Inspection 349226134 OPENED OCT 15, 2026Open
306 East Longview Drive, Portland, TN 37148 · Fabricated Structural Metal Manufacturing · OSHA's record · Phone and website on Google Maps
No citations from this inspection so far.
OSHA has inspected Integrated Manufacturing Systems, LLC 9 times in Tennessee since 2002.
The latest one began on Oct 15, 2026 to follow up on an earlier case, in Portland; the case is still open.
Those inspections ended with 58 citation items: 41 serious and 17 other-than-serious.
Penalties were first proposed at $11,250 and still stand at $11,250.
Respiratory protection comes up most often in these citations: 15 items under 1910.134.
How that compares: the median penalty per cited inspection for manufacturing employers since 2015 is $3,600, and Integrated Manufacturing Systems, LLC averages $3,500 (3 cited inspections).
Tennessee · latest 90 days of OSHA records
334employers cited
Get notified the morning OSHA posts each new citation in Tennessee: the employer, the site address, the rules broken and the penalty.
See who gets cited nextLatest cited in Tennessee
Checking a subcontractor, a client or your own company? Watch Integrated Manufacturing Systems, LLC and get notified the morning OSHA posts a new citation for it.
Watch this company306 East Longview Drive, Portland, TN 37148 · Fabricated Structural Metal Manufacturing · OSHA's record · Phone and website on Google Maps
No citations from this inspection so far.
306 East Longview Drive, Portland, TN 37148 · Fabricated Structural Metal Manufacturing · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
306 East Longview Drive, Portland, TN 37148 · Fabricated Structural Metal Manufacturing · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1910.178(a)(4) · Forklifts and other powered industrial trucks |
Serious | $800 | $800 | Mar 3, 2026 | Final |
| Citation 1, item 2 29 CFR 1910.178(a)(5) · Forklifts and other powered industrial trucks |
Serious | $800 | $800 | Mar 3, 2026 | Final |
| Citation 2, item 1 29 CFR 1910.178(l)(4)(iii) · Forklifts and other powered industrial trucks |
Other-than-serious | $100 | $100 | Mar 3, 2026 | Final |
| Citation 2, item 2 29 CFR TDLWD RULE 800-01-04-.23(4)(A) |
Other-than-serious | $400 | $400 | May 5, 2026 | Final |
306 East Longview Drive, Portland, TN 37148 · Fabricated Structural Metal Manufacturing · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1a 29 CFR 1910.106(d)(4)(i) · Flammable liquids |
Serious | $1,050 | $1,050 | Jun 18, 2026 | Final |
| Citation 1, item 1b 29 CFR 1910.106(e)(2)(ii) · Flammable liquids |
Serious | $0 | $0 | Jun 18, 2026 | Final |
| Citation 1, item 1c 29 CFR 1910.106(e)(2)(ii)(b)(2) · Flammable liquids |
Serious | $0 | $0 | Jun 18, 2026 | Final |
| Citation 1, item 2a 29 CFR 1910.107(b)(5)(i) · Spray painting and finishing |
Serious | $900 | $900 | Jun 18, 2026 | Final |
| Citation 1, item 2b 29 CFR 1910.107(b)(9) · Spray painting and finishing |
Serious | $0 | $0 | Jun 18, 2026 | Final |
| Citation 1, item 3a 29 CFR 1910.107(f)(3) · Spray painting and finishing |
Serious | $900 | $900 | Jun 18, 2026 | Final |
| Citation 1, item 3b 29 CFR 1910.107(g)(2) · Spray painting and finishing |
Serious | $0 | $0 | Jun 18, 2026 | Final |
| Citation 1, item 3c 29 CFR 1910.107(g)(3) · Spray painting and finishing |
Serious | $0 | $0 | Jun 18, 2026 | Final |
| Citation 1, item 4a 29 CFR 1910.134(c)(1) · Respiratory protection |
Serious | $900 | $900 | Jun 18, 2026 | Final |
| Citation 1, item 4b 29 CFR 1910.134(e)(1) · Respiratory protection |
Serious | $0 | $0 | Jun 18, 2026 | Final |
| Citation 1, item 4c 29 CFR 1910.134(f)(2) · Respiratory protection |
Serious | $0 | $0 | Jun 18, 2026 | Final |
| Citation 1, item 4d 29 CFR 1910.134(g)(1)(i)(a) · Respiratory protection |
Serious | $0 | $0 | Jun 18, 2026 | Final |
| Citation 1, item 4e 29 CFR 1910.134(h)(2)(i) · Respiratory protection |
Serious | $0 | $0 | Jun 18, 2026 | Final |
| Citation 1, item 4f 29 CFR 1910.134(k)(1) · Respiratory protection |
Serious | $0 | $0 | Jun 18, 2026 | Final |
| Citation 1, item 5a 29 CFR 1910.1200(e)(1) · Hazard communication |
Serious | $1,050 | $1,050 | Jun 18, 2026 | Final |
| Citation 1, item 5b 29 CFR 1910.1200(f)(6)(ii) · Hazard communication |
Serious | $0 | $0 | Jun 18, 2026 | Final |
| Citation 1, item 5c 29 CFR 1910.1200(g)(8) · Hazard communication |
Serious | $0 | $0 | Jun 18, 2026 | Final |
| Citation 1, item 5d 29 CFR 1910.1200(h)(1) · Hazard communication |
Serious | $0 | $0 | Jun 18, 2026 | Final |
| Citation 1, item 6 29 CFR TDLWD RULE 800-01-03-.03(27)(A) |
Other-than-serious | $300 | $300 | Jun 18, 2026 | Final |
| Citation 1, item 7 29 CFR TDLWD RULE 800-01-04-.23(4)(A) |
Other-than-serious | $400 | $400 | Aug 28, 2026 | Final |
306 East Longview Drive, Portland, TN 37148 · Fabricated Structural Metal Manufacturing · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
306 East Longview Dr., Portland, TN 37148 · Fabricated Structural Metal Manufacturing · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
306 East Longview Dr., Portland, TN 37148 · Fabricated Structural Metal Manufacturing · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1a 29 CFR 1910.106(e)(2)(ii)(b)(2) · Flammable liquids |
Serious | $600 | $600 | Oct 29, 2015 | Final |
| Citation 1, item 1b 29 CFR 1910.106(e)(2)(iv)(a) · Flammable liquids |
Serious | $0 | $0 | Oct 29, 2015 | Final |
| Citation 1, item 2a 29 CFR 1910.107(b)(5)(i) · Spray painting and finishing |
Serious | $600 | $600 | Oct 29, 2015 | Final |
| Citation 1, item 2b 29 CFR 1910.107(b)(5)(iv) · Spray painting and finishing |
Serious | $0 | $0 | Oct 29, 2015 | Final |
| Citation 1, item 2c 29 CFR 1910.107(b)(9) · Spray painting and finishing |
Serious | $0 | $0 | Oct 29, 2015 | Final |
| Citation 1, item 2d 29 CFR 1910.107(c)(6) · Spray painting and finishing |
Serious | $0 | $0 | Oct 29, 2015 | Final |
| Citation 1, item 2e 29 CFR 1910.107(e)(2) · Spray painting and finishing |
Serious | $0 | $0 | Oct 29, 2015 | Final |
| Citation 1, item 2f 29 CFR 1910.107(e)(5) · Spray painting and finishing |
Serious | $0 | $0 | Oct 29, 2015 | Final |
| Citation 1, item 2g 29 CFR 1910.107(g)(2) · Spray painting and finishing |
Serious | $0 | $0 | Oct 29, 2015 | Final |
| Citation 1, item 2h 29 CFR 1910.107(g)(3) · Spray painting and finishing |
Serious | $0 | $0 | Oct 29, 2015 | Final |
| Citation 1, item 2i 29 CFR 1910.107(g)(5) · Spray painting and finishing |
Serious | $0 | $0 | Oct 29, 2015 | Final |
| Citation 1, item 2j 29 CFR 1910.107(g)(7) · Spray painting and finishing |
Serious | $0 | $0 | Oct 29, 2015 | Final |
| Citation 1, item 3a 29 CFR 1910.134(c)(1) · Respiratory protection |
Serious | $600 | $600 | Oct 29, 2015 | Final |
| Citation 1, item 3b 29 CFR 1910.134(e)(1) · Respiratory protection |
Serious | $0 | $0 | Oct 29, 2015 | Final |
| Citation 1, item 3c 29 CFR 1910.134(f)(1) · Respiratory protection |
Serious | $0 | $0 | Oct 29, 2015 | Final |
| Citation 1, item 3d 29 CFR 1910.134(g)(1)(i)(a) · Respiratory protection |
Serious | $0 | $0 | Oct 29, 2015 | Final |
| Citation 1, item 3e 29 CFR 1910.134(h)(2)(i) · Respiratory protection |
Serious | $0 | $0 | Oct 29, 2015 | Final |
| Citation 1, item 3f 29 CFR 1910.134(k)(1) · Respiratory protection |
Serious | $0 | $0 | Oct 29, 2015 | Final |
| Citation 1, item 4 29 CFR 1910.253(b)(4)(iii) · Gas welding and cutting |
Serious | $600 | $600 | Oct 29, 2015 | Final |
| Citation 2, item 1a 29 CFR 1910.1200(e)(1) · Hazard communication |
Other-than-serious | $100 | $100 | Oct 29, 2015 | Final |
| Citation 2, item 1b 29 CFR 1910.1200(h)(1) · Hazard communication |
Other-than-serious | $0 | $0 | Oct 29, 2015 | Final |
| Citation 2, item 2 29 CFR RULE 800-01-04-.23(4)(A) |
Other-than-serious | $400 | $400 | Mar 18, 2016 | Final |
306 East Longview Dr, Portland, TN 37148 · Fabricated Structural Metal Manufacturing · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1a 29 CFR 1910.217(e)(1)(i) · Mechanical power presses |
Serious | $750 | $750 | Oct 6, 2006 | Closed |
| Citation 1, item 1b 29 CFR 1910.217(e)(1)(ii) · Mechanical power presses |
Serious | $0 | $0 | Oct 6, 2006 | Closed |
| Citation 2, item 1 29 CFR 1910.132(d)(2) · Personal protective equipment, general requirements |
Other-than-serious | $0 | $0 | Oct 6, 2006 | Closed |
| Citation 2, item 2 29 CFR 1910.1200(e)(1) · Hazard communication |
Other-than-serious | $0 | $0 | Oct 6, 2006 | Closed |
306 East Longview Dr, Portland, TN 37148 · Fabricated Structural Metal Manufacturing · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1910.305(g)(2)(iii) · Electrical wiring methods |
Other-than-serious | $0 | $0 | Jun 26, 2002 | Closed |
| Citation 1, item 2a 29 CFR 1910.134(e)(1) · Respiratory protection |
Other-than-serious | $0 | $0 | Jun 26, 2002 | Closed |
| Citation 1, item 2b 29 CFR 1910.134(f)(2) · Respiratory protection |
Other-than-serious | $0 | $0 | Jun 26, 2002 | Closed |
| Citation 1, item 2c 29 CFR 1910.134(k)(1) · Respiratory protection |
Other-than-serious | $0 | $0 | Jun 26, 2002 | Closed |
| Citation 1, item 3 29 CFR 1910.178(l)(1)(i) · Forklifts and other powered industrial trucks |
Other-than-serious | $0 | $0 | Jun 26, 2002 | Closed |
| Citation 1, item 4a 29 CFR 1910.1200(e)(1) · Hazard communication |
Other-than-serious | $0 | $0 | Jun 26, 2002 | Closed |
| Citation 1, item 4b 29 CFR 1910.1200(g)(1) · Hazard communication |
Other-than-serious | $0 | $0 | Jun 26, 2002 | Closed |
| Citation 1, item 4c 29 CFR 1910.1200(h)(1) · Hazard communication |
Other-than-serious | $0 | $0 | Jun 26, 2002 | Closed |
Current text from the Code of Federal Regulations. Some citations were issued under older wording.
29 CFR 1910.106(d)(4)(i)
(4) Design and construction of inside storage rooms—(i) Construction. Inside storage rooms shall be constructed to meet the required fire-resistive rating for their use. Such construction shall comply with the test specifications set forth in Standard Methods of Fire Tests of Building Construction and Materials, NFPA 251-1969. Where an automatic sprinkler system is provided, the system shall be designed and installed in an acceptable manner. Openings to other rooms or buildings shall be provided with noncombustible liquid-tight raised sills or ramps at least 4 inches in height, or the floor in the storage area shall be at least 4 inches below the surrounding floor. Openings shall be provided with approved self-closing fire doors. The room shall be liquid-tight where the walls join the floor. A permissible alternate to the sill or ramp is an open-grated trench inside of the room which dra
29 CFR 1910.106(e)(2)(ii)
(ii) Containers. Flammable liquids shall be stored in tanks or closed containers.
29 CFR 1910.106(e)(2)(ii)(b)(2)
(ii) Containers. Flammable liquids shall be stored in tanks or closed containers.
Alert subscribers get notified of each newly cited employer in Tennessee the morning it is posted. See the alert plans.
Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.