MTZ Framing, LLC: OSHA inspections and violations

East Boston, Massachusetts · Framing Contractors · NAICS 238130

1inspections
7citation items
$12,457current penalties
Aug 25, 2025last inspection

OSHA inspectors have visited MTZ Framing, LLC in Massachusetts one time.

It opened on Aug 25, 2025 after a complaint, in East Boston and is still open.

In all, OSHA issued 7 citation items: 6 serious and 1 other-than-serious.

The penalties, $12,457 in total, stand where OSHA first set them.

The rule cited most here is 1926.502 (fall protection systems), 2 times.

Among construction employers, the typical cited inspection since 2015 ends with a $3,080 penalty. MTZ Framing, LLC averages $12,457 across 1 cited inspection.

MTZ Framing, LLC: OSHA citation items per year, 2025 to 2025
Citation items per year, by inspection date.

Massachusetts · latest 90 days of OSHA records

235employers cited

17 of them in the same industry

Get notified the morning OSHA posts each new citation in Massachusetts: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Massachusetts

Checking a subcontractor, a client or your own company? Watch MTZ Framing, LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 348463415 OPENED AUG 25, 2025Open

Complaint · Partial · Safety · 3 employees at the site · Open

155 Proctor Street, East Boston, MA 02128 · Framing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.20(b)(2) · Construction safety programs
Serious$2,128$2,128Jan 30, 2026Final
Citation 1, item 2
29 CFR 1926.34(b) · Means of egress
Serious$2,128$2,128Jan 30, 2026Final
Citation 1, item 3
29 CFR 1926.150(a)(2) · Fire protection
Serious$2,128$2,128Jan 30, 2026Final
Citation 1, item 4
29 CFR 1926.150(c)(1)(iv) · Fire protection
Serious$2,128$2,128Jan 30, 2026Final
Citation 1, item 5a
29 CFR 1926.502(b)(1) · Fall protection systems
Serious$3,547$3,547Jan 30, 2026Final
Citation 1, item 5b
29 CFR 1926.502(i)(3) · Fall protection systems
Serious$0$0Jan 30, 2026Final
Citation 2, item 1
29 CFR 1903.19(c)(1) · Proving cited hazards were fixed
Other-than-serious$398$398Jun 11, 2026Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1903.19 · Proving cited hazards were fixed

29 CFR 1903.19(c)(1)

(c) Abatement certification. (1) Within 10 calendar days after the abatement date, the employer must certify to OSHA (the Agency) that each cited violation has been abated, except as provided in paragraph (c)(2) of this section.

29 CFR 1926.150 · Fire protection

29 CFR 1926.150(a)(2)

(2) Access to all available firefighting equipment shall be maintained at all times.

29 CFR 1926.150(c)(1)(iv)

(iv) One or more fire extinguishers, rated not less than 2A, shall be provided on each floor. In multistory buildings, at least one fire extinguisher shall be located adjacent to stairway.

29 CFR 1926.20 · Construction safety programs

29 CFR 1926.34 · Means of egress

29 CFR 1926.502 · Fall protection systems

Other framing contractors employers in Massachusetts

Alert subscribers get notified of each newly cited employer in Massachusetts the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.