3
29 CFR 1910.147(c)(7)(i) · Lockout/tagout
Serious$640$450Jul 16, 1990Closed
Citation 1, item 4
29 CFR 1910.212(a)(1) · Machine guarding
Serious$240$170Jul 16, 1990Closed
Citation 1, item 5 Serious$120$80Jul 16, 1990Closed
Citation 1, item 6 Serious$240$170Jul 16, 1990Closed
Citation 1, item 7 Serious$200$140Jul 16, 1990Closed
Citation 1, item 8 Serious$280$195Jul 16, 1990Closed
Citation 1, item 9 Serious$280$195Jul 16, 1990Closed
Citation 1, item 10 Serious$280$195Jul 16, 1990Closed
Citation 1, item 11 Serious$240$170Jul 16, 1990Closed
Citation 1, item 12 Serious$240$170Jul 16, 1990Closed
Citation 1, item 13a
29 CFR 1910.1200(e)(1) · Hazard communication
Serious$200$140Jul 16, 1990Closed
Citation 1, item 13b
29 CFR 1910.1200(f)(5)(ii) · Hazard communication
Serious$0$0Jul 16, 1990Closed
Citation 1, item 14
29 CFR 1910.1200(h) · Hazard communication
Serious$200$140Jul 16, 1990Closed
Citation 2, item 1
29 CFR 1910.141(a)(3) · Sanitation
Other-than-serious$0$0Jul 16, 1990Closed

Injury and illness logs

From the Form 300A summaries employers file with OSHA each year. Rate = recordable cases per 100 full-time workers.

In 2025, the Prentice site logged 4 recordable injuries or illnesses among about 110 workers: 3.3 per 100 full-time workers, against a median of 4.2 for its industry. Those cases cost 145 days away from work.

Site and yearWorkersCasesDays-away casesRateIndustry median
Biewer Wisconsin Sawmill, Inc.
Prentice · 2025
110 423.34.2

Included with any plan: 8 more yearly logs from these sites, back to 2016, with each site's average rate over its latest three years. Already a subscriber? Sign in.

See plans

Severe injury reports

Employers must report any work-related amputation, in-patient hospitalization or loss of an eye to OSHA within 24 hours. 6 reports on file.

Jun 18, 2025, Prentice: Hospitalization · multiple severe wounds and internal injuries · multiple trunk locations

A maintenance employee was dismantling a kiln. As he was pulling top panels apart, a panel gave out and he fell approximately 6-8 feet, resulting in a fractured lower vertebra and a bruised lung. Fall protection was not tied off at the time.

May 6, 2021, Prentice: Amputation · amputations · fingertip(s)

On May 6, 2021, an employee was unjamming a machine. As a sorter bin was lowering, the employee's left index finger was pulled into the pulley system resulting in a fingertip amputation.

Sep 13, 2018, Prentice: Amputation · amputations · hand(s), n.e.c.

On September 13, 2018, at approximately 11:00 p.m., an employee operating a CNS computer identified a blocked photo eye and used water to clean the photo eye. The employee then saw wood in the machine and was attempting to remove it when the employee contacted the spline remover, resulting in an amputation of the right hand.

Sep 5, 2018, Prentice: Hospitalization · cuts, lacerations · hand(s), unspecified

An employee was changing a belt on a machine when the belt lacerated the employee's right hand, causing tendon damage that required surgery. The machine was not locked out at the time of the incident.

May 25, 2017, Prentice: Hospitalization, amputation · amputations · finger(s), fingernail(s), n.e.c.

An employee was trying to remove a board that was lodged in the infeed of an edger when his right ring finger made contact with the cutter-head and was amputated.

Mar 26, 2015, Prentice: Amputation · amputations · finger(s), fingernail(s), n.e.c.

A PSI blower chip loading system plugged up and tripped the breaker. A maintenance employee locked out the machine, cleared the plug, and restarted the machine. The employee was checking for air flow through the pipes with his right index finger hanging at the stop plate when the mechanical sleeve lacerated the finger pad. The machine amputated a chunk of the right index finger pad. The…

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1904.5 · Determination of work-relatedness

29 CFR 1910.1030 · Bloodborne pathogens

29 CFR 1910.1030(c)(2)(i)(b)

(B) A list of job classifications in which some employees have occupational exposure, and

29 CFR 1910.1030(g)(2)(iic)

(ii) Training shall be provided as follows:

29 CFR 1910.1200 · Hazard communication

29 CFR 1910.1200(e)(1)

(e) Written hazard communication program. (1) Employers shall develop, implement, and maintain at each workplace, a written hazard communication program which at least describes how the criteria specified in paragraphs (f), (g), and (h) of this section for labels and other forms of warning, safety data sheets, and employee information and training will be met, and which also includes the following:

29 CFR 1910.137 · Electrical protective equipment

29 CFR 1910.141 · Sanitation

29 CFR 1910.146 · Permit-required confined spaces

29 CFR 1910.147 · Lockout/tagout

29 CFR 1910.177 · Servicing multi-piece and single piece rim wheels

29 CFR 1910.178 · Forklifts and other powered industrial trucks

29 CFR 1910.179 · Overhead and gantry cranes

29 CFR 1910.184 · Slings

29 CFR 1910.212 · Machine guarding

29 CFR 1910.215 · Grinders and abrasive wheels

29 CFR 1910.22 · Walking-working surfaces

29 CFR 1910.23 · Guarding floor and wall openings and holes

29 CFR 1910.265 · Sawmills

29 CFR 1910.28 · Fall protection in general industry

29 CFR 1910.303 · Electrical equipment, general requirements

29 CFR 1910.304 · Grounding and circuit protection

29 CFR 1910.305 · Electrical wiring methods

29 CFR 1910.333 · Working near live electrical parts

Other sawmills employers in Wisconsin

Alert subscribers get notified of each newly cited employer in Wisconsin the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.