Inspection 342667946 OPENED AUG 21, 2017Closed
North Approach Merrimack River Rr Crossing, Haverhill, MA 01832 · Other Heavy and Civil Engineering Construction · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
Clinton, Massachusetts · Commercial and Institutional Building Construction · NAICS 236220
LM Heavy Civil Construction, LLC has 8 OSHA inspections on record in Massachusetts, the first in 2010.
OSHA's last visit started on Aug 21, 2017 as a planned inspection, in Haverhill.
Across those inspections OSHA issued 9 citation items: 8 serious and 1 other-than-serious.
OSHA proposed $26,690 in penalties. After settlements and reviews the total is $20,102, down 25%.
Most often, OSHA cited 1926.652, trench protection (2 items).
For context, across all construction employers the median penalty per cited inspection since 2015 is $3,080. LM Heavy Civil Construction, LLC averages $4,000 over 2 cited inspections in that time.
LM Heavy Civil Construction, LLC also files yearly injury logs with OSHA, summarized below.
It reported 1 severe injury to OSHA since 2015.
Massachusetts · latest 90 days of OSHA records
256employers cited
5 of them in the same industry
Get notified the morning OSHA posts each new citation in Massachusetts: the employer, the site address, the rules broken and the penalty.
See who gets cited nextLatest cited in Massachusetts
Checking a subcontractor, a client or your own company? Watch LM Heavy Civil Construction, LLC and get notified the morning OSHA posts a new citation for it.
Watch this companyNorth Approach Merrimack River Rr Crossing, Haverhill, MA 01832 · Other Heavy and Civil Engineering Construction · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
301 Broad Street, Fitchburg, MA 01420 · Other Heavy and Civil Engineering Construction · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
Market St. Lynnfield Phase 2 600 Market St., Lynnfield, MA 01940 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1926.20(b)(2) · Construction safety programs |
Serious | $2,000 | $1,000 | Jun 19, 2015 | Final |
Slab Bridge Road, Assonet, MA 02702 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 OSH Act Section 5(a)(1) · General Duty Clause |
Serious | $5,390 | $7,000 | Aug 5, 2015 | Final |
5 Woodland Road, Stoneham, MA 02180 · Water and Sewer Line and Related Structures Construction · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
13 Mechanic Street & Hancock Street, Quincy, MA 02169 · Other Heavy and Civil Engineering Construction · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
Farragut Road And East 1st Street, Boston, MA 02127 · Highway, Street, and Bridge Construction · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1926.651(c)(2) · Excavations |
Serious | $4,900 | $3,430 | Mar 14, 2011 | Closed |
| Citation 1, item 2 29 CFR 1926.651(k)(1) · Excavations |
Serious | $4,900 | $3,430 | Mar 14, 2011 | Closed |
| Citation 1, item 3a 29 CFR 1926.652(a)(1) · Trench protection |
Serious | $4,900 | $3,430 | Mar 14, 2011 | Closed |
| Citation 1, item 3b 29 CFR 1926.652(c) · Trench protection |
Serious | $0 | $0 | Mar 14, 2011 | Closed |
Water Street/nashua River, Clinton, MA 01510 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1926.106(c) · Working over or near water |
Other-than-serious | $975 | $0 | Jun 29, 2010 | Closed |
| Citation 1, item 2 29 CFR 1926.404(f)(6) · Ground-fault protection on job sites |
Serious | $1,625 | $812 | Jun 29, 2010 | Closed |
| Citation 1, item 3 29 CFR 1926.300(b)(1) · Tools—Hand and Power: general requirements |
Serious | $2,000 | $1,000 | Jun 29, 2010 | Closed |
From the Form 300A summaries employers file with OSHA each year. Rate = recordable cases per 100 full-time workers.
In 2016, the Quincy site logged 8 recordable injuries or illnesses among about 134 workers: 6.4 per 100 full-time workers, against a median of 0.0 for its industry.
| Site and year | Workers | Cases | Days-away cases | Rate | Industry median |
|---|---|---|---|---|---|
| LM Heavy Civil Construction Quincy · 2016 | 134 | 8 | 0 | 6.4 | 0.0 |
Employers must report any work-related amputation, in-patient hospitalization or loss of an eye to OSHA within 24 hours. 1 report on file.
Apr 16, 2015, Assonet: Hospitalization · crushing injuries · leg(s), unspecified
An employee suffered a crushing injury to his right leg when the excavator that he was walking behind stopped and backed up.
Current text from the Code of Federal Regulations. Some citations were issued under older wording.
29 CFR 1926.106(c)
(c) Ring buoys with at least 90 feet of line shall be provided and readily available for emergency rescue operations. Distance between ring buoys shall not exceed 200 feet.
29 CFR 1926.20(b)(2)
(2) Such programs shall provide for frequent and regular inspections of the job sites, materials, and equipment to be made by competent persons designated by the employers.
29 CFR 1926.300(b)(1)
(b) Guarding. (1) When power operated tools are designed to accommodate guards, they shall be equipped with such guards when in use.
Alert subscribers get notified of each newly cited employer in Massachusetts the morning it is posted. See the alert plans.
Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.