OSHA SearchOSHA records by employer

Cherokee Steel Inc: OSHA inspections and violations

Lebanon, Tennessee · Fabricated Structural Metal Manufacturing · NAICS 332312

2inspections
23citation items
$17,150current penalties
May 6, 2020last inspection

OSHA has inspected Cherokee Steel Inc 2 times in Tennessee since 2018.

The latest one began on May 6, 2020 on a referral, in Lebanon.

Those inspections ended with 23 citation items: 18 serious and 5 other-than-serious.

Penalties were first proposed at $17,150 and still stand at $17,150.

Spray painting and finishing comes up most often in these citations: 4 items under 1910.107.

How that compares: the median penalty per cited inspection for manufacturing employers since 2015 is $3,600, and Cherokee Steel Inc averages $8,575 (2 cited inspections).

Cherokee Steel Inc: OSHA citation items per year, 2018 to 2020
Citation items per year, by inspection date.

Tennessee · latest 90 days of OSHA records

323employers cited

Get notified the morning OSHA posts each new citation in Tennessee: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Tennessee

Checking a subcontractor, a client or your own company? Watch Cherokee Steel Inc and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 344743182 OPENED MAY 6, 2020Closed

Referral · Partial · Safety · 20 employees at the site · Closed Aug 17, 2020

932 E. Baddour Pkwy, Lebanon, TN 37087 · Structural Steel and Precast Concrete Contractors · OSHA's record · Phone and website on Google Maps

Incident on Apr 30, 2020: Employee falls from steel beam and breaks ankle

At approximately 1:30 P.M. on April 30, 2020, an employee, working for a steel erection contractor, was connecting a steel beam at a commercial building. The employee removed the safety lanyard while connecting the structural beam. The beam was not bolted in correctly, broke, tilted, and was caught in material handling equipment. The employee fell 16 feet to the asphalt. The employee was hospitalized and treated for a broken and fractured ankle.

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR TDLWD RULE 800-01-03-.05(1)(A)2
Other-than-serious$200$200May 29, 2020Final

Inspection 343555801 OPENED OCT 24, 2018Closed

Planned · Complete · Safety · 23 employees at the site · Closed Mar 5, 2019

902 Hutchinson Place, Lebanon, TN 37090 · Fabricated Structural Metal Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR TCA 50-3-105(1)
Serious$900$900Dec 21, 2018Final
Citation 1, item 2 Serious$750$750Dec 21, 2018Final
Citation 1, item 3
29 CFR 1910.37(a)(3) · Exit routes
Serious$750$750Dec 21, 2018Final
Citation 1, item 4
29 CFR 1910.106(d)(7)(iii) · Flammable liquids
Serious$1,050$1,050Dec 21, 2018Final
Citation 1, item 5
29 CFR 1910.106(e)(2)(iv)(a) · Flammable liquids
Serious$1,050$1,050Dec 21, 2018Final
Citation 1, item 6
29 CFR 1910.106(e)(6)(ii) · Flammable liquids
Serious$1,050$1,050Dec 21, 2018Final
Citation 1, item 7
29 CFR 1910.107(b)(5)(i) · Spray painting and finishing
Serious$1,050$1,050Dec 21, 2018Final
Citation 1, item 8
29 CFR 1910.107(b)(5)(iv) · Spray painting and finishing
Serious$1,050$1,050Dec 21, 2018Final
Citation 1, item 9
29 CFR 1910.107(e)(2) · Spray painting and finishing
Serious$1,050$1,050Dec 21, 2018Final
Citation 1, item 10
29 CFR 1910.107(g)(2) · Spray painting and finishing
Serious$1,050$1,050Dec 21, 2018Final
Citation 1, item 11
29 CFR 1910.132(d)(1) · Personal protective equipment, general requirements
Serious$1,200$1,200Dec 21, 2018Final
Citation 1, item 12
29 CFR 1910.147(c)(1) · Lockout/tagout
Serious$1,200$1,200Dec 21, 2018Final
Citation 1, item 13
29 CFR 1910.212(a)(1) · Machine guarding
Serious$1,200$1,200Dec 21, 2018Final
Citation 1, item 14
29 CFR 1910.219(c)(4)(i) · Belts, pulleys and power-transmission parts
Serious$900$900Dec 21, 2018Final
Citation 1, item 15
29 CFR 1910.243(c)(1) · Guarding of portable powered tools
Serious$750$750Dec 21, 2018Final
Citation 1, item 16
29 CFR 1910.303(f)(1) · Electrical equipment, general requirements
Serious$900$900Dec 21, 2018Final
Citation 1, item 17a
29 CFR 1910.1200(e)(1) · Hazard communication
Serious$1,050$1,050Dec 21, 2018Final
Citation 1, item 17b
29 CFR 1910.1200(h)(1) · Hazard communication
Serious$0$0Dec 21, 2018Final
Citation 2, item 1
29 CFR 1910.37(b)(6) · Exit routes
Other-than-serious$0$0Dec 21, 2018Final
Citation 2, item 2
29 CFR 1910.141(g)(2) · Sanitation
Other-than-serious$0$0Dec 21, 2018Final
Citation 2, item 3
29 CFR 1910.303(b)(2) · Electrical equipment, general requirements
Other-than-serious$0$0Dec 21, 2018Final
Citation 2, item 4
29 CFR 1910.305(g)(2)(iii) · Electrical wiring methods
Other-than-serious$0$0Dec 21, 2018Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.106 · Flammable liquids

29 CFR 1910.106(d)(7)(iii)

(iii) Open flames and smoking. Open flames and smoking shall not be permitted in flammable liquid storage areas.

29 CFR 1910.106(e)(2)(iv)(a)

(iv) Handling liquids at point of final use. (a) Category 1 or 2 flammable liquids, or Category 3 flammable liquids with a flashpoint below 100 °F (37.8 °C), shall be kept in covered containers when not actually in use.

29 CFR 1910.106(e)(6)(ii)

(ii) Grounding. Category 1 or 2 flammable liquids, or Category 3 flammable liquids with a flashpoint below 100 °F (37.8 °C), shall not be dispensed into containers unless the nozzle and container are electrically interconnected. Where the metallic floorplate on which the container stands while filling is electrically connected to the fill stem or where the fill stem is bonded to the container during filling operations by means of a bond wire, the provisions of this section shall be deemed to have been complied with.

29 CFR 1910.107 · Spray painting and finishing

29 CFR 1910.1200 · Hazard communication

29 CFR 1910.132 · Personal protective equipment, general requirements

29 CFR 1910.141 · Sanitation

29 CFR 1910.147 · Lockout/tagout

29 CFR 1910.212 · Machine guarding

29 CFR 1910.219 · Belts, pulleys and power-transmission parts

29 CFR 1910.243 · Guarding of portable powered tools

29 CFR 1910.25 · Stairways

29 CFR 1910.303 · Electrical equipment, general requirements

29 CFR 1910.305 · Electrical wiring methods

29 CFR 1910.37 · Exit routes

Other fabricated structural metal manufacturing employers in Tennessee

Alert subscribers get notified of each newly cited employer in Tennessee the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.