OSHA SearchOSHA records by employer

Despatch Industries Limited Partnership: OSHA inspections and violations

Lakeville, Minnesota · Industrial Process Furnace and Oven Manufacturing · NAICS 333994

1inspections
5citation items
$1,960current penalties
Jan 20, 2016last inspection

Despatch Industries Limited Partnership has one OSHA inspection on record in Minnesota.

OSHA opened it on Jan 20, 2016 as a planned inspection, in Lakeville.

From that inspection OSHA issued 5 citation items: 3 serious and 2 other-than-serious.

OSHA proposed $2,800 in penalties. After settlements and reviews the total is $1,960, down 30%.

For context, across all manufacturing employers the median penalty per cited inspection since 2015 is $3,600. Despatch Industries Limited Partnership averages $1,960 over 1 cited inspection in that time.

Despatch Industries Limited Partnership: OSHA citation items per year, 2016 to 2016
Citation items per year, by inspection date.

Minnesota · latest 90 days of OSHA records

380employers cited

Get notified the morning OSHA posts each new citation in Minnesota: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Minnesota

Checking a subcontractor, a client or your own company? Watch Despatch Industries Limited Partnership and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 341188886 OPENED JAN 20, 2016Closed

Planned · Complete · Health · 140 employees at the site · Closed Apr 6, 2016

8860 207th St W, Lakeville, MN 55044 · Industrial Process Furnace and Oven Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.107(g)(2) · Spray painting and finishing
Serious$800$560Mar 9, 2016Final
Citation 1, item 2
29 CFR 1910.134(a)(2) · Respiratory protection
Serious$800$560Mar 9, 2016Final
Citation 1, item 3 Serious$800$560Mar 9, 2016Final
Citation 2, item 1
29 CFR 1910.305(g)(2)(iii) · Electrical wiring methods
Other-than-serious$200$140Mar 9, 2016Final
Citation 2, item 2 Other-than-serious$200$140Mar 9, 2016Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.107 · Spray painting and finishing

29 CFR 1910.107(g)(2)

(2) Cleaning. All spraying areas shall be kept as free from the accumulation of deposits of combustible residues as practical, with cleaning conducted daily if necessary. Scrapers, spuds, or other such tools used for cleaning purposes shall be of nonsparking material.

29 CFR 1910.134 · Respiratory protection

29 CFR 1910.134(a)(2)

(2) The CNP system defaults selected for test pressure shall be set at −15 mm of water (-0.58 inches of water) and the modeled inspiratory flow rate shall be 53.8 liters per minute for performing fit tests.

29 CFR 1910.305 · Electrical wiring methods

29 CFR 1910.305(g)(2)(iii)

(iii) Flexible cords and cables shall be connected to devices and fittings so that strain relief is provided that will prevent pull from being directly transmitted to joints or terminal screws.

29 CFR 5205.116

29 CFR 5205.675

Other industrial process furnace and oven manufacturing employers in Minnesota

Alert subscribers get notified of each newly cited employer in Minnesota the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.