S.A. Halac Iron Works, Inc. has 24 OSHA inspections on record in Maryland, the first in 2003.
OSHA's last visit started on Mar 19, 2026 as a planned inspection, in Millersville.
Across those inspections OSHA issued 37 citation items: 15 serious, 1 repeat and 21 other-than-serious.
OSHA proposed $34,436 in penalties. After settlements and reviews the total is $16,657, down 52%.
Most often, OSHA cited 1926.701, concrete and masonry construction: general requirements (4 items).
For context, across all construction employers the median penalty per cited inspection since 2015 is $3,080. S.A. Halac Iron Works, Inc. averages $718 over 4 cited inspections in that time.
Citation items per year, by inspection date.
Maryland · latest 90 days of OSHA records
175employers cited
3 of them in the same industry
Get notified the morning OSHA posts each new citation in Maryland: the employer, the site address, the rules broken and the penalty.
Checking a subcontractor, a client or your own company? Watch S.A. Halac Iron Works, Inc. and get notified the morning OSHA posts a new citation for it.
OSHA records show S.A. Halac Iron Works, Inc. at 24 sites in 2 states. Together they've had 31 inspections and $142,546 in current penalties.
We match records by employer name and industry, so these sites are likely the same company, not certainly. Franchises and subsidiaries can file under one name.
Included with any plan: the site-by-site record for all 24 sites, with repeat and willful violations and citations per year for the whole company. Already a subscriber? Sign in.
Incident on Nov 10, 2020: Employee falls while welding joist and fractures leg and arm
At 11:00 a.m. on November 10, 2020, Employee #1 was welding a joist when they unhooked from a beam clamp to move it. The employee slipped and fell, landing on the concrete floor. Emergency services transported Employee #1 to the hospital, where he was admitted and treated for a broken left leg and arm.
No citations from this inspection.
Inspection 343055455 OPENED MAR 28, 2018Closed
Planned · Complete · Safety · 6 employees at the site · Closed Apr 4, 2018
Incident on Aug 18, 2005: Employee sustains fractures in fall off roof
On August 18, 2005, Employee #1 and a coworker were connecting steel bar joists for the roof of a wing of a school. They were working 14-ft, 1-inch above the gr ound. Both were wearing fall protection harnesses, but neither was tied off beca use they were performing connecting work. The bar joists were being set by using the "Christmas tree" method. The coworker was performing the welding and bolt c onnection process, and Employee #1 was unhooking the rigging equipment after the bar joist was welded. After a bar joist had been welded, Employee #1 straddled it and moved himself to the middle. He unhooked the choker and tried to move it out of the way. The crane operator did not have the load centered, and Employee #1 had to reach out from the joist he was straddling. As he did, he lost his bal ance and fell. He sustained facial lacerations and fractures to both wrists in t he fall. He was transported to a shock trauma unit and was hospitalized.
Citation and rule
Type
Proposed
Current
Issued
Status
Citation 1, item 1
29 CFR 1926.701(b) · Concrete and Masonry Construction: general requirements
Incident on Nov 21, 2003: Employee is injured in fall
At approximately 8:31 a.m. on November 21, 2003, Employee #1 was installing conn ecting-steel, when he fell 14 ft 3 in. to the ground. Employee #1 landed between the reinforcing steel bars (rebar) that protruded approximately 2.5 ft above th e concrete floor. Employee #1 was hospitalized and treated for a broken arm and ribs. Employee was not wearing a harness at the time of the accident.
Citation and rule
Type
Proposed
Current
Issued
Status
Citation 1, item 1
29 CFR 1926.701(b) · Concrete and Masonry Construction: general requirements
(a) Basic requirement. When an authorized government representative asks for the records you keep under part 1904, you must provide copies of the records within four (4) business hours.
(ii) The label for bulk shipments of hazardous chemicals must be on the immediate container, transmitted with the shipping papers or the bills of lading, or, with the agreement of the receiving entity, transmitted by technological or electronic means so that it is immediately available to workers in printed form on the receiving end of shipment.
29 CFR 1910.178 · Forklifts and other powered industrial trucks
29 CFR 1910.178(a)(4)
(4) Modifications and additions which affect capacity and safe operation shall not be performed by the customer or user without manufacturers prior written approval. Capacity, operation, and maintenance instruction plates, tags, or decals shall be changed accordingly.
Alert subscribers get notified of each newly cited employer in Maryland the morning it is posted. See the alert plans.
Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.