Inspection 347532244 OPENED JUN 4, 2024Closed
801 North Salisbury Street, Lexington, NC 27292 · Fabricated Structural Metal Manufacturing · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
Lexington, North Carolina · Fabricated Structural Metal Manufacturing · NAICS 332312
OSHA has inspected Genesis Metalworks, Inc 2 times in North Carolina since 2021.
The latest one began on Jun 4, 2024 as a planned inspection, in Lexington.
Those inspections ended with 17 citation items: 12 serious and 5 other-than-serious.
Penalties were first proposed at $7,650 and now stand at $4,973, 35% lower after settlements or reviews.
Electrical wiring methods comes up most often in these citations: 3 items under 1910.305.
How that compares: the median penalty per cited inspection for manufacturing employers since 2015 is $3,600, and Genesis Metalworks, Inc averages $4,973 (1 cited inspection).
North Carolina · latest 90 days of OSHA records
234employers cited
Get notified the morning OSHA posts each new citation in North Carolina: the employer, the site address, the rules broken and the penalty.
See who gets cited nextLatest cited in North Carolina
Checking a subcontractor, a client or your own company? Watch Genesis Metalworks, Inc and get notified the morning OSHA posts a new citation for it.
Watch this company801 North Salisbury Street, Lexington, NC 27292 · Fabricated Structural Metal Manufacturing · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
801 North Salisbury Street, Lexington, NC 27293 · Fabricated Structural Metal Manufacturing · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1910.28(b)(1)(i) · Fall protection in general industry |
Serious | $450 | $200 | Jul 7, 2021 | Final |
| Citation 1, item 2 29 CFR 1910.151(c) · First aid and eyewash |
Serious | $900 | $600 | Jul 7, 2021 | Final |
| Citation 1, item 3 29 CFR 1910.107(b)(9) · Spray painting and finishing |
Serious | $450 | $300 | Jul 7, 2021 | Final |
| Citation 1, item 4a 29 CFR 1910.138(a) · Gloves and hand protection |
Serious | $1,500 | $1,000 | Jul 7, 2021 | Final |
| Citation 1, item 4b 29 CFR 1910.132(a) · Personal protective equipment, general requirements |
Serious | $0 | $0 | Jul 7, 2021 | Final |
| Citation 1, item 4c 29 CFR 1910.132(d)(1) · Personal protective equipment, general requirements |
Serious | $0 | $0 | Jul 7, 2021 | Final |
| Citation 1, item 5 29 CFR 1910.212(a)(1) · Machine guarding |
Serious | $900 | $600 | Jul 7, 2021 | Final |
| Citation 1, item 6 29 CFR 1910.305(b)(2)(i) · Electrical wiring methods |
Serious | $1,500 | $1,000 | Jul 7, 2021 | Final |
| Citation 1, item 7 29 CFR 1910.212(b) · Machine guarding |
Serious | $450 | $300 | Jul 7, 2021 | Final |
| Citation 1, item 8a 29 CFR 1910.1200(e)(1) · Hazard communication |
Serious | $1,500 | $973 | Jul 7, 2021 | Final |
| Citation 1, item 8b 29 CFR 1910.1200(g)(1) · Hazard communication |
Serious | $0 | $0 | Jul 7, 2021 | Final |
| Citation 1, item 8c 29 CFR 1910.1200(h)(1) · Hazard communication |
Serious | $0 | $0 | Jul 7, 2021 | Final |
| Citation 2, item 1 29 CFR 1910.134(c)(2)(i) · Respiratory protection |
Other-than-serious | $0 | $0 | Jul 7, 2021 | Final |
| Citation 2, item 2 29 CFR 1910.305(g)(1)(iv)(a) · Electrical wiring methods |
Other-than-serious | $0 | $0 | Jul 7, 2021 | Final |
| Citation 2, item 3 29 CFR 1910.305(g)(1)(iv)(d) · Electrical wiring methods |
Other-than-serious | $0 | $0 | Jul 7, 2021 | Final |
| Citation 2, item 4 29 CFR 1910.303(g)(1)(ii) · Electrical equipment, general requirements |
Other-than-serious | $0 | $0 | Jul 7, 2021 | Final |
| Citation 2, item 5 29 CFR 1910.37(a)(3) · Exit routes |
Other-than-serious | $0 | $0 | Jul 7, 2021 | Final |
Current text from the Code of Federal Regulations. Some citations were issued under older wording.
29 CFR 1910.107(b)(9)
(9) Cleaning. Spray booths shall be so installed that all portions are readily accessible for cleaning. A clear space of not less than 3 feet on all sides shall be kept free from storage or combustible construction.
29 CFR 1910.1200(e)(1)
(e) Written hazard communication program. (1) Employers shall develop, implement, and maintain at each workplace, a written hazard communication program which at least describes how the criteria specified in paragraphs (f), (g), and (h) of this section for labels and other forms of warning, safety data sheets, and employee information and training will be met, and which also includes the following:
29 CFR 1910.1200(g)(1)
(g) Safety data sheets. (1) Chemical manufacturers and importers shall obtain or develop a safety data sheet for each hazardous chemical they produce or import. Employers shall have a safety data sheet in the workplace for each hazardous chemical which they use.
Alert subscribers get notified of each newly cited employer in North Carolina the morning it is posted. See the alert plans.
Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.