OSHA SearchOSHA records by employer

W M Plastics, Inc.: OSHA inspections and violations

Mchenry, Illinois · All Other Plastics Product Manufacturing · NAICS 326199

4inspections
26citation items
$56,907current penalties
Aug 23, 2016last inspection

Since 2003, OSHA inspectors have visited W M Plastics, Inc. in Illinois 4 times.

The most recent inspection opened on Aug 23, 2016 as a planned inspection, in Mchenry.

In all, OSHA issued 26 citation items: 21 serious and 5 other-than-serious.

The proposed penalties came to $59,382; today they stand at $56,907, 4% less.

The rule cited most here is 1910.147 (lockout/tagout), 5 times.

Among manufacturing employers, the typical cited inspection since 2015 ends with a $4,500 penalty. W M Plastics, Inc. averages $51,132 across 1 cited inspection.

W M Plastics, Inc.: OSHA citation items per year, 2003 to 2016
Citation items per year, by inspection date.

Illinois · latest 90 days of OSHA records

423employers cited

2 of them in the same industry

Get notified the morning OSHA posts each new citation in Illinois: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Illinois

Checking a subcontractor, a client or your own company? Watch W M Plastics, Inc. and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 341721694 OPENED AUG 23, 2016Closed

Planned · Partial · Safety · 100 employees at the site · Closed May 16, 2017

5151 Bolger Court, Mchenry, IL 60050 · All Other Plastics Product Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.147(c)(4)(ii) · Lockout/tagout
Serious$6,236$6,236Dec 9, 2016Final
Citation 1, item 2
29 CFR 1910.147(c)(6)(i) · Lockout/tagout
Serious$4,988$4,988Dec 9, 2016Final
Citation 1, item 3
29 CFR 1910.212(a)(1) · Machine guarding
Serious$4,988$4,988Dec 9, 2016Final
Citation 1, item 4
29 CFR 1910.215(a)(2) · Grinders and abrasive wheels
Serious$4,988$4,988Dec 9, 2016Final
Citation 1, item 5
29 CFR 1910.303(b)(7)(i) · Electrical equipment, general requirements
Serious$4,988$4,988Dec 9, 2016Final
Citation 1, item 6 Serious$6,236$6,236Dec 9, 2016Final
Citation 1, item 7a
29 CFR 1910.333(a) · Working near live electrical parts
Serious$6,236$6,236Dec 9, 2016Final
Citation 1, item 7b
29 CFR 1910.333(b)(2)(i) · Working near live electrical parts
Serious$0$0Dec 9, 2016Final
Citation 1, item 8a
29 CFR 1910.334(c)(1) · Using electrical equipment
Serious$6,236$6,236Dec 9, 2016Final
Citation 1, item 8b
29 CFR 1910.333(c)(2) · Working near live electrical parts
Serious$0$0Dec 9, 2016Final
Citation 1, item 9a
29 CFR 1910.335(a)(1)(i) · Safeguards for personnel protection
Serious$6,236$6,236Dec 9, 2016Final
Citation 1, item 9b
29 CFR 1910.335(a)(1)(iv) · Safeguards for personnel protection
Serious$0$0Dec 9, 2016Final
Citation 1, item 9c
29 CFR 1910.335(a)(1)(v) · Safeguards for personnel protection
Serious$0$0Dec 9, 2016Final
Citation 2, item 1
29 CFR 1910.38(a) · Emergency action plans
Other-than-serious$0$0Dec 9, 2016Final

Inspection 314039934 OPENED NOV 16, 2010Closed

Follow-up · Partial · Safety · 85 employees at the site · Closed Nov 16, 2010

5151 Bolger Court, Mchenry, IL 60050 · All Other Plastics Product Manufacturing · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 314037144 OPENED AUG 31, 2010Closed

Planned · Partial · Safety · 85 employees at the site · Closed Nov 16, 2010

5151 Bolger Court, Mc Henry, IL 60050 · All Other Plastics Product Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.147(c)(4)(i) · Lockout/tagout
Serious$1,000$700Sep 21, 2010Closed
Citation 1, item 2
29 CFR 1910.147(c)(6)(i) · Lockout/tagout
Serious$1,000$700Sep 21, 2010Closed
Citation 1, item 3
29 CFR 1910.178(g)(2) · Forklifts and other powered industrial trucks
Serious$1,000$700Sep 21, 2010Closed
Citation 1, item 4
29 CFR 1910.212(a)(1) · Machine guarding
Serious$1,000$700Sep 21, 2010Closed
Citation 1, item 5
29 CFR 1910.335(a)(1)(i) · Safeguards for personnel protection
Serious$1,250$875Sep 21, 2010Closed
Citation 2, item 1
29 CFR 1910.178(l)(4)(iii) · Forklifts and other powered industrial trucks
Other-than-serious$0$0Sep 21, 2010Closed
Citation 2, item 2
29 CFR 1910.179(j)(2)(iii) · Overhead and gantry cranes
Other-than-serious$0$0Sep 21, 2010Closed
Citation 2, item 3
29 CFR 1910.179(m)(1) · Overhead and gantry cranes
Other-than-serious$0$0Sep 21, 2010Closed
Citation 2, item 4
29 CFR 1910.1200(e)(1) · Hazard communication
Other-than-serious$0$0Sep 21, 2010Closed

Inspection 305162166 OPENED MAY 15, 2003Closed

Planned · Partial · Safety · 70 employees at the site · Closed Oct 17, 2003

5151 Bolger Court, Mchenry, IL 60050 · All Other Plastics Product Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.147(c)(1) · Lockout/tagout
Serious$1,000$700May 20, 2003Closed
Citation 1, item 2
29 CFR 1910.212(a)(1) · Machine guarding
Serious$1,000$700May 20, 2003Closed
Citation 1, item 3
29 CFR 1910.212(a)(3)(ii) · Machine guarding
Serious$1,000$700May 20, 2003Closed

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.1200 · Hazard communication

29 CFR 1910.1200(e)(1)

(e) Written hazard communication program. (1) Employers shall develop, implement, and maintain at each workplace, a written hazard communication program which at least describes how the criteria specified in paragraphs (f), (g), and (h) of this section for labels and other forms of warning, safety data sheets, and employee information and training will be met, and which also includes the following:

29 CFR 1910.147 · Lockout/tagout

29 CFR 1910.147(c)(1)

(c) General—(1) Energy control program. The employer shall establish a program consisting of energy control procedures, employee training and periodic inspections to ensure that before any employee performs any servicing or maintenance on a machine or equipment where the unexpected energizing, start up or release of stored energy could occur and cause injury, the machine or equipment shall be isolated from the energy source, and rendered inoperative.

29 CFR 1910.147(c)(4)(i)

(4) Energy control procedure. (i) Procedures shall be developed, documented and utilized for the control of potentially hazardous energy when employees are engaged in the activities covered by this section.

29 CFR 1910.178 · Forklifts and other powered industrial trucks

29 CFR 1910.179 · Overhead and gantry cranes

29 CFR 1910.212 · Machine guarding

29 CFR 1910.215 · Grinders and abrasive wheels

29 CFR 1910.303 · Electrical equipment, general requirements

29 CFR 1910.332 · Training

29 CFR 1910.333 · Working near live electrical parts

29 CFR 1910.334 · Using electrical equipment

29 CFR 1910.335 · Safeguards for personnel protection

29 CFR 1910.38 · Emergency action plans

Other all other plastics product manufacturing employers in Illinois

Alert subscribers get notified of each newly cited employer in Illinois the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.