OSHA SearchOSHA records by employer

Ready Mix USA, LLC: OSHA inspections and violations

Birmingham, Alabama · Ready-Mix Concrete Manufacturing · NAICS 327320

8inspections
2citation items
$0current penalties
Sep 19, 2025last inspection

Ready Mix USA, LLC has 8 OSHA inspections on record in Alabama, the first in 2015.

OSHA's last visit started on Sep 19, 2025 on a referral, in Birmingham.

Across those inspections OSHA issued 2 citation items: 2 other-than-serious.

OSHA did not attach a penalty to any of these citations.

Most often, OSHA cited 1910.178, forklifts and other powered industrial trucks (2 items).

For context, across all manufacturing employers the median penalty per cited inspection since 2015 is $4,500. Ready Mix USA, LLC averages $0 over 2 cited inspections in that time.

It reported 1 severe injury to OSHA since 2015.

Ready Mix USA, LLC: OSHA citation items per year, 2015 to 2025
Citation items per year, by inspection date.

Alabama · latest 90 days of OSHA records

99employers cited

Get notified the morning OSHA posts each new citation in Alabama: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Alabama

Checking a subcontractor, a client or your own company? Watch Ready Mix USA, LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 348516394 OPENED SEP 19, 2025Closed

Referral · Complete · Safety · 15 employees at the site · Closed Feb 25, 2026

2651 Ruffner Road, Birmingham, AL 35210 · Cement Manufacturing · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 347287112 OPENED FEB 16, 2024Closed

Planned · Complete · Health · 1,255 employees at the site · Closed May 29, 2024

2565 Ruffner Rd, Birmingham, AL 35210 · Ready-Mix Concrete Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.178(l)(1)(i) · Forklifts and other powered industrial trucks
Other-than-serious$0$0Apr 30, 2024Final

Inspection 344629613 OPENED FEB 13, 2020Closed

Planned · Partial · Health · 7 employees at the site · Closed May 8, 2020

2620 E Three Notch, Andalusia, AL 36420 · Ready-Mix Concrete Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.178(l)(6) · Forklifts and other powered industrial trucks
Other-than-serious$0$0Feb 24, 2020Final

Inspection 343739884 OPENED JAN 22, 2019Closed

Planned · No inspection · Health · 30 employees at the site · Closed Feb 14, 2019

2101 Poplar St, Opelika, AL 36804 · Ready-Mix Concrete Manufacturing · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 341946226 OPENED DEC 2, 2016Closed

Planned · Complete · Health · 21 employees at the site · Closed Jan 18, 2017

21551 Doc Mcduffie Road, Foley, AL 36535 · Ready-Mix Concrete Manufacturing · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 341181220 OPENED JAN 13, 2016Closed

Planned · Partial · Health · 6 employees at the site · Closed Jan 21, 2016

212 Us Hwy 29 S, Troy, AL 36079 · Ready-Mix Concrete Manufacturing · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 341117752 OPENED DEC 14, 2015Closed

Planned · Partial · Health · 9 employees at the site · Closed Dec 22, 2015

4751 Hamilton Blvd, Theodore, AL 36582 · Concrete Block and Brick Manufacturing · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 341060804 OPENED NOV 17, 2015Closed

Planned · No inspection · Health · 10 employees at the site · Closed Nov 17, 2015

1730 Hwy 21, Atmore, AL 36502 · Ready-Mix Concrete Manufacturing · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Severe injury reports

Employers must report any work-related amputation, in-patient hospitalization or loss of an eye to OSHA within 24 hours. 1 report on file.

Jul 15, 2022, Birmingham: Amputation · amputations · fingertip(s)

On July 15, 2022, a ready-mix truck driver was at a job site pouring concrete. He attached an extension chute to the primary chute (needing to force it into place because of concrete buildup) and began lowering the chutes. His right hand was caught between the two chutes, and the index fingertip was amputated.

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.178 · Forklifts and other powered industrial trucks

29 CFR 1910.178(l)(1)(i)

(l) Operator training. (1) Safe operation. (i) The employer shall ensure that each powered industrial truck operator is competent to operate a powered industrial truck safely, as demonstrated by the successful completion of the training and evaluation specified in this paragraph (l).

29 CFR 1910.178(l)(6)

(6) Certification. The employer shall certify that each operator has been trained and evaluated as required by this paragraph (l). The certification shall include the name of the operator, the date of the training, the date of the evaluation, and the identity of the person(s) performing the training or evaluation.

Other ready-mix concrete manufacturing employers in Alabama

Alert subscribers get notified of each newly cited employer in Alabama the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.