Inspection 347313249 OPENED FEB 29, 2024Closed
1165 East Walnut Street, Green Bay, WI 54301 · New Multifamily Housing Construction (except For-Sale Builders) · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
OSHA has inspected Lakeland Construction, Inc. 20 times in Wisconsin since 1995.
The latest one began on Feb 29, 2024 as a planned inspection, in Green Bay.
Those inspections ended with 41 citation items: 35 serious, 1 repeat and 5 other-than-serious.
Penalties were first proposed at $75,645 and now stand at $54,701, 28% lower after settlements or reviews.
Fall protection in construction comes up most often in these citations: 8 items under 1926.501.
How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and Lakeland Construction, Inc. averages $5,529 (5 cited inspections).
Wisconsin · latest 90 days of OSHA records
229employers cited
2 of them in the same industry
Get notified the morning OSHA posts each new citation in Wisconsin: the employer, the site address, the rules broken and the penalty.
See who gets cited nextLatest cited in Wisconsin
Checking a subcontractor, a client or your own company? Watch Lakeland Construction, Inc. and get notified the morning OSHA posts a new citation for it.
Watch this company1165 East Walnut Street, Green Bay, WI 54301 · New Multifamily Housing Construction (except For-Sale Builders) · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
533 Hickory Street, Wrightstown, WI 54180 · New Multifamily Housing Construction (except For-Sale Builders) · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1926.1402(b) · Ground conditions |
Serious | $4,144 | $2,900 | Jul 11, 2022 | Final |
112 West Papermill Run, Kimberly, WI 54136 · Framing Contractors · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1b 29 CFR 1926.501(b)(1) · Fall protection in construction |
Serious | $13,261 | $13,260 | Dec 17, 2019 | Final |
5715 N. Meade St., Appleton, WI 54913 · New Multifamily Housing Construction (except For-Sale Builders) · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1a 29 CFR 1926.502(d)(15) · Fall protection systems |
Serious | $2,173 | $2,897 | Nov 29, 2017 | Final |
| Citation 1, item 1b 29 CFR 1926.502(d)(16)(iii) · Fall protection systems |
Serious | $2,897 | $0 | Nov 29, 2017 | Final |
5715 N Meade Street, Appleton, WI 54913 · New Multifamily Housing Construction (except For-Sale Builders) · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1a 29 CFR 1926.20(b)(2) · Construction safety programs |
Serious | $5,070 | $5,070 | Nov 29, 2017 | Final |
| Citation 1, item 1b 29 CFR 1926.501(b)(13) · Fall protection in construction |
Serious | $0 | $0 | Nov 29, 2017 | Final |
401 N Washington, Green Bay, WI 54313 · New Multifamily Housing Construction (except For-Sale Builders) · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1926.300(a) · Tools—Hand and Power: general requirements |
Serious | $1,320 | $1,320 | Sep 16, 2015 | Final |
| Citation 1, item 2a 29 CFR 1926.501(b)(1) · Fall protection in construction |
Serious | $2,200 | $2,200 | Sep 16, 2015 | Final |
| Citation 1, item 2b 29 CFR 1926.501(b)(15) · Fall protection in construction |
Serious | $0 | $0 | Sep 16, 2015 | Final |
| Citation 1, item 2c 29 CFR 1926.503(b)(1) · Fall protection training in construction |
Serious | $0 | $0 | Sep 16, 2015 | Final |
| Citation 1, item 2d 29 CFR 1926.502(d)(11) · Fall protection systems |
Serious | $2,200 | $0 | Sep 16, 2015 | Final |
| Citation 1, item 2e 29 CFR 1926.502(d)(15) · Fall protection systems |
Serious | $0 | $0 | Sep 16, 2015 | Final |
W12929 Mcshane Drive, Muskego, WI 53150 · Framing Contractors · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1926.150(c)(1)(i) · Fire protection |
Other-than-serious | $3,080 | $0 | Apr 14, 2011 | Closed |
| Citation 1, item 4 29 CFR 1926.405(b)(1) · Job-site wiring |
Other-than-serious | $3,850 | $0 | Apr 14, 2011 | Closed |
| Citation 1, item 5a 29 CFR 1926.300(b)(1) · Tools—Hand and Power: general requirements |
Serious | $0 | $5,390 | Apr 14, 2011 | Closed |
| Citation 1, item 5b 29 CFR 1926.300(b)(5) · Tools—Hand and Power: general requirements |
Serious | $0 | $0 | Apr 14, 2011 | Closed |
Bennigans, 149 N. Mall Dr, Appleton, WI 54914 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1926.403(b)(1) · Electrical equipment on job sites |
Serious | $1,000 | $700 | Nov 8, 2010 | Closed |
| Citation 1, item 2a 29 CFR 1926.451(b)(1) · Scaffolds, general requirements |
Serious | $1,750 | $1,225 | Nov 8, 2010 | Closed |
| Citation 1, item 2b 29 CFR 1926.451(g)(4)(i) · Scaffolds, general requirements |
Serious | $0 | $0 | Nov 8, 2010 | Closed |
| Citation 1, item 3 29 CFR 1926.451(f)(3) · Scaffolds, general requirements |
Serious | $1,250 | $875 | Nov 8, 2010 | Closed |
3217 Fiddler Creek Drive, Waukesha, WI 53188 · Framing Contractors · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1926.1053(b)(4) · Ladders in construction |
Serious | $1,125 | $1,125 | Sep 22, 2009 | Closed |
Grandstay Suites 708 Niagara Ave, Sheboygan, WI 54220 · Framing Contractors · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1a 29 CFR 1926.20(b)(2) · Construction safety programs |
Serious | $2,500 | $2,000 | Aug 26, 2008 | Closed |
| Citation 1, item 1b 29 CFR 1926.25(b) · Housekeeping |
Serious | $0 | $0 | Aug 26, 2008 | Closed |
| Citation 1, item 2a 29 CFR 1926.50(d)(1) · Medical services and first aid |
Other-than-serious | $1,000 | $500 | Aug 26, 2008 | Closed |
| Citation 1, item 2b 29 CFR 1926.50(d)(2) · Medical services and first aid |
Other-than-serious | $0 | $0 | Aug 26, 2008 | Closed |
| Citation 1, item 3 29 CFR 1926.51(a)(1) · Sanitation |
Serious | $750 | $400 | Aug 26, 2008 | Closed |
131 East North Water, Neenah, WI 54956 · Framing Contractors · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1a 29 CFR 1926.21(b)(2) · Construction safety training |
Serious | $1,500 | $1,050 | Nov 8, 2007 | Closed |
| Citation 1, item 1b 29 CFR 1926.501(b)(1) · Fall protection in construction |
Serious | $0 | $0 | Nov 8, 2007 | Closed |
Hwy 41 & Cty Bb, Appleton, WI 54914 · Structural Steel and Precast Concrete Contractors · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
Condo Project Hwy Ii, Fremont, WI 54131 · Framing Contractors · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1926.453(b)(2)(v) · Aerial lifts |
Serious | $7,500 | $1,500 | Jun 30, 2004 | Closed |
| Citation 1, item 2 29 CFR 1926.501(b)(10) · Fall protection in construction |
Serious | $2,400 | $2,400 | Jun 30, 2004 | Closed |
400 Richmond, Appleton, WI 54914 · Framing Contractors · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1926.453(b)(2)(iv) · Aerial lifts |
Serious | $1,500 | $1,500 | Dec 16, 2003 | Closed |
| Citation 2, item 1 29 CFR 1926.453(b)(2)(v) · Aerial lifts |
Repeat | $3,000 | $3,000 | Dec 16, 2003 | Closed |
151 Dawes, Oshkosh, WI 54901 · New Multifamily Housing Construction (except For-Sale Builders) · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1926.501(b)(10) · Fall protection in construction |
Serious | $1,575 | $787 | Jul 9, 2003 | Closed |
400 Richmond, Appleton, WI 54914 · New Multifamily Housing Construction (except For-Sale Builders) · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1926.501(b)(1) · Fall protection in construction |
Serious | $1,575 | $787 | Jul 9, 2003 | Closed |
660 W. Ridgeview Dr, Appleton, WI 54911 · New Multifamily Housing Construction (except For-Sale Builders) · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 OSH Act Section 5(a)(1) · General Duty Clause |
Serious | $1,200 | $840 | Jan 14, 2003 | Closed |
4190 Boardwalk Court ( Grand Chute), Appleton, WI 54914 · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1926.453(b)(2)(v) · Aerial lifts |
Serious | $700 | $350 | Aug 20, 2002 | Closed |
| Citation 1, item 2 29 CFR 1926.102(a)(1) · Eye and face protection in construction |
Serious | $875 | $450 | Aug 20, 2002 | Closed |
Renaissance Building , Lois & 9th Street, De Pere, WI 54115 · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1926.451(b)(1) · Scaffolds, general requirements |
Serious | $1,750 | $900 | Jun 11, 1998 | Closed |
| Citation 1, item 2 29 CFR 1926.451(e)(1) · Scaffolds, general requirements |
Serious | $750 | $375 | Jun 11, 1998 | Closed |
| Citation 1, item 3 29 CFR 1926.451(g)(1) · Scaffolds, general requirements |
Serious | $1,750 | $900 | Jun 11, 1998 | Closed |
| Citation 2, item 1 29 CFR 1926.452(c)(2) · Rules for each type of scaffold |
Other-than-serious | $0 | $0 | Jun 11, 1998 | Closed |
1200 Jacobsen Avenue, Menasha, WI 54952 · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
Current text from the Code of Federal Regulations. Some citations were issued under older wording.
29 CFR 1926.102(a)(1)
(a) General. (1) The employer shall ensure that each affected employee uses appropriate eye or face protection when exposed to eye or face hazards from flying particles, molten metal, liquid chemicals, acids or caustic liquids, chemical gases or vapors, or potentially injurious light radiation.
29 CFR 1926.1053(b)(4)
(4) Ladders shall be used only for the purpose for which they were designed.
29 CFR 1926.1402(b)
(b) The equipment must not be assembled or used unless ground conditions are firm, drained, and graded to a sufficient extent so that, in conjunction (if necessary) with the use of supporting materials, the equipment manufacturer's specifications for adequate support and degree of level of the equipment are met. The requirement for the ground to be drained does not apply to marshes/wetlands.
Alert subscribers get notified of each newly cited employer in Wisconsin the morning it is posted. See the alert plans.
Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.