OSHA SearchOSHA records by employer

Keith Tucker: OSHA inspections and violations

Greenfield, Tennessee · Cut Stone and Stone Product Manufacturing · NAICS 327991

2inspections
18citation items
$3,500current penalties
Mar 1, 2018last inspection

Keith Tucker has 2 OSHA inspections on record in Tennessee, the first in 2018.

OSHA's last visit started on Mar 1, 2018 after a complaint, in Greenfield.

Across those inspections OSHA issued 18 citation items: 15 serious and 3 other-than-serious.

OSHA proposed $3,500 in penalties and the amount has not been reduced.

Most often, OSHA cited 1910.134, respiratory protection (6 items).

For context, across all manufacturing employers the median penalty per cited inspection since 2015 is $4,500. Keith Tucker averages $1,750 over 2 cited inspections in that time.

Keith Tucker: OSHA citation items per year, 2018 to 2018
Citation items per year, by inspection date.

Tennessee · latest 90 days of OSHA records

353employers cited

Get notified the morning OSHA posts each new citation in Tennessee: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Tennessee

Checking a subcontractor, a client or your own company? Watch Keith Tucker and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 342987971 OPENED MAR 1, 2018Closed

Complaint · Partial · Safety · 25 employees at the site · Closed May 18, 2018

439 Lily Pond Lane, Greenfield, TN 38230 · Cut Stone and Stone Product Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.22(a)(1) · Walking-working surfaces
Serious$600$600Apr 13, 2018Final
Citation 1, item 2
29 CFR 1910.22(a)(2) · Walking-working surfaces
Serious$600$600Apr 13, 2018Final
Citation 1, item 3
29 CFR 1910.106(e)(6)(ii) · Flammable liquids
Serious$600$600Apr 13, 2018Final
Citation 1, item 4
29 CFR 1910.151(b) · First aid and eyewash
Serious$500$500Apr 13, 2018Final
Citation 2, item 1
29 CFR 1910.305(g)(2)(iii) · Electrical wiring methods
Other-than-serious$0$0Apr 13, 2018Final

Inspection 343002408 OPENED MAR 1, 2018Closed

Complaint · Partial · Health · 25 employees at the site · Closed Aug 14, 2018

439 Lily Pond Lane, Greenfield, TN 38230 · Cut Stone and Stone Product Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1910.107(b)(5)(i) · Spray painting and finishing
Serious$500$500Jun 12, 2018Final
Citation 1, item 1b
29 CFR 1910.107(b)(5)(iv) · Spray painting and finishing
Serious$0$0Jun 12, 2018Final
Citation 1, item 1c
29 CFR 1910.107(b)(9) · Spray painting and finishing
Serious$0$0Jun 12, 2018Final
Citation 1, item 1d
29 CFR 1910.107(f)(4) · Spray painting and finishing
Serious$0$0Jun 12, 2018Final
Citation 1, item 1e
29 CFR 1910.107(g)(2) · Spray painting and finishing
Serious$0$0Jun 12, 2018Final
Citation 1, item 2a
29 CFR 1910.134(c)(1) · Respiratory protection
Serious$600$600Jun 12, 2018Final
Citation 1, item 2b
29 CFR 1910.134(e)(1) · Respiratory protection
Serious$0$0Jun 12, 2018Final
Citation 1, item 2c
29 CFR 1910.134(f)(1) · Respiratory protection
Serious$0$0Jun 12, 2018Final
Citation 1, item 2d
29 CFR 1910.134(g)(1)(iii) · Respiratory protection
Serious$0$0Jun 12, 2018Final
Citation 1, item 2e
29 CFR 1910.134(h)(2)(i) · Respiratory protection
Serious$0$0Jun 12, 2018Final
Citation 1, item 2f
29 CFR 1910.134(k)(1)(i) · Respiratory protection
Serious$0$0Jun 12, 2018Final
Citation 2, item 1a
29 CFR 1910.1200(e)(1) · Hazard communication
Other-than-serious$100$100Jun 12, 2018Final
Citation 2, item 1b
29 CFR 1910.1200(h) · Hazard communication
Other-than-serious$0$0Jun 12, 2018Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.106 · Flammable liquids

29 CFR 1910.106(e)(6)(ii)

(ii) Grounding. Category 1 or 2 flammable liquids, or Category 3 flammable liquids with a flashpoint below 100 °F (37.8 °C), shall not be dispensed into containers unless the nozzle and container are electrically interconnected. Where the metallic floorplate on which the container stands while filling is electrically connected to the fill stem or where the fill stem is bonded to the container during filling operations by means of a bond wire, the provisions of this section shall be deemed to have been complied with.

29 CFR 1910.107 · Spray painting and finishing

29 CFR 1910.107(b)(5)(i)

(i) The spraying operations except electrostatic spraying operations shall be so designed, installed and maintained that the average air velocity over the open face of the booth (or booth cross section during spraying operations) shall be not less than 100 linear feet per minute. Electrostatic spraying operations may be conducted with an air velocity over the open face of the booth of not less than 60 linear feet per minute, or more, depending on the volume of the finishing material being applied and its flammability and explosion characteristics. Visible gauges or audible alarm or pressure activated devices shall be installed to indicate or insure that the required air velocity is maintained. Filter rolls shall be inspected to insure proper replacement of filter media.

29 CFR 1910.107(b)(5)(iv)

(iv) Space within the spray booth on the downstream and upstream sides of filters shall be protected with approved automatic sprinklers.

29 CFR 1910.1200 · Hazard communication

29 CFR 1910.134 · Respiratory protection

29 CFR 1910.151 · First aid and eyewash

29 CFR 1910.22 · Walking-working surfaces

29 CFR 1910.305 · Electrical wiring methods

Other cut stone and stone product manufacturing employers in Tennessee

Alert subscribers get notified of each newly cited employer in Tennessee the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.