OSHA SearchOSHA records by employer

Harvard Integrations, LP: OSHA inspections and violations

Tea, South Dakota · Prefabricated Metal Building and Component Manufacturing · NAICS 332311

3inspections
8citation items
$21,717current penalties
Dec 15, 2023last inspection

Since 2018, OSHA inspectors have visited Harvard Integrations, LP in South Dakota 3 times.

The most recent inspection opened on Dec 15, 2023 after a complaint, in Tea.

In all, OSHA issued 8 citation items: 7 serious and 1 other-than-serious.

The proposed penalties came to $34,736; today they stand at $21,717, 37% less.

The rule cited most here is 1910.147 (lockout/tagout), 2 times.

Among manufacturing employers, the typical cited inspection since 2015 ends with a $3,600 penalty. Harvard Integrations, LP averages $7,239 across 3 cited inspections.

Harvard Integrations, LP also files yearly injury logs with OSHA, summarized below.

Harvard Integrations, LP: OSHA citation items per year, 2018 to 2023
Citation items per year, by inspection date.

Want to know if OSHA cites Harvard Integrations, LP again? Add it to a watchlist and we will email you the morning the citation shows up.

Watch this company

Inspection history

Inspection 347167074 OPENED DEC 15, 2023Closed

Complaint · Partial · Safety · 230 employees at the site · Closed May 10, 2024

27157 470th Avenue, Tea, SD 57064 · Prefabricated Metal Building and Component Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.303(g)(2)(i) · Electrical equipment, general requirements
Serious$5,288$3,173Apr 30, 2024Final
Citation 2, item 1
29 CFR 1910.179(j)(3) · Overhead and gantry cranes
Other-than-serious$990$594Apr 30, 2024Final

Inspection 346458292 OPENED JAN 20, 2023Closed

Complaint · Partial · Health · 183 employees at the site · Closed Jul 25, 2023

27157 470th Avenue, Tea, SD 57064 · Prefabricated Metal Building and Component Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.23(b)(10) · Ladders in general industry
Serious$6,831$4,099Jun 21, 2023Final
Citation 1, item 2
29 CFR 1910.134(g)(1)(i)(a) · Respiratory protection
Serious$6,831$4,099Jun 21, 2023Final
Citation 1, item 3
29 CFR 1910.252(b)(2)(iii) · Welding fire safety
Serious$5,122$3,073Jun 21, 2023Final

Inspection 343044970 OPENED MAR 27, 2018Closed

Planned · Partial · Safety · 78 employees at the site · Closed Aug 6, 2018

27157 470th Avenue, Tea, SD 57064 · Prefabricated Metal Building and Component Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1910.147(c)(4)(i) · Lockout/tagout
Serious$4,837$3,380Jul 11, 2018Final
Citation 1, item 1c
29 CFR 1910.147(c)(7)(i) · Lockout/tagout
Serious$0$0Jul 11, 2018Final
Citation 1, item 2
29 CFR 1910.212(a)(3)(ii) · Machine guarding
Serious$4,837$3,300Jul 11, 2018Final

Injury and illness logs

From the Form 300A summaries employers file with OSHA each year. Rate = recordable cases per 100 full-time workers.

In 2025, the Tea site logged 22 recordable injuries or illnesses among about 407 workers: 4.0 per 100 full-time workers, against a median of 3.6 for its industry. Those cases cost 37 days away from work.

Site and yearWorkersCasesDays-away casesRateIndustry median
Harvard Integrations
Tea · 2025
407 2224.03.6

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.134 · Respiratory protection

29 CFR 1910.134(g)(1)(i)(a)

(A) Facial hair that comes between the sealing surface of the facepiece and the face or that interferes with valve function; or

29 CFR 1910.147 · Lockout/tagout

29 CFR 1910.147(c)(4)(i)

(4) Energy control procedure. (i) Procedures shall be developed, documented and utilized for the control of potentially hazardous energy when employees are engaged in the activities covered by this section.

29 CFR 1910.147(c)(7)(i)

(7) Training and communication. (i) The employer shall provide training to ensure that the purpose and function of the energy control program are understood by employees and that the knowledge and skills required for the safe application, usage, and removal of the energy controls are acquired by employees. The training shall include the following:

29 CFR 1910.179 · Overhead and gantry cranes

29 CFR 1910.212 · Machine guarding

29 CFR 1910.23 · Ladders in general industry

29 CFR 1910.252 · Welding fire safety

29 CFR 1910.303 · Electrical equipment, general requirements

Other prefabricated metal building and component manufacturing employers in South Dakota

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.