Inspection 347616534 OPENED JUL 22, 2024Closed
155 Beaver Street, Akron, OH 44304 · Other Personal and Household Goods Repair and Maintenance · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
OSHA has inspected Roetman's Welding LLC 3 times in Ohio since 2021.
The latest one began on Jul 22, 2024 after a complaint, in Akron.
Those inspections ended with 20 citation items: 16 serious, 1 repeat and 3 other-than-serious.
Penalties were first proposed at $31,651 and now stand at $9,640, 70% lower after settlements or reviews.
Spray painting and finishing comes up most often in these citations: 7 items under 1910.107.
How that compares: the median penalty per cited inspection for repair and personal services employers since 2015 is $1,200, and Roetman's Welding LLC averages $4,820 (2 cited inspections).
Ohio · latest 90 days of OSHA records
267employers cited
Get notified the morning OSHA posts each new citation in Ohio: the employer, the site address, the rules broken and the penalty.
See who gets cited nextLatest cited in Ohio
Checking a subcontractor, a client or your own company? Watch Roetman's Welding LLC and get notified the morning OSHA posts a new citation for it.
Watch this company155 Beaver Street, Akron, OH 44304 · Other Personal and Household Goods Repair and Maintenance · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
155 Beaver Street, Akron, OH 44304 · Other Personal and Household Goods Repair and Maintenance · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1910.134(f)(2) · Respiratory protection |
Repeat | $4,148 | $0 | Oct 7, 2024 | Final |
| Citation 2, item 1 29 CFR 1910.134(m)(2)(ii) · Respiratory protection |
Other-than-serious | $0 | $0 | Oct 7, 2024 | Final |
155 Beaver Street, Akron, OH 44304 · Other Personal and Household Goods Repair and Maintenance · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1910.95(c)(1) · Noise |
Serious | $2,926 | $1,024 | Dec 8, 2021 | Final |
| Citation 1, item 2a 29 CFR 1910.107(b)(1) · Spray painting and finishing |
Serious | $3,511 | $1,229 | Dec 8, 2021 | Final |
| Citation 1, item 2b 29 CFR 1910.107(b)(2) · Spray painting and finishing |
Serious | $0 | $0 | Dec 8, 2021 | Final |
| Citation 1, item 2c 29 CFR 1910.107(g)(2) · Spray painting and finishing |
Serious | $0 | $0 | Dec 8, 2021 | Final |
| Citation 1, item 3a 29 CFR 1910.107(b)(10) · Spray painting and finishing |
Serious | $3,511 | $1,229 | Dec 8, 2021 | Final |
| Citation 1, item 3b 29 CFR 1910.107(c)(5) · Spray painting and finishing |
Serious | $0 | $0 | Dec 8, 2021 | Final |
| Citation 1, item 4 29 CFR 1910.107(d)(2) · Spray painting and finishing |
Serious | $3,511 | $1,229 | Dec 8, 2021 | Final |
| Citation 1, item 5a 29 CFR 1910.134(c)(1) · Respiratory protection |
Serious | $1,755 | $614 | Dec 8, 2021 | Final |
| Citation 1, item 5b 29 CFR 1910.134(e)(1) · Respiratory protection |
Serious | $0 | $0 | Dec 8, 2021 | Final |
| Citation 1, item 5c 29 CFR 1910.134(f)(2) · Respiratory protection |
Serious | $0 | $0 | Dec 8, 2021 | Final |
| Citation 1, item 5d 29 CFR 1910.134(k)(1) · Respiratory protection |
Serious | $0 | $0 | Dec 8, 2021 | Final |
| Citation 1, item 6 29 CFR 1910.178(l)(1)(i) · Forklifts and other powered industrial trucks |
Serious | $3,511 | $1,229 | Dec 8, 2021 | Final |
| Citation 1, item 7 29 CFR 1910.212(a)(3)(ii) · Machine guarding |
Serious | $4,096 | $1,448 | Dec 8, 2021 | Final |
| Citation 1, item 8 29 CFR 1910.253(b)(4)(iii) · Gas welding and cutting |
Serious | $2,341 | $819 | Dec 8, 2021 | Final |
| Citation 1, item 9a 29 CFR 1910.1200(e)(1) · Hazard communication |
Serious | $2,341 | $819 | Dec 8, 2021 | Final |
| Citation 1, item 9b 29 CFR 1910.1200(h)(1) · Hazard communication |
Serious | $0 | $0 | Dec 8, 2021 | Final |
| Citation 2, item 1 29 CFR 1910.132(d)(1) · Personal protective equipment, general requirements |
Other-than-serious | $0 | $0 | Dec 8, 2021 | Final |
| Citation 2, item 2 29 CFR 1910.107(g)(7) · Spray painting and finishing |
Other-than-serious | $0 | $0 | Dec 8, 2021 | Final |
Current text from the Code of Federal Regulations. Some citations were issued under older wording.
29 CFR 1910.107(b)(1)
(b) Spray booths—(1) Construction. Spray booths shall be substantially constructed of steel, securely and rigidly supported, or of concrete or masonry except that aluminum or other substantial noncombustible material may be used for intermittent or low volume spraying. Spray booths shall be designed to sweep air currents toward the exhaust outlet.
29 CFR 1910.107(b)(10)
(10) Illumination. When spraying areas are illuminated through glass panels or other transparent materials, only fixed lighting units shall be used as a source of illumination. Panels shall effectively isolate the spraying area from the area in which the lighting unit is located, and shall be of a noncombustible material of such a nature or so protected that breakage will be unlikely. Panels shall be so arranged that normal accumulations of residue on the exposed surface of the panel will not be raised to a dangerous temperature by radiation or conduction from the source of illumination.
29 CFR 1910.107(b)(2)
(2) Interiors. The interior surfaces of spray booths shall be smooth and continuous without edges and otherwise designed to prevent pocketing of residues and facilitate cleaning and washing without injury.
Alert subscribers get notified of each newly cited employer in Ohio the morning it is posted. See the alert plans.
Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.