OSHA SearchOSHA records by employer

Schweid and Sons South LLC: OSHA inspections and violations

College Park, Georgia · Meat Processed from Carcasses · NAICS 311612

3inspections
9citation items
$33,061current penalties
Mar 10, 2025last inspection

OSHA has inspected Schweid and Sons South LLC 3 times in Georgia since 2019.

The latest one began on Mar 10, 2025 after a complaint, in College Park.

Those inspections ended with 9 citation items: 6 serious and 3 other-than-serious.

Penalties were first proposed at $58,734 and now stand at $33,061, 44% lower after settlements or reviews.

Lockout/tagout comes up most often in these citations: 4 items under 1910.147.

How that compares: the median penalty per cited inspection for manufacturing employers since 2015 is $4,870, and Schweid and Sons South LLC averages $11,020 (3 cited inspections).

It reported 1 severe injury to OSHA since 2015.

Schweid and Sons South LLC: OSHA citation items per year, 2019 to 2025
Citation items per year, by inspection date.

Georgia · latest 90 days of OSHA records

148employers cited

Get notified the morning OSHA posts each new citation in Georgia: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Georgia

Checking a subcontractor, a client or your own company? Watch Schweid and Sons South LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 348109794 OPENED MAR 10, 2025Closed

Complaint · Partial · Safety · 112 employees at the site · Closed May 26, 2026

4280 Stacks Rd, College Park, GA 30349 · Meat Processed from Carcasses · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
OSH Act Section 5(a)(1) · General Duty Clause
Serious$8,513$4,200Sep 8, 2025Final
Citation 1, item 2
29 CFR 1910.22(a)(3) · Walking-working surfaces
Serious$5,107$2,600Sep 8, 2025Final
Citation 1, item 3
29 CFR 1910.147(c)(4)(ii) · Lockout/tagout
Serious$8,513$4,300Sep 8, 2025Final
Citation 2, item 1
29 CFR 1910.36(g)(4) · Exit route design
Other-than-serious$0$0Sep 8, 2025Final

Inspection 344631981 OPENED FEB 6, 2020Closed

Referral · Partial · Health · 110 employees at the site · Closed Jul 7, 2021

4280 Stacks Road, College Park, GA 30349 · Meat Processed from Carcasses · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.147(c)(4)(i) · Lockout/tagout
Serious$13,494$8,096Jun 9, 2020Final
Citation 2, item 1
29 CFR 1904.39(a)(2) · Reporting deaths and severe injuries
Other-than-serious$10,603$6,362Jun 9, 2020Final

Inspection 343829610 OPENED MAR 6, 2019Closed

Referral · Partial · Safety · 84 employees at the site · Closed Mar 18, 2021

4280 Stacks Rd., College Park, GA 30349 · Meat Processed from Carcasses · OSHA's record · Phone and website on Google Maps

Incident on Mar 6, 2019: Employee's right arm is amputated in meat grinder

At approximately 12:00 a.m. on March 6, 2019, an employee who is a maintenance technician was in the process of removing and replacing a 65-inch motor belt in a meat grinder mixer. The motor belt was installed behind a gearbox that drove two chains via sprockets. After removing and replacing the motor belt, the employee reached inside the motor compartment to secure the motor base, which was loosened in order to facilitate the removal and replacement of the belt. While tightening the motor base plate bolts, the motor started to turn inadvertently. The chain located on the right side amputated his right arm after wedging it against the lower sprocket. The employee was hospitalized for this injury.

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a Serious$10,419$6,251Aug 13, 2019Final
Citation 1, item 1b
29 CFR 1910.147(c)(7)(i)(a) · Lockout/tagout
Serious$0$0Aug 13, 2019Final
Citation 2, item 1
29 CFR 1904.32(b)(6) · Yearly injury summary
Other-than-serious$2,085$1,251Aug 13, 2019Final

Severe injury reports

Employers must report any work-related amputation, in-patient hospitalization or loss of an eye to OSHA within 24 hours. 1 report on file.

Feb 26, 2019, College Park: Hospitalization, amputation · amputations · arm(s), n.e.c.

A maintenance technician was replacing a 65-inch motor belt in a grinder mixer. The belt was installed behind a gear box that drove two chains via sprockets. The employee's right arm was inside the motor compartment when it suddenly started to turn. One of the chains amputated his right arm after wedging it against the sprocket.

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1904.32 · Yearly injury summary

29 CFR 1904.32(b)(6)

(6) When do I have to post the annual summary? You must post the summary no later than February 1 of the year following the year covered by the records and keep the posting in place until April 30.

29 CFR 1904.39 · Reporting deaths and severe injuries

29 CFR 1904.39(a)(2)

(2) Within twenty-four (24) hours after the in-patient hospitalization of one or more employees or an employee's amputation or an employee's loss of an eye, as a result of a work-related incident, you must report the in-patient hospitalization, amputation, or loss of an eye to OSHA.

29 CFR 1910.147 · Lockout/tagout

29 CFR 1910.147(c)(4)(i)

(4) Energy control procedure. (i) Procedures shall be developed, documented and utilized for the control of potentially hazardous energy when employees are engaged in the activities covered by this section.

29 CFR 1910.22 · Walking-working surfaces

29 CFR 1910.36 · Exit route design

OSH Act Section 5 · General Duty Clause

Other meat processed from carcasses employers in Georgia

Alert subscribers get notified of each newly cited employer in Georgia the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.