Since 1985, OSHA inspectors have visited Encore Construction, Inc. in Wisconsin 16 times.
The most recent inspection opened on Aug 5, 2015 as part of a related case, in Middleton.
In all, OSHA issued 10 citation items: 3 serious and 7 other-than-serious.
The proposed penalties came to $6,810; today they stand at $4,140, 39% less.
The rule cited most here is 1926.50 (medical services and first aid), 2 times.
Among construction employers, the typical cited inspection since 2015 ends with a $3,080 penalty. Encore Construction, Inc. averages $2,520 across 1 cited inspection.
1 inspection on this page followed a fatal incident.
Inspection 340414697 OPENED FEB 20, 2015Closed
Unprogrammed related · Complete · Safety · 25 employees at the site · Closed Jul 22, 2015
950 John Nolen Drive, Madison, WI 53713 · New Multifamily Housing Construction (except For-Sale Builders) · OSHA's record · Phone and website on Google Maps
Incident on Feb 20, 2015 (fatal): Employee is crushed when masonry wall collapses
At approximately 7:30 a.m. on February 20, 2015, three iron workers were erecting a steel stairway on a multi-story apartment and retail building. The stairway was being erected inside a shaft that consisted of masonry walls on three sides. The iron workers had rigged a horizontal wire rope between to the east and west walls of the shaft near the top of the shaft on the 3rd floor. A ? ton Harrington Chain Hoist (Model CF4) was supported by the horizontal wire rope and the hoist was used to lift the steel staircase members that weighed between 28-and-123 pounds. The first two levels of the stairway were placed with this system on February 16 & 17, and work did not continue on February 18 & 19 due to extreme winter conditions. On the morning of February 20, the temperature was approximately 8 degrees Fahrenheit, with wind speeds of approximately 7 mph and max gusts of approximately 28 mph. The three iron workers were working from the first floor of the stairwell and were attempting to lift a stair stringer and then lower it for stairway access to the basement. The west section of the 3rd floor masonry wall that was supporting the horizontal wire rope collapsed into the stairwell. Iron worker #1 was welding from an 8 foot tall Werner step ladder that was on the first floor, leaning against the east wall. The collapsing section of wall that was approximately 11 blocks high and 7.5 blocks wide, struck iron worker #1 causing fatal injuries. The masonry walls had been erected for the first 3 floors a couple weeks prior to the accident, but the masonry walls were not complete and were planned to be extended for the remaining floors in the future. The masonry walls had also not been filled with grout nor had the permanent rebar been installed. The masonry wall was attached to the wood structure of the building, but the top portion was greater than 8 feet tall and was not braced to prevent overturning or collapse. A determination was not made to assure that the masonry walls could adequately support the rigging method used for the stairway. Iron worker #1 received crushing injuries to the head, spine, back, and ribs area, and was killed. the head, spine, back, and ribs area, and was killed.
No citations from this inspection.
Inspection 339670176 OPENED APR 9, 2014Closed
Planned · Partial · Safety · 20 employees at the site · Closed Apr 9, 2014
5160 East Cheryl Parkway, Fitchburg, WI 53711 · New Multifamily Housing Construction (except For-Sale Builders) · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
Inspection 339575599 OPENED FEB 5, 2014Closed
Planned · Partial · Safety · 20 employees at the site · Closed Feb 5, 2014
1033 High Street, Madison, WI 53715 · New Multifamily Housing Construction (except For-Sale Builders) · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
Inspection 339541385 OPENED JAN 9, 2014Closed
Planned · Partial · Safety · 20 employees at the site · Closed Jan 22, 2014
301 Main Street, Waunakee, WI 53597 · New Multifamily Housing Construction (except For-Sale Builders) · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
Inspection 338992126 OPENED APR 4, 2013Closed
Referral · Partial · Safety · 10 employees at the site · Closed May 14, 2013
3750 Parmenter Street, Middleton, WI 53562 · New Multifamily Housing Construction (except For-Sale Builders) · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
Inspection 338970882 OPENED MAR 20, 2013Closed
Planned · Partial · Safety · 10 employees at the site · Closed Mar 20, 2013
152 West End Circle, Verona, WI 53593 · New Multifamily Housing Construction (except For-Sale Builders) · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
Inspection 338048010 OPENED JAN 2, 2013Closed
Planned · Partial · Safety · 6 employees at the site · Closed Jan 3, 2013
152 West End Circle, Verona, WI 53593 · New Multifamily Housing Construction (except For-Sale Builders) · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
Current text from the Code of Federal Regulations. Some citations were issued under older wording.
Alert subscribers get notified of each newly cited employer in Wisconsin the morning it is posted. See the alert plans.