OSHA SearchOSHA records by employer

Southern Customs, Inc.: OSHA inspections and violations

Ellijay, Georgia · Automotive Glass Replacement Shops · NAICS 811122

1inspections
11citation items
$1,200current penalties
Mar 12, 2015last inspection

Southern Customs, Inc. has one OSHA inspection on record in Georgia.

OSHA opened it on Mar 12, 2015 after a complaint, in Ellijay.

From that inspection OSHA issued 11 citation items: 11 serious.

OSHA proposed $1,200 in penalties and the amount has not been reduced.

Most often, OSHA cited 1910.107, spray painting and finishing (5 items).

For context, across all repair and personal services employers the median penalty per cited inspection since 2015 is $1,200. Southern Customs, Inc. averages $1,200 over 1 cited inspection in that time.

Southern Customs, Inc.: OSHA citation items per year, 2015 to 2015
Citation items per year, by inspection date.

Georgia · latest 90 days of OSHA records

148employers cited

Get notified the morning OSHA posts each new citation in Georgia: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Georgia

Checking a subcontractor, a client or your own company? Watch Southern Customs, Inc. and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 340459759 OPENED MAR 12, 2015Closed

Complaint · Partial · Health · 5 employees at the site · Closed Sep 1, 2016

449 River Street, Ellijay, GA 30540 · Automotive Glass Replacement Shops · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
OSH Act Section 5(a)(1) · General Duty Clause
Serious$0$0Jul 31, 2015Final
Citation 1, item 2a
29 CFR 1910.106(d)(4)(i) · Flammable liquids
Serious$0$0Jul 31, 2015Final
Citation 1, item 2b
29 CFR 1910.106(d)(4)(iii) · Flammable liquids
Serious$0$0Jul 31, 2015Final
Citation 1, item 3a
29 CFR 1910.107(b)(1) · Spray painting and finishing
Serious$0$0Jul 31, 2015Final
Citation 1, item 3b
29 CFR 1910.107(c)(3) · Spray painting and finishing
Serious$0$0Jul 31, 2015Final
Citation 1, item 3c
29 CFR 1910.107(c)(6) · Spray painting and finishing
Serious$0$0Jul 31, 2015Final
Citation 1, item 4a
29 CFR 1910.107(e)(2) · Spray painting and finishing
Serious$0$0Jul 31, 2015Final
Citation 1, item 4b
29 CFR 1910.107(g)(7) · Spray painting and finishing
Serious$0$0Jul 31, 2015Final
Citation 1, item 5a
29 CFR 1910.134(c)(1) · Respiratory protection
Serious$1,200$1,200Jul 31, 2015Final
Citation 1, item 5b
29 CFR 1910.134(e)(1) · Respiratory protection
Serious$0$0Jul 31, 2015Final
Citation 1, item 5c
29 CFR 1910.134(k)(1) · Respiratory protection
Serious$0$0Jul 31, 2015Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.106 · Flammable liquids

29 CFR 1910.106(d)(4)(i)

(4) Design and construction of inside storage rooms—(i) Construction. Inside storage rooms shall be constructed to meet the required fire-resistive rating for their use. Such construction shall comply with the test specifications set forth in Standard Methods of Fire Tests of Building Construction and Materials, NFPA 251-1969. Where an automatic sprinkler system is provided, the system shall be designed and installed in an acceptable manner. Openings to other rooms or buildings shall be provided with noncombustible liquid-tight raised sills or ramps at least 4 inches in height, or the floor in the storage area shall be at least 4 inches below the surrounding floor. Openings shall be provided with approved self-closing fire doors. The room shall be liquid-tight where the walls join the floor. A permissible alternate to the sill or ramp is an open-grated trench inside of the room which dra

29 CFR 1910.106(d)(4)(iii)

(iii) Wiring. Electrical wiring and equipment located in inside storage rooms used for Category 1 or 2 flammable liquids, or Category 3 flammable liquids with a flashpoint below 100 °F (37.8 °C), shall be approved under subpart S of this part for Class I, Division 2 Hazardous Locations; for Category 3 flammable liquids with a flashpoint at or above 100 °F (37.8 °C) and Category 4 flammable liquids, shall be approved for general use.

29 CFR 1910.107 · Spray painting and finishing

29 CFR 1910.107(b)(1)

(b) Spray booths—(1) Construction. Spray booths shall be substantially constructed of steel, securely and rigidly supported, or of concrete or masonry except that aluminum or other substantial noncombustible material may be used for intermittent or low volume spraying. Spray booths shall be designed to sweep air currents toward the exhaust outlet.

29 CFR 1910.134 · Respiratory protection

OSH Act Section 5 · General Duty Clause

Other automotive glass replacement shops employers in Georgia

Alert subscribers get notified of each newly cited employer in Georgia the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.