Inspection 340746767 OPENED JUL 1, 2015Closed
1305 Morrow Avenue, North Chicago, IL 60064 · Fabricated Structural Metal Manufacturing · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1a 29 CFR 1910.147(c)(4)(ii) · Lockout/tagout |
Other-than-serious | $3,080 | $200 | Sep 11, 2015 | Final |
| Citation 1, item 1b 29 CFR 1910.147(c)(6)(i) · Lockout/tagout |
Other-than-serious | $0 | $200 | Sep 11, 2015 | Final |
| Citation 1, item 2 29 CFR 1910.147(c)(5)(i) · Lockout/tagout |
Other-than-serious | $3,080 | $200 | Sep 11, 2015 | Final |
| Citation 1, item 3 29 CFR 1910.178(l)(2)(ii) · Forklifts and other powered industrial trucks |
Serious | $2,200 | $1,200 | Sep 11, 2015 | Final |
| Citation 1, item 4a 29 CFR 1910.178(q)(1) · Forklifts and other powered industrial trucks |
Other-than-serious | $1,760 | $0 | Sep 11, 2015 | Final |
| Citation 1, item 4b 29 CFR 1910.178(q)(7) · Forklifts and other powered industrial trucks |
Other-than-serious | $0 | $0 | Sep 11, 2015 | Final |
| Citation 1, item 5 29 CFR 1910.212(a)(1) · Machine guarding |
Serious | $1,320 | $1,000 | Sep 11, 2015 | Final |
| Citation 1, item 6a 29 CFR 1910.219(d)(1) · Belts, pulleys and power-transmission parts |
Serious | $2,200 | $1,200 | Sep 11, 2015 | Final |
| Citation 1, item 6b 29 CFR 1910.219(e)(1)(i) · Belts, pulleys and power-transmission parts |
Serious | $0 | $0 | Sep 11, 2015 | Final |
| Citation 1, item 7 29 CFR 1910.305(g)(2)(iii) · Electrical wiring methods |
Serious | $1,760 | $1,000 | Sep 11, 2015 | Final |