OSHA SearchOSHA records by employer

Wood Systems, Inc.: OSHA inspections and violations

Tulsa, Oklahoma · Other Millwork (including Flooring) · NAICS 321918

3inspections
7citation items
$3,800current penalties
Dec 15, 2015last inspection

Wood Systems, Inc. has 3 OSHA inspections on record in Oklahoma, the first in 1989.

OSHA's last visit started on Dec 15, 2015 as a planned inspection, in Tulsa.

Across those inspections OSHA issued 7 citation items: 7 other-than-serious.

OSHA proposed $6,545 in penalties. After settlements and reviews the total is $3,800, down 42%.

Most often, OSHA cited 1926.405, job-site wiring (2 items).

For context, across all manufacturing employers the median penalty per cited inspection since 2015 is $4,500. Wood Systems, Inc. averages $3,800 over 1 cited inspection in that time.

Wood Systems, Inc. also files yearly injury logs with OSHA, summarized below.

It reported 1 severe injury to OSHA since 2015.

The Wage and Hour Division has 1 case on it since 2015, with $10,216 in back wages owed to workers.

Wood Systems, Inc.: OSHA citation items per year, 1989 to 2015
Citation items per year, by inspection date.

Oklahoma · latest 90 days of OSHA records

53employers cited

Get notified the morning OSHA posts each new citation in Oklahoma: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Oklahoma

Checking a subcontractor, a client or your own company? Watch Wood Systems, Inc. and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 341130045 OPENED DEC 15, 2015Closed

Planned · Partial · Safety · 60 employees at the site · Closed Jul 17, 2018

4615 S. 49th West Ave., Tulsa, OK 74107 · Other Millwork (including Flooring) · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.106(e)(6)(ii) · Flammable liquids
Other-than-serious$1,785$1,050Mar 2, 2016Final
Citation 1, item 2
29 CFR 1910.107(c)(6) · Spray painting and finishing
Other-than-serious$1,785$1,050Mar 2, 2016Final
Citation 1, item 3a
29 CFR 1910.147(c)(4)(i) · Lockout/tagout
Other-than-serious$2,975$1,700Mar 2, 2016Final
Citation 1, item 3b
29 CFR 1910.147(c)(6)(i) · Lockout/tagout
Other-than-serious$0$0Mar 2, 2016Final
Citation 2, item 1
29 CFR 1910.22(a)(1) · General requirements
Other-than-serious$0$0Mar 2, 2016Final

Inspection 301872529 OPENED NOV 6, 1997Closed

Planned · Complete · Safety · 5 employees at the site · Closed Nov 19, 1997

4923 East 4lst, Tulsa, OK 74135 · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 102255916 OPENED NOV 14, 1989Closed

Planned · Complete · Safety · 2 employees at the site · Closed Feb 20, 1990

5400 E. 68th St. South, Tulsa, OK 74136 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.405(g)(2)(iv) · Job-site wiring
Other-than-serious$0$0Jan 19, 1990Closed
Citation 1, item 1b
29 CFR 1926.405(g)(2)(iv) · Job-site wiring
Other-than-serious$0$0Jan 19, 1990Closed

Injury and illness logs

From the Form 300A summaries employers file with OSHA each year. Rate = recordable cases per 100 full-time workers.

In 2025, the Tulsa site logged 1 recordable injury or illness among about 129 workers: 0.7 per 100 full-time workers, against a median of 3.3 for its industry.

Site and yearWorkersCasesDays-away casesRateIndustry median
Mill Creek Lumber and Supply- Wood Systems
Tulsa · 2025
129 100.73.3
Wood Systems Inc-North
Tulsa · 2025
46 213.83.3
Wood Systems Inc
Tulsa · 2021
108 634.93.3

Included with any plan: 5 more yearly logs from these sites, back to 2021, with each site's average rate over its latest three years. Already a subscriber? Sign in.

See plans

Severe injury reports

Employers must report any work-related amputation, in-patient hospitalization or loss of an eye to OSHA within 24 hours. 1 report on file.

Oct 13, 2021, Tulsa: Amputation · amputations · fingertip(s)

An employee was attempting to retrieve a granite slab that was stacked behind multiple other slabs. One of the wedges the employee used to create a gap between the slabs fell and his left index finger was pinched between the slabs. The employee suffered an avulsion, which required surgical amputation of the fingertip.

Wage and hour cases

Cases by the Labor Department's Wage and Hour Division since 2015: unpaid minimum wage or overtime, child labor, family leave and more.

Period reviewedViolationsWorkers owedBack wagesPenalties
Mar 2, 2023 to Mar 1, 2025
TULSA
6160$10,216$0

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.106 · Flammable liquids

29 CFR 1910.106(e)(6)(ii)

(ii) Grounding. Category 1 or 2 flammable liquids, or Category 3 flammable liquids with a flashpoint below 100 °F (37.8 °C), shall not be dispensed into containers unless the nozzle and container are electrically interconnected. Where the metallic floorplate on which the container stands while filling is electrically connected to the fill stem or where the fill stem is bonded to the container during filling operations by means of a bond wire, the provisions of this section shall be deemed to have been complied with.

29 CFR 1910.107 · Spray painting and finishing

29 CFR 1910.107(c)(6)

(6) Wiring type approved. Electrical wiring and equipment not subject to deposits of combustible residues but located in a spraying area as herein defined shall be of explosion-proof type approved for Class I, group D locations and shall otherwise conform to the provisions of subpart S of this part, for Class I, Division 1, Hazardous Locations. Electrical wiring, motors, and other equipment outside of but within twenty (20) feet of any spraying area, and not separated therefrom by partitions, shall not produce sparks under normal operating conditions and shall otherwise conform to the provisions of subpart S of this part for Class I, Division 2 Hazardous Locations.

29 CFR 1910.147 · Lockout/tagout

29 CFR 1910.147(c)(4)(i)

(4) Energy control procedure. (i) Procedures shall be developed, documented and utilized for the control of potentially hazardous energy when employees are engaged in the activities covered by this section.

29 CFR 1910.22 · General requirements

29 CFR 1926.405 · Job-site wiring

Other other millwork (including flooring) employers in Oklahoma

Alert subscribers get notified of each newly cited employer in Oklahoma the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.