Inspection 344196597 OPENED JUL 31, 2019Closed
244 Burnham Intervale Rd, Contoocook, NH 03229 · All Other Miscellaneous Fabricated Metal Product Manufacturing · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
Contoocook, New Hampshire · Sheet Metal Work Manufacturing · NAICS 332322
OSHA has inspected Prototek Sheetmetal Fabrication, LLC 5 times in New Hampshire since 2013.
The latest one began on Jul 31, 2019 after a complaint, in Contoocook.
Those inspections ended with 17 citation items: 11 serious, 1 repeat and 5 other-than-serious.
Penalties were first proposed at $52,150 and now stand at $20,700, 60% lower after settlements or reviews.
Noise comes up most often in these citations: 3 items under 1910.95.
How that compares: the median penalty per cited inspection for manufacturing employers since 2015 is $3,600, and Prototek Sheetmetal Fabrication, LLC averages $5,383 (3 cited inspections).
Prototek Sheetmetal Fabrication, LLC also files yearly injury logs with OSHA, summarized below.
New Hampshire · latest 90 days of OSHA records
52employers cited
Get notified the morning OSHA posts each new citation in New Hampshire: the employer, the site address, the rules broken and the penalty.
See who gets cited nextLatest cited in New Hampshire
Checking a subcontractor, a client or your own company? Watch Prototek Sheetmetal Fabrication, LLC and get notified the morning OSHA posts a new citation for it.
Watch this company244 Burnham Intervale Rd, Contoocook, NH 03229 · All Other Miscellaneous Fabricated Metal Product Manufacturing · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
244 Burnham Intervale Rd, Contoocook, NH 03229 · All Other Miscellaneous Fabricated Metal Product Manufacturing · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1910.134(k)(6) · Respiratory protection |
Other-than-serious | $0 | $0 | Jun 10, 2016 | Final |
| Citation 1, item 2 29 CFR 1910.1026(d)(1) · Hexavalent chromium |
Other-than-serious | $0 | $0 | Jun 10, 2016 | Final |
244 Burnham Intervale Road, Contoocook, NH 03229 · Sheet Metal Work Manufacturing · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1910.107(b)(5)(i) · Spray painting and finishing |
Serious | $3,850 | $2,000 | Mar 31, 2016 | Final |
| Citation 1, item 2 29 CFR 1910.212(a)(1) · Machine guarding |
Other-than-serious | $3,850 | $0 | Mar 31, 2016 | Final |
| Citation 1, item 3 29 CFR 1910.303(f)(1) · Electrical equipment, general requirements |
Other-than-serious | $3,850 | $0 | Mar 31, 2016 | Final |
| Citation 2, item 1 29 CFR 1910.242(b) · Hand and power tools |
Repeat | $7,700 | $4,000 | Mar 31, 2016 | Final |
244 Burnham Intervale Road, Contoocook, NH 03229 · Sheet Metal Work Manufacturing · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1a 29 CFR 1910.95(g)(5)(i) · Noise |
Serious | $4,900 | $4,900 | Mar 26, 2015 | Final |
| Citation 1, item 1b 29 CFR 1910.95(i)(2)(i) · Noise |
Serious | $4,900 | $0 | Mar 26, 2015 | Final |
| Citation 1, item 1c 29 CFR 1910.95(k)(1) · Noise |
Serious | $3,500 | $0 | Mar 26, 2015 | Final |
| Citation 1, item 4 29 CFR 1910.178(m)(5)(i) · Forklifts and other powered industrial trucks |
Serious | $3,500 | $1,750 | Mar 26, 2015 | Final |
| Citation 1, item 5a 29 CFR 1910.219(c)(2)(i) · Belts, pulleys and power-transmission parts |
Serious | $3,500 | $1,750 | Mar 26, 2015 | Final |
| Citation 1, item 5b 29 CFR 1910.219(c)(4)(i) · Belts, pulleys and power-transmission parts |
Serious | $0 | $0 | Mar 26, 2015 | Final |
| Citation 1, item 6 29 CFR 1910.242(b) · Hand and power tools |
Serious | $3,500 | $1,750 | Mar 26, 2015 | Final |
244 Burnham Intervale Road, Contoocook, NH 03229 · Sheet Metal Work Manufacturing · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1910.37(b)(2) · Exit routes |
Serious | $2,100 | $1,050 | Oct 24, 2013 | Final |
| Citation 1, item 2 29 CFR 1910.134(c)(1) · Respiratory protection |
Serious | $2,800 | $1,400 | Oct 24, 2013 | Final |
| Citation 1, item 3 29 CFR 1910.151(c) · First aid and eyewash |
Serious | $3,500 | $1,750 | Oct 24, 2013 | Final |
| Citation 2, item 1 29 CFR 1904.29(b)(3) · Injury and illness log |
Other-than-serious | $700 | $350 | Oct 24, 2013 | Final |
From the Form 300A summaries employers file with OSHA each year. Rate = recordable cases per 100 full-time workers.
In 2017, the Contoocook site logged 7 recordable injuries or illnesses among about 80 workers: 7.4 per 100 full-time workers, against a median of 2.3 for its industry. Those cases cost 3 days away from work.
| Site and year | Workers | Cases | Days-away cases | Rate | Industry median |
|---|---|---|---|---|---|
| Prototek Sheetmetal Fabrication, LLC Contoocook · 2017 | 80 | 7 | 2 | 7.4 | 2.3 |
Current text from the Code of Federal Regulations. Some citations were issued under older wording.
29 CFR 1904.29(b)(3)
(3) How quickly must each injury or illness be recorded? You must enter each recordable injury or illness on the OSHA 300 Log and 301 Incident Report within seven (7) calendar days of receiving information that a recordable injury or illness has occurred.
29 CFR 1910.1026(d)(1)
(d) Exposure determination—(1) General. Each employer who has a workplace or work operation covered by this section shall determine the 8-hour TWA exposure for each employee exposed to chromium (VI). This determination shall be made in accordance with either paragraph (d)(2) or paragraph (d)(3) of this section.
29 CFR 1910.107(b)(5)(i)
(i) The spraying operations except electrostatic spraying operations shall be so designed, installed and maintained that the average air velocity over the open face of the booth (or booth cross section during spraying operations) shall be not less than 100 linear feet per minute. Electrostatic spraying operations may be conducted with an air velocity over the open face of the booth of not less than 60 linear feet per minute, or more, depending on the volume of the finishing material being applied and its flammability and explosion characteristics. Visible gauges or audible alarm or pressure activated devices shall be installed to indicate or insure that the required air velocity is maintained. Filter rolls shall be inspected to insure proper replacement of filter media.
Alert subscribers get notified of each newly cited employer in New Hampshire the morning it is posted. See the alert plans.
Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.