OSHA SearchOSHA records by employer

Z3 Letters - Signs LLC: OSHA inspections and violations

Winston Salem, North Carolina · Sign Manufacturing · NAICS 339950

1inspections
16citation items
$3,300current penalties
Jun 19, 2025last inspection

Z3 Letters - Signs LLC has one OSHA inspection on record in North Carolina.

OSHA opened it on Jun 19, 2025 as a planned inspection, in Winston Salem.

From that inspection OSHA issued 16 citation items: 4 serious and 12 other-than-serious.

OSHA proposed $3,300 in penalties and the amount has not been reduced.

Most often, OSHA cited 1910.134, respiratory protection (4 items).

For context, across all manufacturing employers the median penalty per cited inspection since 2015 is $3,600. Z3 Letters - Signs LLC averages $3,300 over 1 cited inspection in that time.

Z3 Letters - Signs LLC: OSHA citation items per year, 2025 to 2025
Citation items per year, by inspection date.

North Carolina · latest 90 days of OSHA records

231employers cited

2 of them in the same industry

Get notified the morning OSHA posts each new citation in North Carolina: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in North Carolina

Checking a subcontractor, a client or your own company? Watch Z3 Letters - Signs LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 348321993 OPENED JUN 19, 2025Closed

Planned · Complete · Health · 45 employees at the site · Closed Jan 7, 2026

300 Cassell Street, Winston Salem, NC 27107 · Sign Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.212(b) · Machine guarding
Serious$1,300$1,300Aug 15, 2025Final
Citation 1, item 3a
29 CFR 1910.334(a)(2)(ii) · Using electrical equipment
Serious$2,000$2,000Aug 15, 2025Final
Citation 1, item 3b
29 CFR 1910.303(b)(7) · Electrical equipment, general requirements
Serious$0$0Aug 15, 2025Final
Citation 1, item 3c
29 CFR 1910.304(g)(5) · Grounding and circuit protection
Serious$0$0Aug 15, 2025Final
Citation 2, item 1
29 CFR 1910.107(b)(5)(i) · Spray painting and finishing
Other-than-serious$0$0Aug 15, 2025Final
Citation 2, item 2
29 CFR 1910.107(b)(9) · Spray painting and finishing
Other-than-serious$0$0Aug 15, 2025Final
Citation 2, item 3
29 CFR 1910.132(d)(2) · Personal protective equipment, general requirements
Other-than-serious$0$0Aug 15, 2025Final
Citation 2, item 4
29 CFR 1910.134(c)(1) · Respiratory protection
Other-than-serious$0$0Aug 15, 2025Final
Citation 2, item 5
29 CFR 1910.134(f)(2) · Respiratory protection
Other-than-serious$0$0Aug 15, 2025Final
Citation 2, item 6
29 CFR 1910.134(h)(2)(i) · Respiratory protection
Other-than-serious$0$0Aug 15, 2025Final
Citation 2, item 7
29 CFR 1910.134(k)(3) · Respiratory protection
Other-than-serious$0$0Aug 15, 2025Final
Citation 2, item 8
29 CFR 1910.157(e)(2) · Portable fire extinguishers
Other-than-serious$0$0Aug 15, 2025Final
Citation 2, item 9
29 CFR 1910.178(l)(4)(iii) · Forklifts and other powered industrial trucks
Other-than-serious$0$0Aug 15, 2025Final
Citation 2, item 10
29 CFR 1910.1200(e)(1) · Hazard communication
Other-than-serious$0$0Aug 15, 2025Final
Citation 2, item 11
29 CFR 1910.1200(f)(6)(ii) · Hazard communication
Other-than-serious$0$0Aug 15, 2025Final
Citation 2, item 12
29 CFR 1910.1200(h)(1) · Hazard communication
Other-than-serious$0$0Aug 15, 2025Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.107 · Spray painting and finishing

29 CFR 1910.107(b)(5)(i)

(i) The spraying operations except electrostatic spraying operations shall be so designed, installed and maintained that the average air velocity over the open face of the booth (or booth cross section during spraying operations) shall be not less than 100 linear feet per minute. Electrostatic spraying operations may be conducted with an air velocity over the open face of the booth of not less than 60 linear feet per minute, or more, depending on the volume of the finishing material being applied and its flammability and explosion characteristics. Visible gauges or audible alarm or pressure activated devices shall be installed to indicate or insure that the required air velocity is maintained. Filter rolls shall be inspected to insure proper replacement of filter media.

29 CFR 1910.107(b)(9)

(9) Cleaning. Spray booths shall be so installed that all portions are readily accessible for cleaning. A clear space of not less than 3 feet on all sides shall be kept free from storage or combustible construction.

29 CFR 1910.1200 · Hazard communication

29 CFR 1910.1200(e)(1)

(e) Written hazard communication program. (1) Employers shall develop, implement, and maintain at each workplace, a written hazard communication program which at least describes how the criteria specified in paragraphs (f), (g), and (h) of this section for labels and other forms of warning, safety data sheets, and employee information and training will be met, and which also includes the following:

29 CFR 1910.132 · Personal protective equipment, general requirements

29 CFR 1910.134 · Respiratory protection

29 CFR 1910.157 · Portable fire extinguishers

29 CFR 1910.178 · Forklifts and other powered industrial trucks

29 CFR 1910.212 · Machine guarding

29 CFR 1910.303 · Electrical equipment, general requirements

29 CFR 1910.304 · Grounding and circuit protection

29 CFR 1910.334 · Using electrical equipment

Other sign manufacturing employers in North Carolina

Alert subscribers get notified of each newly cited employer in North Carolina the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.