OSHA SearchOSHA records by employer

Dahle Construction LLC: OSHA inspections and violations

Star, Idaho · Water and Sewer Line and Related Structures Construction · NAICS 237110

7inspections
19citation items
$90,124current penalties
Apr 1, 2025last inspection

OSHA has inspected Dahle Construction LLC 7 times in Idaho since 2016.

The latest one began on Apr 1, 2025 after a fatality or catastrophe, in Salmon.

Those inspections ended with 19 citation items: 11 serious, 3 repeat and 5 other-than-serious.

Penalties were first proposed at $141,770 and now stand at $90,124, 36% lower after settlements or reviews.

Trench protection comes up most often in these citations: 6 items under 1926.652.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and Dahle Construction LLC averages $22,531 (4 cited inspections).

1 inspection on this page followed a fatal incident.

Dahle Construction LLC also files yearly injury logs with OSHA, summarized below.

It reported 2 severe injuries to OSHA since 2015.

Dahle Construction LLC: OSHA citation items per year, 2016 to 2025
Citation items per year, by inspection date.

Idaho · latest 90 days of OSHA records

62employers cited

Get notified the morning OSHA posts each new citation in Idaho: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Idaho

Checking a subcontractor, a client or your own company? Watch Dahle Construction LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 348152265 OPENED APR 1, 2025Closed

Fatality or catastrophe · Partial · Safety · 65 employees at the site · Closed Oct 28, 2026

2 B And T Road, Salmon, ID 83467 · Water and Sewer Line and Related Structures Construction · OSHA's record · Phone and website on Google Maps

Incident on Jul 30, 2024 (fatal): Employee falls from excavator bucket and sustains fatal inju

At 4:00 p.m. on July 30, 2024, an employee was working in an excavation for a septic tank under wet and slippery conditions. The employee was being removed from the excavation using an excavator bucket and either fell or jumped from the bucket into the excavation. The employee sustained broken vertebrae and ribs, resulting in a fatality.

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
OSH Act Section 5(a)(1) · General Duty Clause
Serious$13,902$5,213Sep 19, 2025Final
Citation 1, item 3a
29 CFR 1926.1153(c)(1) · Silica dust in construction
Serious$9,931$4,965Sep 19, 2025Final
Citation 1, item 3b
29 CFR 1926.1153(d)(2)(i) · Silica dust in construction
Serious$0$0Sep 19, 2025Final
Citation 1, item 3c
29 CFR 1926.1153(g)(1) · Silica dust in construction
Serious$0$0Sep 19, 2025Final
Citation 2, item 1
29 CFR 1926.651(c)(2) · Excavations
Repeat$15,888$3,972Sep 19, 2025Final
Citation 2, item 2
29 CFR 1926.652(a)(1) · Trench protection
Repeat$19,863$9,932Sep 19, 2025Final
Citation 3, item 1
29 CFR 1904.39(a)(1) · Reporting deaths and severe injuries
Other-than-serious$9,931$2,483Sep 19, 2025Final

Inspection 346969447 OPENED SEP 12, 2023Closed

Follow-up · Partial · Safety · 5 employees at the site · Closed Jan 25, 2024

Franklin Rd, Nampa, ID 83651 · Water and Sewer Line and Related Structures Construction · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 345723829 OPENED JAN 12, 2022Closed

Complaint · Partial · Safety · 8 employees at the site · Closed Sep 12, 2023

Starhaven And Hidden Lakes Dr., Star, ID 83669 · Water and Sewer Line and Related Structures Construction · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.100(a) · Hard hats in construction
Serious$7,977$5,980Jun 27, 2022Final
Citation 1, item 2a
29 CFR 1926.651(c)(2) · Excavations
Serious$11,167$8,375Jun 27, 2022Final
Citation 1, item 2b
29 CFR 1926.652(g)(1)(iii) · Trench protection
Serious$0$0Jun 27, 2022Final
Citation 1, item 3
29 CFR 1926.651(k)(2) · Excavations
Serious$11,167$8,375Jun 27, 2022Final
Citation 1, item 4a
29 CFR 1926.652(b) · Trench protection
Serious$9,572$7,170Jun 27, 2022Final
Citation 1, item 4b
29 CFR 1926.652(g)(1)(ii) · Trench protection
Serious$0$0Jun 27, 2022Final
Citation 2, item 1
29 CFR 1926.652(a)(1) · Trench protection
Repeat$22,333$20,100Jun 27, 2022Final

Inspection 343954616 OPENED APR 23, 2019Closed

Referral · Partial · Safety · 50 employees at the site · Closed Apr 3, 2020

Ustick & Santa Ana, Nampa, ID 83651 · Water and Sewer Line and Related Structures Construction · OSHA's record · Phone and website on Google Maps

Incident on Apr 22, 2019: Employee is injured when struck by falling excavator bucket

At 9:30 a.m. on April 22, 2019, an employee of a water and sewer line construction company was working at a residential site. He was in an excavation and standing inside a trench box when the bucket of an excavator fell off the excavator and landed on top of him. The employee was transported to the hospital for treatment of traumatic head and back injuries.

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
OSH Act Section 5(a)(1) · General Duty Clause
Serious$9,282$9,282Aug 29, 2019Final
Citation 2, item 1a
29 CFR 1903.19(c)(1) · Proving cited hazards were fixed
Other-than-serious$757$0Mar 6, 2020Final
Citation 2, item 1b
29 CFR 1903.19(d)(1) · Proving cited hazards were fixed
Other-than-serious$0$0Mar 6, 2020Final

Inspection 342804101 OPENED DEC 1, 2017Closed

Follow-up · Partial · Safety · 35 employees at the site · Closed Dec 1, 2017

Seneca Spring Way, Star, ID 83669 · Water and Sewer Line and Related Structures Construction · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 342605599 OPENED AUG 30, 2017Closed

Complaint · Partial · Safety · 35 employees at the site · Closed Dec 15, 2017

Brookside Dr, Boise, ID 83713 · Water and Sewer Line and Related Structures Construction · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1b
29 CFR 1926.651(k)(1) · Excavations
Other-than-serious$0$4,278Sep 29, 2017Final
Citation 1, item 1c
29 CFR 1926.652(a)(1) · Trench protection
Other-than-serious$0$0Sep 29, 2017Final

Inspection 341724771 OPENED AUG 23, 2016Closed

Referral · Partial · Safety · 5 employees at the site · Closed Aug 30, 2016

Harris Street And Meridian Road, Meridian, ID 83642 · Water and Sewer Line and Related Structures Construction · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Injury and illness logs

From the Form 300A summaries employers file with OSHA each year. Rate = recordable cases per 100 full-time workers.

In 2024, the Salmon site logged 4 recordable injuries or illnesses among about 67 workers: 5.5 per 100 full-time workers, against a median of 0.1 for its industry.

Site and yearWorkersCasesDays-away casesRateIndustry median
Dahle Construction LLC
Salmon · 2024
67 405.50.1

Severe injury reports

Employers must report any work-related amputation, in-patient hospitalization or loss of an eye to OSHA within 24 hours. 2 reports on file.

Apr 22, 2019, Nampa: Hospitalization · fractures · head and trunk

A 3-foot, 1,500- to 2,000-pound bucket became detached and fell onto a spool, then rotated and flipped over on top of an employee, breaking the employee's skull and a vertebra in the employee's back.

Nov 30, 2016, Salmon: Hospitalization · fractures · cheek(s)

An employee was struck in the face by a metal cap while leak testing a water line. The employee's cheekbone was fractured.

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1903.19 · Proving cited hazards were fixed

29 CFR 1903.19(c)(1)

(c) Abatement certification. (1) Within 10 calendar days after the abatement date, the employer must certify to OSHA (the Agency) that each cited violation has been abated, except as provided in paragraph (c)(2) of this section.

29 CFR 1903.19(d)(1)

(d) Abatement documentation. (1) The employer must submit to the Agency, along with the information on abatement certification required by paragraph (c)(3) of this section, documents demonstrating that abatement is complete for each willful or repeat violation and for any serious violation for which the Agency indicates in the citation that such abatement documentation is required.

29 CFR 1904.39 · Reporting deaths and severe injuries

29 CFR 1904.39(a)(1)

(a) Basic requirement. (1) Within eight (8) hours after the death of any employee as a result of a work-related incident, you must report the fatality to the Occupational Safety and Health Administration (OSHA), U.S. Department of Labor.

29 CFR 1926.100 · Hard hats in construction

29 CFR 1926.1153 · Silica dust in construction

29 CFR 1926.651 · Excavations

29 CFR 1926.652 · Trench protection

OSH Act Section 5 · General Duty Clause

Other water and sewer line and related structures construction employers in Idaho

Alert subscribers get notified of each newly cited employer in Idaho the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.