Inspection 347564601 OPENED JUN 20, 2024Closed
33.12927 N; 87.37874 W, Coaling, AL 35449 · Electrical Contractors and Other Wiring Installation Contractors · OSHA's record · Phone and website on Google Maps
Incident on Jun 19, 2024 (fatal): Employee dies following electrocution
At 1:30 p.m. on June 19, 2024, Employee #1, a crew member working on power line connections in Coaling, Alabama, was performing electrical work on Utility Pole 2080. After making final connections to energize the circuit, Employee #1 elevated in a bucket truck to replace a broken cutout switch but came into contact with an energized power line. The laborer, who had been working alongside Employee #1, found him unresponsive in the bucket with burns on his face, arms, and other parts of his body. Emergency services were called, but Employee #1 was declared dead at the scene due to high-voltage electrocution.
Incident on Jun 19, 2024 (fatal): Employee is killed when electrocuted
At 1:30 p.m. on June 19, 2024, an employee was electrocuted while accomplishing maintenance on a 7.2kV distribution line. The employee was killed.
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1910.137(c)(2)(viii) · Electrical protective equipment |
Serious | $11,292 | $9,598 | Dec 17, 2024 | Final |
| Citation 1, item 2 OSH Act Section 5(a)(1) · General Duty Clause |
Serious | $11,292 | $9,598 | Dec 17, 2024 | Final |
| Citation 1, item 3 29 CFR 1910.269(a)(2)(iv) · Electric power generation, transmission, and distribution |
Other-than-serious | $11,292 | $9,598 | Dec 17, 2024 | Final |
| Citation 1, item 4 29 CFR 1910.269(c)(1)(ii) · Electric power generation, transmission, and distribution |
Serious | $11,292 | $9,598 | Dec 17, 2024 | Final |
| Citation 1, item 5 29 CFR 1910.269(j)(2)(iii) · Electric power generation, transmission, and distribution |
Serious | $11,292 | $9,598 | Dec 17, 2024 | Final |
| Citation 1, item 6 29 CFR 1910.269(l)(3)(iii) · Electric power generation, transmission, and distribution |
Serious | $11,292 | $9,598 | Dec 17, 2024 | Final |
| Citation 1, item 7 29 CFR 1910.269(m)(3)(ii) · Electric power generation, transmission, and distribution |
Serious | $16,131 | $13,711 | Dec 17, 2024 | Final |
| Citation 2, item 1 29 CFR 1910.132(d)(1) · Personal protective equipment, general requirements |
Other-than-serious | $906 | $770 | Dec 17, 2024 | Final |