OSHA SearchOSHA records by employer

Red Valve Company: OSHA inspections and violations

Carnegie, Pennsylvania · Industrial Valve Manufacturing · NAICS 332911

9inspections
15citation items
$4,075current penalties
Jun 12, 2026last inspection

OSHA has inspected Red Valve Company 9 times in Pennsylvania since 1978.

The latest one began on Jun 12, 2026 as a planned inspection, in Pittsburgh.

Those inspections ended with 15 citation items: 7 serious and 8 other-than-serious.

Penalties were first proposed at $6,226 and now stand at $4,075, 35% lower after settlements or reviews.

Spray painting and finishing comes up most often in these citations: 6 items under 1910.107.

How that compares: the median penalty per cited inspection for manufacturing employers since 2015 is $3,600, and Red Valve Company averages $3,825 (1 cited inspection).

Red Valve Company also files yearly injury logs with OSHA, summarized below.

Red Valve Company: OSHA citation items per year, 1978 to 2026
Citation items per year, by inspection date.

Pennsylvania · latest 90 days of OSHA records

280employers cited

Get notified the morning OSHA posts each new citation in Pennsylvania: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Pennsylvania

Checking a subcontractor, a client or your own company? Watch Red Valve Company and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 348996042 OPENED JUN 12, 2026Closed

Planned · No inspection · Health · 10 employees at the site · Closed Jun 18, 2026

750 Holiday Drive, Pittsburgh, PA 15220 · Industrial Valve Manufacturing · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 343571659 OPENED OCT 26, 2018Closed

Planned · No inspection · Health · Closed Nov 1, 2018

500 North Bell Avenue, Carnegie, PA 15106 · Fluid Power Valve and Hose Fitting Manufacturing · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 341243202 OPENED FEB 11, 2016Closed

Planned · Partial · Health · 15 employees at the site · Closed May 27, 2016

500 North Bell Avenue, Carnegie, PA 15106 · Fluid Power Valve and Hose Fitting Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.107(b)(5)(ii) · Spray painting and finishing
Serious$3,825$3,825Mar 11, 2016Final
Citation 1, item 2
29 CFR 1910.107(b)(9) · Spray painting and finishing
Other-than-serious$1,951$0Mar 11, 2016Final

Inspection 339194425 OPENED JUL 2, 2013Closed

Planned · No inspection · Health · Closed Jul 2, 2013

700 North Bell Avenue, Carnegie, PA 15106 · Industrial Valve Manufacturing · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 792572 OPENED SEP 21, 1987Closed

Planned · No inspection · Safety · Closed Sep 29, 1987

Building Iv On North Bell Avenue, Carnegie, PA 15106 · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 12915831 OPENED AUG 11, 1983Closed

Planned · Records only · Safety · 26 employees at the site · Closed Aug 23, 1983

600 North Bell Avenue, Carnegie, PA 15106 · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 12848131 OPENED FEB 1, 1982Closed

Planned · Records only · Safety · 22 employees at the site · Closed Feb 4, 1982

513 Bell Ave, Carnegie, PA 15102 · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 12951935 OPENED SEP 19, 1978Closed

Planned · Complete · Safety · 12 employees at the site · Closed Mar 10, 1984

513 Bell Avenue, Carnegie, PA 15102 · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

1 older inspection

Inspection 12951851 OPENED AUG 11, 1978Closed

Planned · Complete · Safety · 12 employees at the site · Closed Apr 12, 1979

513 Bell Avenue, Carnegie, PA 15102 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.23(c)(1) · Guarding floor and wall openings and holes
Serious$150$50Aug 29, 1978Contested
Citation 1, item 2
29 CFR 1910.23(d)(1)(ii) · Guarding floor and wall openings and holes
Serious$150$50Aug 29, 1978Contested
Citation 1, item 3a
29 CFR 1910.107(g)(7) · Spray painting and finishing
Serious$150$150Aug 29, 1978Contested
Citation 1, item 3b
29 CFR 1910.107(g)(3) · Spray painting and finishing
Serious$0$0Aug 29, 1978Contested
Citation 1, item 3c
29 CFR 1910.107(e)(2) · Spray painting and finishing
Serious$0$0Aug 29, 1978Contested
Citation 1, item 3d
29 CFR 1910.107(b)(9) · Spray painting and finishing
Serious$0$0Aug 29, 1978Contested
Citation 2, item 1
29 CFR 1910.36(b)(4) · Exit route design
Other-than-serious$0$0Aug 29, 1978Closed
Citation 2, item 2
29 CFR 1910.134(f)(3) · Respiratory protection
Other-than-serious$0$0Aug 29, 1978Closed
Citation 2, item 3
29 CFR 1910.178(l) · Forklifts and other powered industrial trucks
Other-than-serious$0$0Aug 29, 1978Closed
Citation 2, item 4
29 CFR 1910.178(p)(1) · Forklifts and other powered industrial trucks
Other-than-serious$0$0Aug 29, 1978Closed
Citation 2, item 5
29 CFR 1910.212(a)(1) · Machine guarding
Other-than-serious$0$0Aug 29, 1978Closed
Citation 2, item 6
29 CFR 1910.219(e)(1)(i) · Belts, pulleys and power-transmission parts
Other-than-serious$0$0Aug 29, 1978Closed
Citation 2, item 7
29 CFR 1910.252(a)(2)(ivc) · Welding fire safety
Other-than-serious$0$0Aug 29, 1978Closed

Injury and illness logs

From the Form 300A summaries employers file with OSHA each year. Rate = recordable cases per 100 full-time workers.

In 2022, the Pittsburgh site logged 0 recordable injuries or illnesses among about 31 workers: 0.0 per 100 full-time workers, against a median of 2.4 for its industry.

Site and yearWorkersCasesDays-away casesRateIndustry median
Red Valve Pittsburgh
Pittsburgh · 2022
31 000.02.4

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.107 · Spray painting and finishing

29 CFR 1910.107(b)(5)(ii)

(ii) All discarded filter pads and filter rolls shall be immediately removed to a safe, well-detached location or placed in a water-filled metal container and disposed of at the close of the day's operation unless maintained completely in water.

29 CFR 1910.107(b)(9)

(9) Cleaning. Spray booths shall be so installed that all portions are readily accessible for cleaning. A clear space of not less than 3 feet on all sides shall be kept free from storage or combustible construction.

29 CFR 1910.107(e)(2)

(2) Quantity. The quantity of flammable liquids or liquids with a flashpoint greater than 199.4 °F (93 °C) kept in the vicinity of spraying operations shall be the minimum required for operations and should ordinarily not exceed a supply for 1 day or one shift. Bulk storage of portable containers of flammable liquids or liquids with a flashpoint greater than 199.4 °F (93 °C) shall be in a separate, constructed building detached from other important buildings or cut off in a standard manner.

29 CFR 1910.134 · Respiratory protection

29 CFR 1910.178 · Forklifts and other powered industrial trucks

29 CFR 1910.212 · Machine guarding

29 CFR 1910.219 · Belts, pulleys and power-transmission parts

29 CFR 1910.23 · Guarding floor and wall openings and holes

29 CFR 1910.252 · Welding fire safety

29 CFR 1910.36 · Exit route design

Other industrial valve manufacturing employers in Pennsylvania

Alert subscribers get notified of each newly cited employer in Pennsylvania the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.