Builders Concrete East, LLC: OSHA inspections and violations

North Windham, Connecticut · Ready-Mix Concrete Manufacturing · NAICS 327320

4inspections
17citation items
$20,685current penalties
Nov 19, 2025last inspection

Builders Concrete East, LLC has 4 OSHA inspections on record in Connecticut, the first in 2002.

OSHA's last visit started on Nov 19, 2025 on a referral, in North Windham.

Across those inspections OSHA issued 17 citation items: 15 serious and 2 other-than-serious.

OSHA proposed $41,370 in penalties. After settlements and reviews the total is $20,685, down 50%.

Most often, OSHA cited 1910.37, exit routes (2 items).

For context, across all manufacturing employers the median penalty per cited inspection since 2015 is $4,500. Builders Concrete East, LLC averages $11,585 over 1 cited inspection in that time.

Builders Concrete East, LLC also files yearly injury logs with OSHA, summarized below.

Builders Concrete East, LLC: OSHA citation items per year, 2002 to 2025
Citation items per year, by inspection date.

Connecticut · latest 90 days of OSHA records

88employers cited

Get notified the morning OSHA posts each new citation in Connecticut: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Connecticut

Checking a subcontractor, a client or your own company? Watch Builders Concrete East, LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 348600503 OPENED NOV 19, 2025Closed

Referral · Partial · Safety · 30 employees at the site · Closed Oct 13, 2026

79 Boston Post Road, North Windham, CT 06256 · Ready-Mix Concrete Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.23(c)(13) · Ladders in general industry
Other-than-serious$11,585$0May 8, 2026Final
Citation 1, item 2
29 CFR 1910.147(c)(1) · Lockout/tagout
Serious$11,585$11,585May 8, 2026Final

Inspection 338972979 OPENED MAR 25, 2013Closed

Planned · Complete · Safety · 20 employees at the site · Closed Jul 17, 2013

79 Boston Post Road, North Windham, CT 06256 · Ready-Mix Concrete Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.23(d)(1)(ii) · Guarding floor and wall openings and holes
Serious$2,800$1,400May 28, 2013Final
Citation 1, item 2a
29 CFR 1910.36(d)(1) · Exit route design
Serious$2,800$1,400May 28, 2013Final
Citation 1, item 2b
29 CFR 1910.36(h)(1) · Exit route design
Serious$0$0May 28, 2013Final
Citation 1, item 2c
29 CFR 1910.37(a)(3) · Exit routes
Serious$0$0May 28, 2013Final
Citation 1, item 2d
29 CFR 1910.37(b)(5) · Exit routes
Serious$0$0May 28, 2013Final
Citation 1, item 4
29 CFR 1910.178(a)(6) · Forklifts and other powered industrial trucks
Serious$2,100$1,050May 28, 2013Final
Citation 1, item 5
29 CFR 1910.178(l)(4)(iii) · Forklifts and other powered industrial trucks
Serious$2,800$1,400May 28, 2013Final
Citation 1, item 6a
29 CFR 1910.303(g)(1)(ii) · Electrical equipment, general requirements
Serious$2,800$1,400May 28, 2013Final
Citation 1, item 6b
29 CFR 1910.303(g)(2)(i) · Electrical equipment, general requirements
Serious$0$0May 28, 2013Final
Citation 2, item 1
29 CFR 1910.147(c)(1) · Lockout/tagout
Other-than-serious$0$0May 28, 2013Final

Inspection 338977424 OPENED MAR 25, 2013Closed

Unprogrammed other · Complete · Health · 20 employees at the site · Closed Aug 19, 2013

79 Boston Post Road, North Windham, CT 06256 · Ready-Mix Concrete Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1910.101(b) · Compressed gases (general requirements)
Serious$2,800$1,400Jun 24, 2013Final
Citation 1, item 1b
29 CFR 1910.110(c)(5)(i)(i) · Storage and handling of liquefied petroleum gases
Serious$0$0Jun 24, 2013Final
Citation 1, item 1c
29 CFR 1910.253(b)(4)(iii) · Gas welding and cutting
Serious$0$0Jun 24, 2013Final
Citation 1, item 2a
29 CFR 1910.1200(e)(1) · Hazard communication
Serious$2,100$1,050Jun 24, 2013Final
Citation 1, item 2b
29 CFR 1910.1200(h)(1) · Hazard communication
Serious$0$0Jun 24, 2013Final

Inspection 116151465 OPENED AUG 19, 2002Closed

Referral · Partial · Safety · 25 employees at the site · Closed Apr 8, 2003

Parker Street, Manchester, CT 06041 · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Injury and illness logs

From the Form 300A summaries employers file with OSHA each year. Rate = recordable cases per 100 full-time workers.

In 2025, the North Windham site logged 2 recordable injuries or illnesses among about 31 workers: 6.6 per 100 full-time workers, against a median of 3.4 for its industry. Those cases cost 18 days away from work.

Site and yearWorkersCasesDays-away casesRateIndustry median
Builders Concrete East, LLC
North Windham · 2025
31 226.63.4
Builders Concrete East, LLC - North Windham
North Windham · 2018
69 536.43.4

Included with any plan: 7 more yearly logs from these sites, back to 2016, with each site's average rate over its latest three years. Already a subscriber? Sign in.

See plans

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.101 · Compressed gases (general requirements)

29 CFR 1910.101(b)

(b) Compressed gases. The in-plant handling, storage, and utilization of all compressed gases in cylinders, portable tanks, rail tankcars, or motor vehicle cargo tanks shall be in accordance with Compressed Gas Association Pamphlet P-1-1965, which is incorporated by reference as specified in § 1910.6.

29 CFR 1910.110 · Storage and handling of liquefied petroleum gases

29 CFR 1910.110(c)(5)(i)(i)

(ii) Containers having a maximum water capacity of 2 1/2 pounds (nominal 1 pound LP-Gas capacity) are permitted to be used inside of buildings as part of approved self-contained hand torch assemblies or similar appliances.

29 CFR 1910.1200 · Hazard communication

29 CFR 1910.1200(e)(1)

(e) Written hazard communication program. (1) Employers shall develop, implement, and maintain at each workplace, a written hazard communication program which at least describes how the criteria specified in paragraphs (f), (g), and (h) of this section for labels and other forms of warning, safety data sheets, and employee information and training will be met, and which also includes the following:

29 CFR 1910.147 · Lockout/tagout

29 CFR 1910.178 · Forklifts and other powered industrial trucks

29 CFR 1910.23 · Ladders in general industry

29 CFR 1910.253 · Gas welding and cutting

29 CFR 1910.303 · Electrical equipment, general requirements

29 CFR 1910.36 · Exit route design

29 CFR 1910.37 · Exit routes

Other ready-mix concrete manufacturing employers in Connecticut

Alert subscribers get notified of each newly cited employer in Connecticut the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.