OSHA SearchOSHA records by employer

Graphic Services LLC: OSHA inspections and violations

Manassas, Virginia · Sign Manufacturing · NAICS 339950

2inspections
14citation items
$8,651current penalties
Jan 17, 2019last inspection

OSHA has inspected Graphic Services LLC 2 times in Virginia since 2013.

The latest one began on Jan 17, 2019 as a planned inspection, in Manassas.

Those inspections ended with 14 citation items: 13 serious and 1 other-than-serious.

Penalties were first proposed at $11,465 and now stand at $8,651, 25% lower after settlements or reviews.

Spray painting and finishing comes up most often in these citations: 4 items under 1910.107.

How that compares: the median penalty per cited inspection for manufacturing employers since 2015 is $3,600, and Graphic Services LLC averages $8,441 (1 cited inspection).

Graphic Services LLC: OSHA citation items per year, 2013 to 2019
Citation items per year, by inspection date.

Want to know if OSHA cites Graphic Services LLC again? Add it to a watchlist and we will email you the morning the citation shows up.

Watch this company

Inspection history

Inspection 343720496 OPENED JAN 17, 2019Closed

Planned · Complete · Safety · 14 employees at the site · Closed Oct 18, 2019

7997 Wellingford Drive, Manassas, VA 20109 · Sign Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1910.134(c)(1) · Respiratory protection
Serious$1,975$1,481Feb 20, 2019Final
Citation 1, item 1b
29 CFR 1910.134(e)(1) · Respiratory protection
Serious$0$0Feb 20, 2019Final
Citation 1, item 2
29 CFR 1910.147(c)(1) · Lockout/tagout
Serious$2,875$2,156Feb 20, 2019Final
Citation 1, item 3
29 CFR 1910.242(b) · Hand and power tools
Serious$1,975$1,481Feb 20, 2019Final
Citation 1, item 4a
29 CFR 1910.304(g)(5) · Grounding and circuit protection
Serious$1,975$1,481Feb 20, 2019Final
Citation 1, item 4b
29 CFR 1910.334(a)(2)(i) · Using electrical equipment
Serious$0$0Feb 20, 2019Final
Citation 1, item 5a
29 CFR 1910.303(b)(2) · Electrical equipment, general requirements
Serious$2,455$1,841Feb 20, 2019Final
Citation 1, item 5b
29 CFR 1910.305(a)(2)(x) · Electrical wiring methods
Serious$0$0Feb 20, 2019Final
Citation 1, item 5c
29 CFR 1910.305(g)(1)(iv)(a) · Electrical wiring methods
Serious$0$0Feb 20, 2019Final
Citation 2, item 1
29 CFR 1910.107(b)(9) · Spray painting and finishing
Other-than-serious$0$0Feb 20, 2019Final

Inspection 316999762 OPENED MAR 27, 2013Closed

Planned · Complete · Health · 13 employees at the site · Closed May 29, 2013

7997 Wellingford Drive, Manassas, VA 20109 · Sign Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1910.107(b)(5)(i) · Spray painting and finishing
Serious$105$105May 9, 2013Closed
Citation 1, item 1b
29 CFR 1910.107(b)(9) · Spray painting and finishing
Serious$0$0May 9, 2013Closed
Citation 1, item 1c
29 CFR 1910.107(f)(3) · Spray painting and finishing
Serious$0$0May 9, 2013Closed
Citation 1, item 2
29 CFR 1910.1200(f)(6)(ii) · Hazard communication
Serious$105$105May 9, 2013Closed

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.107 · Spray painting and finishing

29 CFR 1910.107(b)(5)(i)

(i) The spraying operations except electrostatic spraying operations shall be so designed, installed and maintained that the average air velocity over the open face of the booth (or booth cross section during spraying operations) shall be not less than 100 linear feet per minute. Electrostatic spraying operations may be conducted with an air velocity over the open face of the booth of not less than 60 linear feet per minute, or more, depending on the volume of the finishing material being applied and its flammability and explosion characteristics. Visible gauges or audible alarm or pressure activated devices shall be installed to indicate or insure that the required air velocity is maintained. Filter rolls shall be inspected to insure proper replacement of filter media.

29 CFR 1910.107(b)(9)

(9) Cleaning. Spray booths shall be so installed that all portions are readily accessible for cleaning. A clear space of not less than 3 feet on all sides shall be kept free from storage or combustible construction.

29 CFR 1910.107(f)(3)

(3) Cleaning of heads. Sprinklers protecting spraying areas shall be kept as free from deposits as practical by cleaning daily if necessary. (See also paragraph (g) of this section.)

29 CFR 1910.1200 · Hazard communication

29 CFR 1910.134 · Respiratory protection

29 CFR 1910.147 · Lockout/tagout

29 CFR 1910.242 · Hand and power tools

29 CFR 1910.303 · Electrical equipment, general requirements

29 CFR 1910.304 · Grounding and circuit protection

29 CFR 1910.305 · Electrical wiring methods

29 CFR 1910.334 · Using electrical equipment

Other sign manufacturing employers in Virginia

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.