OSHA SearchOSHA records by employer

Whirl Air Flow Corp: OSHA inspections and violations

Big Lake, Minnesota · Conveyor and Conveying Equipment Manufacturing · NAICS 333922

7inspections
30citation items
$5,570current penalties
Oct 5, 2017last inspection

Whirl Air Flow Corp has 7 OSHA inspections on record in Minnesota, the first in 1982.

OSHA's last visit started on Oct 5, 2017 as a planned inspection, in Big Lake.

Across those inspections OSHA issued 30 citation items: 15 serious, 2 repeat and 13 other-than-serious.

OSHA proposed $10,700 in penalties. After settlements and reviews the total is $5,570, down 48%.

Most often, OSHA cited 1910.212, machine guarding (4 items).

For context, across all manufacturing employers the median penalty per cited inspection since 2015 is $3,600. Whirl Air Flow Corp averages $2,250 over 1 cited inspection in that time.

Whirl Air Flow Corp: OSHA citation items per year, 1982 to 2017
Citation items per year, by inspection date.

Minnesota · latest 90 days of OSHA records

371employers cited

Get notified the morning OSHA posts each new citation in Minnesota: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Minnesota

Checking a subcontractor, a client or your own company? Watch Whirl Air Flow Corp and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 342701026 OPENED OCT 5, 2017Closed

Planned · Complete · Safety · 20 employees at the site · Closed Jan 2, 2018

20055 177th St, Big Lake, MN 55309 · All Other Miscellaneous Fabricated Metal Product Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1 Repeat$625$625Oct 31, 2017Final
Citation 1, item 2 Repeat$625$625Oct 31, 2017Final
Citation 2, item 1
29 CFR 1910.212(a)(3)(ii) · Machine guarding
Serious$875$875Oct 31, 2017Final
Citation 2, item 2 Serious$125$125Oct 31, 2017Final

Inspection 317898088 OPENED OCT 22, 2014Closed

Planned · Complete · Safety · 29 employees at the site · Closed Feb 25, 2016

20055 177th St, Big Lake, MN 55309 · Conveyor and Conveying Equipment Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.147(c)(4)(i) · Lockout/tagout
Serious$450$71Nov 5, 2014Final
Citation 1, item 2
29 CFR 1910.147(c)(6)(i) · Lockout/tagout
Serious$450$71Nov 5, 2014Final
Citation 1, item 3
29 CFR 1910.212(a)(1) · Machine guarding
Serious$900$142Nov 5, 2014Final
Citation 1, item 4
29 CFR 1910.219(c)(2)(i) · Belts, pulleys and power-transmission parts
Serious$750$118Nov 5, 2014Final
Citation 1, item 5
29 CFR 1910.219(c)(4)(i) · Belts, pulleys and power-transmission parts
Serious$750$118Nov 5, 2014Final
Citation 1, item 6
29 CFR 1910.219(d)(1) · Belts, pulleys and power-transmission parts
Serious$750$118Nov 5, 2014Final
Citation 1, item 7
29 CFR 1910.304(g)(5) · Grounding and circuit protection
Serious$750$118Nov 5, 2014Final
Citation 2, item 1
29 CFR 1910.178(l)(4)(iii) · Forklifts and other powered industrial trucks
Other-than-serious$300$47Nov 5, 2014Final
Citation 2, item 2
29 CFR 1910.179(j)(2) · Overhead and gantry cranes
Other-than-serious$150$24Nov 5, 2014Final
Citation 2, item 3 Other-than-serious$300$47Nov 5, 2014Final
Citation 2, item 4 Other-than-serious$150$24Nov 5, 2014Final

Inspection 315597245 OPENED MAY 20, 2011Closed

Planned · Complete · Health · 30 employees at the site · Closed Jul 28, 2011

20055 177th St, Big Lake, MN 55309 · Conveyor and Conveying Equipment Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1 Serious$600$600Jun 22, 2011Closed
Citation 1, item 2
29 CFR 1910.134(a)(2) · Respiratory protection
Serious$450$450Jun 22, 2011Closed
Citation 1, item 3 Serious$600$600Jun 22, 2011Closed

Inspection 311746168 OPENED JAN 11, 2008Closed

Planned · Complete · Safety · 30 employees at the site · Closed Feb 14, 2008

20055 177th St, Big Lake, MN 55309 · Conveyor and Conveying Equipment Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.212(a)(1) · Machine guarding
Serious$300$210Jan 24, 2008Closed
Citation 1, item 2
29 CFR 1910.252(b)(2)(iii) · Welding fire safety
Serious$300$210Jan 24, 2008Closed
Citation 1, item 3
29 CFR 1910.253(b)(2)(ii) · Gas welding and cutting
Serious$300$210Jan 24, 2008Closed
Citation 2, item 1
29 CFR 1910.215(b)(9) · Grinders and abrasive wheels
Other-than-serious$100$70Jan 24, 2008Closed
Citation 2, item 2
29 CFR 1910.253(b)(4)(iii) · Gas welding and cutting
Other-than-serious$100$70Jan 24, 2008Closed

Inspection 111639860 OPENED FEB 16, 1990Closed

Planned · Complete · Safety · 80 employees at the site · Closed May 12, 1990

1515 Central Ave. N.e., Minneapolis, MN 55418 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1 Other-than-serious$0$0Mar 15, 1990Closed
Citation 1, item 2 Other-than-serious$0$0Mar 15, 1990Closed
Citation 1, item 3
29 CFR 1910.106(d)(4)(iv) · Flammable liquids
Other-than-serious$0$0Mar 15, 1990Closed
Citation 1, item 4
29 CFR 1910.107(c)(6) · Spray painting and finishing
Other-than-serious$0$0Mar 15, 1990Closed
Citation 1, item 5
29 CFR 1910.157(e)(3) · Portable fire extinguishers
Other-than-serious$0$0Mar 15, 1990Closed
Citation 1, item 6
29 CFR 1910.305(b)(1) · Electrical wiring methods
Other-than-serious$0$0Mar 15, 1990Closed

Inspection 15434012 OPENED MAR 2, 1983Closed

Planned · Complete · Health · 70 employees at the site · Closed Apr 6, 1983

1515 Central Ave Ne, Minneapolis, MN 55413 · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 15429236 OPENED OCT 12, 1982Closed

Planned · Complete · Safety · 80 employees at the site · Closed Oct 22, 1982

1515 Central Ave Ne, Minneapolis, MN 55413 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.212(a)(1) · Machine guarding
Other-than-serious$0$0Oct 22, 1982Closed

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.106 · Flammable liquids

29 CFR 1910.106(d)(4)(iv)

(iv) Ventilation. Every inside storage room shall be provided with either a gravity or a mechanical exhaust ventilation system. Such system shall be designed to provide for a complete change of air within the room at least six times per hour. If a mechanical exhaust system is used, it shall be controlled by a switch located outside of the door. The ventilating equipment and any lighting fixtures shall be operated by the same switch. A pilot light shall be installed adjacent to the switch if Category 1 or 2 flammable liquids, or Category 3 flammable liquids with a flashpoint below 100 °F (37.8 °C), are dispensed within the room. Where gravity ventilation is provided, the fresh air intake, as well as the exhaust outlet from the room, shall be on the exterior of the building in which the room is located.

29 CFR 1910.107 · Spray painting and finishing

29 CFR 1910.107(c)(6)

(6) Wiring type approved. Electrical wiring and equipment not subject to deposits of combustible residues but located in a spraying area as herein defined shall be of explosion-proof type approved for Class I, group D locations and shall otherwise conform to the provisions of subpart S of this part, for Class I, Division 1, Hazardous Locations. Electrical wiring, motors, and other equipment outside of but within twenty (20) feet of any spraying area, and not separated therefrom by partitions, shall not produce sparks under normal operating conditions and shall otherwise conform to the provisions of subpart S of this part for Class I, Division 2 Hazardous Locations.

29 CFR 1910.134 · Respiratory protection

29 CFR 1910.134(a)(2)

(2) The CNP system defaults selected for test pressure shall be set at −15 mm of water (-0.58 inches of water) and the modeled inspiratory flow rate shall be 53.8 liters per minute for performing fit tests.

29 CFR 1910.147 · Lockout/tagout

29 CFR 1910.157 · Portable fire extinguishers

29 CFR 1910.178 · Forklifts and other powered industrial trucks

29 CFR 1910.179 · Overhead and gantry cranes

29 CFR 1910.212 · Machine guarding

29 CFR 1910.215 · Grinders and abrasive wheels

29 CFR 1910.219 · Belts, pulleys and power-transmission parts

29 CFR 1910.252 · Welding fire safety

29 CFR 1910.253 · Gas welding and cutting

29 CFR 1910.304 · Grounding and circuit protection

29 CFR 1910.305 · Electrical wiring methods

29 CFR 1910.95 · Noise

29 CFR 5205.1020

29 CFR 5205.116

29 CFR 5205.1200

29 CFR 5206.700

Other conveyor and conveying equipment manufacturing employers in Minnesota

Alert subscribers get notified of each newly cited employer in Minnesota the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.