Inspection 349049874 OPENED JUL 14, 2026Closed
12451 Walker Pond Road, Winter Garden, FL 34787 · Site Preparation Contractors · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
Southern Development & Construction, Inc has 3 OSHA inspections on record in Florida, the first in 2017.
OSHA's last visit started on Jul 14, 2026 on a referral, in Winter Garden.
Across those inspections OSHA issued 3 citation items: 2 serious and 1 other-than-serious.
OSHA proposed $31,197 in penalties. After settlements and reviews the total is $14,109, down 55%.
For context, across all construction employers the median penalty per cited inspection since 2015 is $3,080. Southern Development & Construction, Inc averages $7,054 over 2 cited inspections in that time.
Southern Development & Construction, Inc also files yearly injury logs with OSHA, summarized below.
It reported 3 severe injuries to OSHA since 2015.
Florida · latest 90 days of OSHA records
321employers cited
5 of them in the same industry
Get notified the morning OSHA posts each new citation in Florida: the employer, the site address, the rules broken and the penalty.
See who gets cited nextLatest cited in Florida
Checking a subcontractor, a client or your own company? Watch Southern Development & Construction, Inc and get notified the morning OSHA posts a new citation for it.
Watch this company12451 Walker Pond Road, Winter Garden, FL 34787 · Site Preparation Contractors · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
W Chapman Road/ Tetra Rd, Oviedo, FL 32762 · Site Preparation Contractors · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1a 29 CFR 1926.20(b)(2) · Construction safety programs |
Serious | $11,524 | $4,610 | Mar 27, 2024 | Final |
| Citation 1, item 1b 29 CFR 1926.21(b)(1) · Construction safety training |
Serious | $11,524 | $4,610 | Mar 27, 2024 | Final |
4480 Boggy Creek Road, Kissimmee, FL 34744 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps
Incident on Jun 16, 2017: Employee's hand is caught between pipes and is fractured
At 1:30 p.m. on June 16, 2017, Employee #1, employed by a construction company, was working at a commercial building construction project. He was reaching over piping when he lost his footing and fell over the pipes. He used his left hand to break his fall, and his hand became caught between two pipes. Emergency services were called, and Employee #1 was transported to the hospital. He was admitted and treated for a fractured left hand.
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1904.39(a)(2) · Reporting deaths and severe injuries |
Other-than-serious | $8,149 | $4,889 | Jun 21, 2017 | Final |
From the Form 300A summaries employers file with OSHA each year. Rate = recordable cases per 100 full-time workers.
In 2025, the Oviedo site logged 7 recordable injuries or illnesses among about 498 workers: 1.3 per 100 full-time workers, against a median of 3.0 for its industry. Those cases cost 37 days away from work.
| Site and year | Workers | Cases | Days-away cases | Rate | Industry median |
|---|---|---|---|---|---|
| Southern Development and Construction Oviedo · 2025 | 498 | 7 | 6 | 1.3 | 3.0 |
| Southern Development & Construction, Inc. Oviedo · 2020 | 230 | 6 | 4 | 2.8 | 1.0 |
Included with any plan: 5 more yearly logs from these sites, back to 2019, with each site's average rate over its latest three years. Already a subscriber? Sign in.
See plansEmployers must report any work-related amputation, in-patient hospitalization or loss of an eye to OSHA within 24 hours. 3 reports on file.
Jul 19, 2023, Kissimmee: Hospitalization · effects of heat and light, n.e.c. · body systems
An employee was working as a tail man on a pipe crew, laying pipe and doing inverts. They showed signs of heat stress and sustained dehydration.
Feb 15, 2022, Winter Garden: Hospitalization · cuts, lacerations · chest, except internal location of diseases or disorders
An employee was cutting a length of PVC pipe with a gas-powered saw. The saw blade failed causing the saw to kick back and hit the operator in the chest. The employee sustained a 2-by-6 inch long cut to his chest requiring hospitalization to repair tendons.
Jun 16, 2017, Kissimmee: Hospitalization · fractures · hand(s), unspecified
An employee was reaching over piping when he lost his footing and fell over the piping. While falling, he used his left hand to break his fall. His hand was then caught and fractured between two pipes.
Current text from the Code of Federal Regulations. Some citations were issued under older wording.
29 CFR 1904.39(a)(2)
(2) Within twenty-four (24) hours after the in-patient hospitalization of one or more employees or an employee's amputation or an employee's loss of an eye, as a result of a work-related incident, you must report the in-patient hospitalization, amputation, or loss of an eye to OSHA.
29 CFR 1926.20(b)(2)
(2) Such programs shall provide for frequent and regular inspections of the job sites, materials, and equipment to be made by competent persons designated by the employers.
29 CFR 1926.21(b)(1)
(b) Employer responsibility. (1) The employer should avail himself of the safety and health training programs the Secretary provides.
Alert subscribers get notified of each newly cited employer in Florida the morning it is posted. See the alert plans.
Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.