Inspection 343001954 OPENED MAR 7, 2018Closed
1572 Tilco Drive, Frederick, MD 21704 · Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing · OSHA's record · Phone and website on Google Maps
Incident on Mar 7, 2018: Employee testing equipment sustains an electric shock
At 6:00 a.m. on March 7, 2018, an employee was working for a manufacturer of air conditioning equipment. He was preparing to do a functional test on a condenser unit. He was removing the leads from a power distribution block. The employee failed to ensure that the disconnect switch that fed power at 480 volts to the condenser unit was in the 'off' position and locked out. The employee was removing the leads from the distribution block with a folding hex wrench. He came into contact with one off the leads, which was energized at 480 volts. He sustained an electric shock. He lost consciousness. The electric current entered his body through his right hand and exited through his left hand. He received second degree burns on both hands and he was hospitalized.
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1910.138(a) · Gloves and hand protection |
Serious | $4,325 | $2,300 | Jul 10, 2018 | Final |
| Citation 1, item 2a 29 CFR 1910.147(c)(5)(i) · Lockout/tagout |
Serious | $3,325 | $2,000 | Jul 10, 2018 | Final |
| Citation 1, item 2b 29 CFR 1910.147(c)(5)(ii)(b) · Lockout/tagout |
Serious | $0 | $0 | Jul 10, 2018 | Final |
| Citation 1, item 2c 29 CFR 1910.147(f)(3)(i) · Lockout/tagout |
Serious | $0 | $0 | Jul 10, 2018 | Final |
| Citation 1, item 3 29 CFR 1910.147(c)(6)(i) · Lockout/tagout |
Serious | $4,325 | $3,800 | Jul 10, 2018 | Final |
| Citation 1, item 4 29 CFR 1910.147(c)(7)(i) · Lockout/tagout |
Serious | $3,325 | $2,000 | Jul 10, 2018 | Final |
| Citation 1, item 5a 29 CFR 1910.178(a)(4) · Forklifts and other powered industrial trucks |
Serious | $3,325 | $2,000 | Jul 10, 2018 | Final |
| Citation 1, item 5b 29 CFR 1910.178(a)(5) · Forklifts and other powered industrial trucks |
Serious | $0 | $0 | Jul 10, 2018 | Final |
| Citation 1, item 5c 29 CFR 1910.178(l)(4)(iii) · Forklifts and other powered industrial trucks |
Serious | $0 | $0 | Jul 10, 2018 | Final |
| Citation 1, item 6a 29 CFR 1910.184(d) · Slings |
Serious | $2,375 | $1,400 | Jul 10, 2018 | Final |
| Citation 1, item 6b 29 CFR 1910.184(i)(9)(iii) · Slings |
Serious | $0 | $0 | Jul 10, 2018 | Final |
| Citation 1, item 7a 29 CFR 1910.184(e)(1) · Slings |
Serious | $2,850 | $1,700 | Jul 10, 2018 | Final |
| Citation 1, item 7b 29 CFR 1910.184(e)(2)(i) · Slings |
Serious | $0 | $0 | Jul 10, 2018 | Final |
| Citation 1, item 7c 29 CFR 1910.184(e)(2)(ii) · Slings |
Serious | $0 | $0 | Jul 10, 2018 | Final |
| Citation 1, item 7d 29 CFR 1910.184(e)(4) · Slings |
Serious | $0 | $0 | Jul 10, 2018 | Final |
| Citation 1, item 8 29 CFR 1910.212(a)(1) · Machine guarding |
Serious | $3,325 | $2,000 | Jul 10, 2018 | Final |
| Citation 1, item 9a 29 CFR 1910.212(a)(3)(ii) · Machine guarding |
Serious | $2,850 | $2,000 | Jul 10, 2018 | Final |
| Citation 1, item 9b 29 CFR 1910.212(a)(3)(iii) · Machine guarding |
Serious | $0 | $0 | Jul 10, 2018 | Final |
| Citation 1, item 10 29 CFR 1910.212(a)(5) · Machine guarding |
Serious | $2,850 | $1,500 | Jul 10, 2018 | Final |
| Citation 1, item 11 29 CFR 1910.212(b) · Machine guarding |
Serious | $2,375 | $1,400 | Jul 10, 2018 | Final |
| Citation 1, item 12 29 CFR 1910.242(b) · Hand and power tools |
Serious | $3,325 | $2,900 | Jul 10, 2018 | Final |
| Citation 1, item 13 29 CFR 1910.252(b)(2)(iii) · Welding fire safety |
Serious | $3,325 | $0 | Jul 10, 2018 | Final |
| Citation 1, item 14 29 CFR 1910.254(d)(9)(iii) · Arc welding and cutting |
Serious | $2,850 | $0 | Jul 10, 2018 | Final |
| Citation 1, item 15 29 CFR 1910.303(b)(1) · Electrical equipment, general requirements |
Serious | $3,325 | $2,000 | Jul 10, 2018 | Final |
| Citation 1, item 16 29 CFR 1910.303(b)(2) · Electrical equipment, general requirements |
Serious | $3,325 | $2,900 | Jul 10, 2018 | Final |
| Citation 1, item 17 29 CFR 1910.303(g)(2)(i) · Electrical equipment, general requirements |
Serious | $4,800 | $2,500 | Jul 10, 2018 | Final |
| Citation 1, item 18 29 CFR 1910.304(g)(6)(vi)(c)(1) · Grounding and circuit protection |
Serious | $2,375 | $1,200 | Jul 10, 2018 | Final |
| Citation 1, item 19 29 CFR 1910.305(b)(2)(i) · Electrical wiring methods |
Serious | $2,850 | $1,500 | Jul 10, 2018 | Final |
| Citation 1, item 20 29 CFR 1910.305(j)(1)(i) · Electrical wiring methods |
Serious | $2,850 | $1,500 | Jul 10, 2018 | Final |
| Citation 1, item 21 29 CFR 1910.333(a)(2) · Working near live electrical parts |
Serious | $3,800 | $3,400 | Jul 10, 2018 | Final |
| Citation 1, item 22 29 CFR 1910.334(c)(1) · Using electrical equipment |
Serious | $3,800 | $2,000 | Jul 10, 2018 | Final |
| Citation 1, item 23a 29 CFR 1910.335(a)(1)(i) · Safeguards for personnel protection |
Serious | $3,325 | $1,700 | Jul 10, 2018 | Final |
| Citation 1, item 23b 29 CFR 1910.335(a)(2)(i) · Safeguards for personnel protection |
Serious | $0 | $0 | Jul 10, 2018 | Final |
| Citation 1, item 24 29 CFR 1926.405(j)(1)(i) · Job-site wiring |
Serious | $2,375 | $1,200 | Jul 10, 2018 | Final |
| Citation 1, item 25 29 CFR 1926.405(b)(2) · Job-site wiring |
Serious | $2,375 | $1,200 | Jul 10, 2018 | Final |
| Citation 1, item 26 29 CFR 1926.501(b)(1) · Fall protection in construction |
Serious | $2,850 | $1,500 | Jul 10, 2018 | Final |
| Citation 2, item 1 29 CFR 1910.132(d)(2) · Personal protective equipment, general requirements |
Other-than-serious | $0 | $0 | Jul 10, 2018 | Final |
| Citation 2, item 2 29 CFR 1910.147(c)(7)(iv) · Lockout/tagout |
Other-than-serious | $0 | $0 | Jul 10, 2018 | Final |
| Citation 2, item 3 29 CFR 1910.184(e)(3)(ii) · Slings |
Other-than-serious | $0 | $0 | Jul 10, 2018 | Final |
| Citation 2, item 4 29 CFR 1910.303(g)(2)(ii) · Electrical equipment, general requirements |
Other-than-serious | $0 | $0 | Jul 10, 2018 | Final |
| Citation 2, item 5 29 CFR 1910.304(g)(2)(ii) · Grounding and circuit protection |
Other-than-serious | $0 | $0 | Jul 10, 2018 | Final |
| Citation 2, item 6 29 CFR 1910.305(b)(1)(ii) · Electrical wiring methods |
Other-than-serious | $0 | $0 | Jul 10, 2018 | Final |
| Citation 2, item 7 29 CFR 1910.305(g)(1)(iv) · Electrical wiring methods |
Other-than-serious | $0 | $0 | Jul 10, 2018 | Final |
| Citation 2, item 8 29 CFR 1910.305(g)(2)(iii) · Electrical wiring methods |
Other-than-serious | $0 | $0 | Jul 10, 2018 | Final |