OSHA SearchOSHA records by employer

Hellas Construction, Inc.: OSHA inspections and violations

Mansfield, Texas · Commercial and Institutional Building Construction · NAICS 236220

10inspections
12citation items
$101,400current penalties
Oct 2, 2024last inspection

Hellas Construction, Inc. has 10 OSHA inspections on record in Texas, the first in 2006.

OSHA's last visit started on Oct 2, 2024 on a referral, in Cypress.

Across those inspections OSHA issued 12 citation items: 7 serious and 5 other-than-serious.

OSHA proposed $228,127 in penalties. After settlements and reviews the total is $101,400, down 56%.

Most often, OSHA cited 1926.50, medical services and first aid (3 items).

For context, across all construction employers the median penalty per cited inspection since 2015 is $3,078. Hellas Construction, Inc. averages $33,800 over 3 cited inspections in that time.

2 inspections on this page followed a fatal incident.

It reported 3 severe injuries to OSHA since 2015.

Hellas Construction, Inc.: OSHA citation items per year, 2006 to 2024
Citation items per year, by inspection date.

Want to know if OSHA cites Hellas Construction, Inc. again? Add it to a watchlist and we will email you the morning the citation shows up.

Watch this company

Inspection history

Inspection 347829988 OPENED OCT 2, 2024Closed

Referral · Partial · Safety · 1,650 employees at the site · Closed Jul 24, 2025

22602 Northwest Fwy, Cypress, TX 77429 · All Other Specialty Trade Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1910.1200(e)(1) · Hazard communication
Other-than-serious$13,005$9,754Feb 28, 2025Final
Citation 1, item 1b
29 CFR 1910.1200(g)(1) · Hazard communication
Other-than-serious$0$0Feb 28, 2025Final
Citation 1, item 1c
29 CFR 1910.1200(h)(1) · Hazard communication
Other-than-serious$0$0Feb 28, 2025Final
Citation 1, item 2
29 CFR 1926.300(b)(3) · Tools—Hand and Power: general requirements
Other-than-serious$16,550$12,412Feb 28, 2025Final

Inspection 347577447 OPENED JUN 26, 2024Closed

Planned · Partial · Health · 8 employees at the site · Closed Jun 28, 2024

1901 Creekside Drive Crownover Middle School, Corinth, TX 76210 · All Other Specialty Trade Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 346975014 OPENED SEP 14, 2023Closed

Unprogrammed other · Complete · Health · 16 employees at the site · Closed Oct 2, 2023

5675 Hobby Rd, Houston, TX 77053 · Highway, Street, and Bridge Construction · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 346798556 OPENED JUN 28, 2023Closed

Referral · Partial · Safety · 4 employees at the site · Closed Nov 22, 2023

7327 Hwy 87 N Little Cypress-mauriceville High School, Orange, TX 77632 · All Other Specialty Trade Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 345072052 OPENED DEC 14, 2020Closed

Follow-up · Partial · Health · 99 employees at the site · Closed Apr 12, 2021

7001 Culebra Street, San Antonio, TX 78245 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 344169123 OPENED JUL 22, 2019Closed

Fatality or catastrophe · Partial · Health · 890 employees at the site · Closed Aug 5, 2020

1602 27th St, Hondo, TX 78861 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps

Incident on Jul 19, 2019 (fatal): Employee removing rebar dies of heat stroke

At 5:45 p.m. on July 19, 2019, Employee #1, employed by a construction company, was engaged in heavy construction work during high temperatures at an outdoor athletic field. He was required to work a twelve-hour shift and had been working since 6:00 a.m. He was removing vertical rebar stakes when he became overheated. Employee #1 died of heat stroke.

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
OSH Act Section 5(a)(1) · General Duty Clause
Serious$132,598$13,260Dec 20, 2019Final
Citation 1, item 2
29 CFR 1926.20(b)(1) · Construction safety programs
Serious$13,260$13,260May 4, 2020Final
Citation 1, item 3
29 CFR 1926.35(a) · Employee emergency action plans
Serious$13,260$13,260May 4, 2020Final
Citation 1, item 4a
29 CFR 1926.50(a) · Medical services and first aid
Serious$13,260$13,260May 4, 2020Final
Citation 1, item 4b
29 CFR 1926.50(b) · Medical services and first aid
Serious$0$0May 4, 2020Final
Citation 1, item 4c
29 CFR 1926.50(c) · Medical services and first aid
Serious$0$0May 4, 2020Final
Citation 1, item 5
29 CFR 1926.51(a) · Sanitation
Serious$13,260$13,260May 4, 2020Final

Inspection 343320503 OPENED JUL 19, 2018Closed

Referral · Partial · Safety · 300 employees at the site · Closed Nov 2, 2018

8860 North Loop, El Paso, TX 79907 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps

Incident on Jun 17, 2018: Employee lacerates abdomen when struck by heavy machinery

At 7:45 a.m. on June 6, 2018, an employee was putting water into equipment that was overheating. The employee was struck by heavy machinery that was backing up, resulting lacerations to his abdomen.

No citations from this inspection.

Inspection 343290904 OPENED JUL 10, 2018Closed

Fatality or catastrophe · Complete · Health · 650 employees at the site · Closed Jan 8, 2019

751 Beach Street, Fort Worth, TX 76111 · Highway, Street, and Bridge Construction · OSHA's record · Phone and website on Google Maps

Incident on Jul 7, 2018 (fatal): Employee dies from possible heat stroke or heart attack

At 4:15 p.m. on July 7, 2018, Employee #1 was pouring an e-layer. The employee collapsed, but cause of death was not determined. It was believed to be from possible heat stroke, heart attack or chemical inhalation, or combination of these.

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.21(b)(2) · Construction safety training
Other-than-serious$12,934$12,934Dec 12, 2018Final
2 older inspections

Inspection 314383837 OPENED APR 29, 2010Closed

Planned · Partial · Safety · 2 employees at the site · Closed Apr 29, 2010

300 E Rancho Blanco, Pharr, TX 78577 · Site Preparation Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 308652379 OPENED MAY 30, 2006Closed

Unprogrammed other · Complete · Safety · 13 employees at the site · Closed Jun 1, 2006

1263-a North Main Street, Mansfield, TX 76063 · Other Building Finishing Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Severe injury reports

Employers must report any work-related amputation, in-patient hospitalization or loss of an eye to OSHA within 24 hours. 3 reports on file.

Sep 30, 2024, Cypress: Hospitalization, amputation · amputations involving bone loss · other finger(s) n.e.c.

An employee was cleaning up the jobsite, including an onsite mixing machine. The employee removed an access cover to the auger and the auger grabbed his gloved left hand, amputating the tips of his left index and ring fingers and his little finger at the third knuckle. The mixing machine was in operation at the time.

Jun 22, 2023, Orange: Hospitalization · electrocutions, electric shocks · body systems

An employee was assisting in setting up a protective liner along a fence line in the football field track area. When the employee went to gain support on a stadium light tower, he was shocked by an electrical panel. The employee lost consciousness, fell to the ground, and sustained contusions to the right cheek from the fall.

Jul 17, 2018, El Paso: Hospitalization · fractures · pelvis

An employee was adding water to the radiator of a piece of heavy equipment when a front end loader struck him. He suffered abdominal injuries and a broken pelvis and was hospitalized.

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.1200 · Hazard communication

29 CFR 1910.1200(e)(1)

(e) Written hazard communication program. (1) Employers shall develop, implement, and maintain at each workplace, a written hazard communication program which at least describes how the criteria specified in paragraphs (f), (g), and (h) of this section for labels and other forms of warning, safety data sheets, and employee information and training will be met, and which also includes the following:

29 CFR 1910.1200(g)(1)

(g) Safety data sheets. (1) Chemical manufacturers and importers shall obtain or develop a safety data sheet for each hazardous chemical they produce or import. Employers shall have a safety data sheet in the workplace for each hazardous chemical which they use.

29 CFR 1910.1200(h)(1)

(h) Employee information and training. (1) Employers shall provide employees with effective information and training on hazardous chemicals in their work area at the time of their initial assignment, and whenever a new chemical hazard the employees have not previously been trained about is introduced into their work area. Information and training may be designed to cover categories of hazards (e.g., flammability, carcinogenicity) or specific chemicals. Chemical-specific information must always be available through labels and safety data sheets.

29 CFR 1926.20 · Construction safety programs

29 CFR 1926.21 · Construction safety training

29 CFR 1926.300 · Tools—Hand and Power: general requirements

29 CFR 1926.35 · Employee emergency action plans

29 CFR 1926.50 · Medical services and first aid

29 CFR 1926.51 · Sanitation

OSH Act Section 5 · General Duty Clause

Other commercial and institutional building construction employers in Texas

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.